Notification of NRC Design Bases Inspection (05000397/2016007) and Initial Request for Information
ML16061A554
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 03/01/2016
From: Thomas Farnholtz
Region 4 Engineering Branch 1
To: Reddemann M
Energy Northwest
R. Kopriva
References
IR 2016007
Download: ML16061A554 (9)


See also: IR 05000397/2016007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD

ARLINGTON, TX 76011-4511

March 1, 2016

Mr. M. E. Reddemann

Chief Executive Officer

Energy Northwest

P.O. Box 968, Mail Drop 1023

Richland, WA 99352-0968

SUBJECT: COLUMBIA GENERATING STATION - NOTIFICATION OF NRC DESIGN

BASES INSPECTION (05000397/2016007) AND INITIAL REQUEST FOR

INFORMATION

Dear Mr. Reddemann:

On June 6, 2016, the U.S. Nuclear Regulatory Commission (NRC) will begin a triennial baseline

Design Bases Inspection at the Columbia Generating Station. A 7-person team will perform this

inspection using the NRC Inspection Procedure 71111, Attachment 21M Design Bases

Inspection.

The inspection focuses on components and operator actions that have high risk and low design

margins. The samples reviewed during this inspection will be identified during an information

gathering visit and during the subsequent in-office preparation week. In addition, a number of

operating experience issues will also be selected for review.

The inspection will include an information gathering site visit by the team leader and a senior

reactor analyst, and two weeks of onsite inspection by the team. The inspection will consist of

five NRC inspectors and two contractors, of which six will focus on engineering and one on

operations. The current inspection schedule is as follows:

Onsite Information Gathering Visit: March 28-31, 2016

In-Office Preparation Week: May 23-27, 2016

Onsite Weeks: June 6-10, 2016, and June 20-24, 2016

The purpose of the information gathering visit is to meet with members of your staff to identify

potential risk-significant components and operator actions. The lead inspector will also request

a tour of the plant with members of your operations staff and probabilistic safety assessment

staff. During the onsite weeks, several days will be needed on the plant-referenced simulator in

order to facilitate the development of operator action-based scenarios. Additional information

and documentation needed to support the inspection will be identified during interviews with

engineering managers, engineers, and probabilistic safety assessment staff throughout the

inspection

M.E. Reddmann -2-

Our experience with these inspections has shown that they are extremely resource intensive,

both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact

on the site and to ensure a productive inspection, we have enclosed a request for information

needed for the inspection. The request has been divided into three groups. The first group lists

information necessary for the information gathering visit and for general preparation. This

information should be available to the regional office no later than April 27, 2016. Insofar as

possible, this information should be provided electronically to the lead inspector. Since the

inspection will be concentrated on high risk/low margin components, calculations associated

with your list of high risk components should be available to review during the information

gathering visit to assist in our selection of components based on available design margin.

The second group of documents requested is those items that the team will need access to

during the preparation week in order to finalize the samples to be inspected. The third group

lists information necessary to aid the inspection team in tracking issues identified as a result of

the inspection. It is requested that this information be provided to the lead inspector as the

information is generated during the inspection. Additional requests by inspectors will be made

throughout both onsite weeks for specific documents needed to complete the review of the

components selected. It is important that all of these documents are up to date and complete in

order to minimize the number of additional documents requested during the preparation and/or

the onsite portions of the inspection. In order to facilitate the inspection, we request that a

contact individual be assigned to each inspector to ensure information requests, questions, and

concerns are addressed in a timely manner.

The lead inspector for this inspection is Mr. Ronald A. Kopriva. We understand that our

licensing engineer contact for this inspection is Ms. Tracey Parmelee. If there are any questions

about the inspection or the requested materials, please contact the lead inspector by telephone

at 817-200-1104 or by e-mail at Ron.Kopriva@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control

number 3150 0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget control

number.

M.E. Reddmann -3-

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

made available electronically for public inspection in the NRC Public Document Room or from

the Publicly Available Records (PARS) component of NRCs document system (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/readinq-rm/adams.html

(the Public Electronic Reading Room).

Sincerely,

/RA/

Thomas R. Farnholtz,

Chief Engineering Branch 1

Division of Reactor Safety

Docket: 50-397

License: NPF-21

Enclosure:

Design Bases Inspection Request for Information

Electronic Distribution for Columbia Generating Station

Initial Request for Information for Information

Component Design Bases Inspection

Columbia Generating Station

Inspection Report: 05000397/2016007

Information Gathering Dates: Mach 28-31, 2016

Inspection Dates: June 6-10, 2016, and June 20-24, 2016

Inspection Procedure: IP 71111, Attachment 21M, Design Bases Inspection

Lead Inspector: Ronald A. Kopriva, Senior Reactor Inspector

I. Information Requested Prior to Information Gathering Visit (March 28, 2016)

The following information (Section 1 of this enclosure) should be sent to the Region IV office

in hard copy or electronic format (Certrec IMS preferred), to the attention of Ronald A.

Kopriva by March 28, 2016, to facilitate the reduction in the items to be selected for a final

list during the preparation week of May 2, 2016. The inspection team will finalize the

selected list during the prep week using the additional documents requested in Section II of

this enclosure. The specific items selected from the lists shall be available and ready for

review on the day indicated in this request. *Please provide requested documentation

electronically in .pdf files, Excel, or other searchable formats if possible. The information

should contain descriptive names, and be indexed and hyperlinked to facilitate ease of use.

Information in lists should contain enough information to be easily understood by someone

who has knowledge of boiling water reactor technology. If requested documents are large

and only hard copy formats are available, please inform the inspector(s), and provide

subject documentation during the first day of the onsite inspection.

1. An Excel spreadsheet of equipment basic events (with definitions) including importance

measures sorted by risk achievement worth (RAW) and Fussell-Vesely (FV) from your

internal events probabilistic risk assessment (PRA). Include basic events with RAW

value of 1.3 or greater.

2. Provide a list of the top 500 cut-sets from your PRA.

3. Copies of PRA system notebooks, and the latest PRA summary document.

4. An excel spreadsheet of PRA human action basic events or risk ranking of operator

actions from your site specific PSA sorted by RAW and FV. Provide copies of your

human reliability worksheets for these items.

5. If you have an external events or fire PSA model, provide the information requested in

items 1-4 for external events and fire.

6. Any pre-existing evaluation or list of components and associated calculations with low

design margins, (i.e., pumps closest to the design limit for flow or pressure, diesel

generator close to design required output, heat exchangers close to rated design heat

removal, etc.).

7. List of high risk maintenance rule systems/components and functions; based on

engineering or expert panel judgment. Include a list of structures, systems, and

components in the Maintenance Rule (a)(1) category.

8. Site top 10 issues list.

9. List of any common-cause failures of components in the last 3 years.

10. A list of operating experience evaluations for the last 2 years.

11. A list of all time-critical operator actions in procedures.

12. List of current operator workarounds/burdens and plans for resolution.

13. List of root cause evaluations associated with component failures or design issues

initiated/completed in the last 5 years.

14. List of motor-operated valves (MOVs) in the program, design margin and risk ranking.

15. List of air-operated valves (AOVs) in the valve program, design and risk ranking.

16. Current management and engineering organizational charts.

17. Columbia Generating Station, IPEEEs, if available electronically.

18. Mechanical piping drawings for:

  • Engineered safety features

19. Electrical one-line drawings for:

  • Offsite power/switchyard supplies
  • Normal AC power systems
  • Emergency AC/DC power systems (including 120VAC power and 125VDC/24VDC

safety class systems)

20. An electronic copy of the Design Bases Documents or System Design Criteria

documents.

21. An electronic copy of the System Health Notebooks.

22. Electronic copies of the Technical Specifications and the Updated Final Safety Analysis

Report.

II. Information Requested to be Available on First Day of Preparation Week

(May 23-27, 2016)

1. List of condition reports (corrective action documents) associated with each of the

selected components for the last 5 years.

2. The corrective maintenance history associated with each of the selected components for

the last 2 years.

3. A list of permanent and temporary modifications associated with each of the selected

components for the last 3 years.

4. Copies of calculations associated with each of the selected components (if not

previously provided), excluding data files. Please review the calculations and also

provide copies of reference material (such as drawings, engineering requests, and

vendor letters).

5. Copies of operability evaluations associated with each of the selected components and

plans for restoring operability, if applicable.

6. Trend data on the selected electrical/mechanical components performance for last

3 years (for example, pumps performance including in-service testing, other vibration

monitoring, oil sample results, etc., as applicable).

7. A copy of any internal/external self-assessments and associated corrective action

documents generated in preparation for the inspection.

8. A copy of engineering/operations related audits completed in the last 2 years.

9. Procedures used to accomplish operator actions associated with the basic events in

your PRA.

10. List of licensee contacts for the inspection team with pager or phone numbers.

Ill. Information Requested to be provided throughout the inspection.

1. Copies of any corrective action documents generated as a result of the teams questions

or queries during this inspection.

2. Copies of the list of questions submitted by the team members and the status/resolution

of the information requested (provide daily during the inspection to each team member).

3. Reference materials (available electronically and as needed during all onsite weeks):

  • General set of plant drawings
  • IPE/PRA report
  • Procurement documents for components selected
  • Plant procedures (normal, abnormal, emergency, surveillance, etc.)
  • Technical Specifications
  • Vendor manuals

Inspector Contact Information:

Ronald A. Kopriva

Senior Reactor Inspector

817-200-1104

Ron.Kopriva@nrc.gov

Mailing Address:

U.S. NRC, Region IV

Attn: Ron Kopriva

1600 East Lamar Blvd.

Arlington, TX 76011-4511

ML16061A554

SUNSI Review ADAMS: Sensitive Non-Publicly Available Keyword

By: RAK Yes No Non-Sensitive Publicly Available NRC-002

OFFICE DRS/EB1/SRI: EB1/C:

NAME RKopriva TFarnholtz

SIGNATURE /RA/ /RA/

DATE 3/1/16 3/1/16

Letter to Mark E. Reddemann from Thomas R. Farnholtz dated March 1, 2016

SUBJECT: COLUMBIA GENERATING STATION - NOTIFICATION OF NRC DESIGN

BASES INSPECTION (05000397/2016007) AND INITIAL REQUEST FOR

INFORMATION

Distribution:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Gregory.Kolcum@nrc.gov)

Resident Inspector (Dan.Bradley@nrc.gov)

Site Administrative Assistant (Vacant)

Branch Chief, DRP/A (Jeremy.Groom@nrc.gov)

Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)

Project Engineer (Thomas.Sullivan@nrc.gov)

Project Engineer (Matthew.Kirk@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Balwant.Singal@nrc.gov)

Team Leader, DRS/TSS (Thomas.Hipschman@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Raj.Iyengar@nrc.gov)