Letter Sequence Request |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance
Results
Other: ML100980062, ML101040675, ML101050307, ML101110054, ML101170056, ML101460059, ML103230048, ML103510668, ML110180524, ML111600187, ML11165A023, ML111750188, ML111821975, ML11252B053, ML11291A157, ML11307A393, ML11335A127, ML12044A329, ML12081A275, ML12082A209, ML12181A020
|
MONTHYEARML1009205462010-03-31031 March 2010 Comment (1) of John D. Greenhill on Behalf of Himself Regarding Re-Licensing of Columbia Generating Station Project stage: Request ML1009800622010-03-31031 March 2010 Comment (2) of Jerome Delvin Supporting Columbia Generating Stations License Renewal Project stage: Other ML1010406752010-04-0202 April 2010 Comment (3) of David V. Taylor, Et. Al., on Behalf of Washington State Legislature, Supporting Energy Northwests License Renewal for Columbia Generating Station to Extend Operating License Through 2043 Project stage: Other ML1012410372010-04-0606 April 2010 Transcript of Columbia Generating Station License Renewal Process and Environmental Scoping Public Meeting, Evening Session, 04/06/2010, Pages 1-30 Project stage: Meeting ML1010503072010-04-0606 April 2010 Comment (4) of James O. Luce, on Behalf of Washington State Energy Facility Site Evaluation Council, on Columbia Generating Station License Renewal Application Project stage: Other ML1019605472010-04-0606 April 2010 License Renewal, Written Comments of Gene Kinsey from Public Scoping Meeting Project stage: Meeting ML1012410022010-04-0606 April 2010 Transcript of Columbia Generating Station License Renewal Process and Environmental Scoping Public Meeting, Afternoon Session, April 06/2010, Pages 1-39 Project stage: Meeting ML1011100522010-04-0707 April 2010 Comment (5) of Brad Peck, Rick Miller, & Robert E. Koch Supporting Energy Northwests Columbia Generating Station License Renewal Application to the Nuclear Regulatory Commission Project stage: Request ML1011604352010-04-0909 April 2010 G20100244/LTR-10-0176/EDATS: SECY-2010-0219 - Ltr., Russell Jim, Storage of Spent Power Reactor Fuel at Columbia Generating Station Project stage: Request ML1011100532010-04-0909 April 2010 Comment (6) of Tim Sheldon Supporting Renewal of the Operating License for the Columbia Generating Station Project stage: Request ML1011100542010-04-12012 April 2010 Comment (7) of Larry Haler and Brad Klippert on Behalf of the Wa House of Representatives Supporting License Renewal of the Columbia Generating Station Operated by Energy Northwest Project stage: Other ML1011700562010-04-12012 April 2010 Comment (8) of Washington State Senate, Supporting License Renewal of Columbia Generating Station Operated by Energy Northwest Project stage: Other ML1011804592010-04-19019 April 2010 Comment (9) of Senator Phil Rockefeller, Washington State Adding His Voice to Those Strongly Supporting Relicensing of Columbia Generating Station as an Essential Asset in Washingtons Energy Resources Project stage: Request ML1032300482010-04-21021 April 2010 Comment (11) of Various Individuals on Behalf of Energy Northwest Re Environmental Review of Columbia Generating Stations License Renewal Project stage: Other ML1012503142010-05-10010 May 2010 Meeting Summary-CGS License Renewal Overview and Environmental Scoping Meetings Project stage: Meeting ML1012505192010-05-10010 May 2010 Summary of Public License Renewal Overview and Environmental Scoping Meetings Related to the Review of the Columbia Generating Station License Renewal Application Project stage: Meeting ML1014600592010-05-14014 May 2010 Comment (10) of Gary Robertson on Behalf of Washington State, Department of Health, on Environmental Review of Columbia Generating Stations License Renewal Project stage: Other ML1017604212010-07-0101 July 2010 Request for Additional Information for the Review of the Columbia Generating Station License Renewal Application - SAMA Review Project stage: RAI ML1017506552010-07-0202 July 2010 Request for Additional Information for the Review of the Columbia Generating Station License Renewal Application - Environmental Review Project stage: RAI ML1018100912010-07-0808 July 2010 Request for Additional Information Related to the Environmental Site Audit for Columbia Generating Station License Renewal Project stage: RAI ML1018802892010-07-15015 July 2010 June 28, 2010, Summary of Telephone Conference Call Held Between NRC and Energy Northwest Concerning Draft Requests for Additional Information Pertaining to the SAMA Review of the Columbia Generating Station License Renewal Application Project stage: Draft RAI GO2-10-105, Response to Request for Additional Information License Renewal Application2010-08-0505 August 2010 Response to Request for Additional Information License Renewal Application Project stage: Response to RAI ML1023802882010-08-0909 August 2010 Response to Request for Additional Information License Renewal Application, Enclosure B, Terrestrial Ecology Documents Project stage: Response to RAI GO2-10-108, Response to Request for Additional Information, License Renewal Application2010-08-0909 August 2010 Response to Request for Additional Information, License Renewal Application Project stage: Response to RAI ML1021003032010-08-10010 August 2010 Schedule Revision for the Environmental Review of the Columbia Generating Station License Renewal Application Project stage: Approval GO2-10-138, Response to Request for Additional Information on License Renewal Application2010-09-17017 September 2010 Response to Request for Additional Information on License Renewal Application Project stage: Response to RAI ML1026302282010-10-0101 October 2010 Summary of Tribal Outreach Informational Meeting Concerning Columbia Generating Station License Renewal and Hanford Low Level Waste Project stage: Meeting ML1028709842010-11-10010 November 2010 Request for Additional Information for the Review of the Columbia Generating Station License Renewal Application-Sama Review Project stage: RAI ML1035106682010-12-17017 December 2010 E-mail Dtd 12/17/2010, Subj: NRC Ba/Efh Assessment for Columbia Generating Station License Renewal Review Project stage: Other GO2-10-178, Response to Request for Additional Information License Renewal Application2010-12-21021 December 2010 Response to Request for Additional Information License Renewal Application Project stage: Response to RAI ML1027702322010-12-29029 December 2010 Issuance of Environmental Scoping Summary Report Associated with the Staffs Review of the Application by Energy Northwest for Renewal of the Operating License for Columbia Generating Station Project stage: Approval ML1034305262011-01-10010 January 2011 Schedule Revision for the Review of the Columbia Generating Station License Renewal Application Project stage: Approval ML1034001632011-01-18018 January 2011 Summary of Site Visit in Support of the Environmental Review of the License Renewal Application for Columbia Generating Station Project stage: Approval ML1101805242011-01-18018 January 2011 License Renewal, e-mail Dated 1/18/2011 Project stage: Other GO2-11-032, Response to Request for Additional Information for the Review of the License Renewal Application2011-01-28028 January 2011 Response to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI GO2-11-025, Response to Request for Additional Information on License Renewal Application2011-01-28028 January 2011 Response to Request for Additional Information on License Renewal Application Project stage: Response to RAI ML1104005102011-03-0101 March 2011 1/19/11 Summary of Telephone Conference Call Held Between USNRC and Energy Northwest Concerning Requests for Additional Information Pertaining to the SAMA Review of the Columbia Generating Station License Renewal Application Project stage: RAI ML1106703792011-03-10010 March 2011 Request for Additional Information for the Review of the Columbia Generating Station License Renewal Application - Severe Accident Mitigation Alternative Review Project stage: RAI GO2-11-082, Environmental Authorizations for CGS Operations2011-04-20020 April 2011 Environmental Authorizations for CGS Operations Project stage: Request GO2-11-092, Response to Request for Additional Information Related to the Review of the Severe Accident Mitigation Alternative Analysis2011-05-0606 May 2011 Response to Request for Additional Information Related to the Review of the Severe Accident Mitigation Alternative Analysis Project stage: Response to RAI ML11157A0362011-06-0505 June 2011 Letter from Heart of America Northwest Public Involvement Lists and Notices, Including Requests to Be Added to Lists and Requests for Hearings on the Draft EIS for Columbia Generating Station Project stage: Request ML1116001872011-06-0909 June 2011 E-mail Dtd 6/9/11, Subj: Energy Nw, Columbia Generating Station Public Involvement and Notice List, Request for Hearings Re EIS Project stage: Other ML11151A2222011-06-14014 June 2011 Schedule Revision for the Environmental Review of the Columbia Generating Station License Renewal Application Project stage: Approval ML1116802212011-06-16016 June 2011 Request for List of Protected Species within the Area Under Evaluation for the Columbia Generating Station License Renewal Application Review Project stage: Request ML1117501882011-06-23023 June 2011 Environmental Authorizations for Current CGS Operations Project stage: Other ML1118219752011-06-27027 June 2011 E-mail Dtd 6/27/2011, Subj: NRC Ba/Efh Assessment for Columbia Generating Station License Renewal Review Project stage: Other ML11165A0232011-08-23023 August 2011 Biological Assessment and Essential Fish Habitat Assessment for License Renewal of Columbia Generating Station Project stage: Other ML11214A2372011-08-30030 August 2011 RAI for the Review of the Columbia Generating Station LRA-Severe Accident Mitigation Alternative Review Project stage: RAI ML11227A0072011-08-31031 August 2011 NUREG-1437 Supp 47 Dfc Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Columbia Generating Station. Project stage: Acceptance Review ML11252B0532011-09-0101 September 2011 Comment (1) of Robert G. Whitlam, on Behalf of Washington Dept of Archaeology & Historic Preservation Columbia Generating Station License Renewal Project stage: Other 2010-08-10
[Table View] |
Text
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed: Apr 23, 2010 12:13 PAPER NUMBER:
ACTION OFFICE:
LTR-10-0 176 EDO LOGGING DATE:
04/20/2010 AUTHOR:
AFFILIATION:
ADDRESSEE:
SUBJECT:
ACTION:
DISTRIBUTION:
LETTER DATE:
ACKNOWLEDGED SPECIAL HANDLING:
Jim Russell YAKIMA Gregory Jaczko Urges the NRC to strengthen efforts to ensure the safe and secure storage of spent power reactor fuel at the Columbia Generating Station (CGS) located on the U.S. DOE's Hanford site Direct Reply RF, SECY to Ack 04/09/2010 No NOTES:
FILE LOCATION:
ADAMS DATE DUE:
05/17/2010 DATE SIGNED:
EDO -- G2010,0244
Confederated Tribes and Bands Established by the of the Yakama Nation Treaty of June 9, 1855 April 9, 2010 The Honorable Gregory B. Jaczko Chairman U.S. Nuclear Regulatory Commission Mail Stop 0-1 6G4 Washington D.C. 20555-0001
Dear Chairman Jaczko:
I am writing to urge the Nuclear Regulatory Commission to strengthen efforts to ensure the safe and secure storage of spent power reactor fuel at the Columbia Generating Station (CGS) located on the U.S. Department of Energy's Hanford site. In light of the decision by President Obama to cancel the Yucca Mountain nuclear waste repository, the timely disposal of spent power reactor fuel can no longer be assumed. Instead there is a growing likelihood that spent power reactor fuel will accumulate and remain at reactor sites for an indefinite period.
In particular, we urge the NRC to end its policy of allowing dense compaction of spent fuel in pools and require highly radioactive fuel assemblies greater than five years old be placed into dry, hardened storage modes capable of withstanding aerial impacts, earthquakes and acts of malice.
The Hanford site is located on land to which the Yakama Nation has perpetual rights under the Treaty of June 9, 1855. The Federal government maintains a special trust relationship with Indian tribes pursuant to treaties, statutes, Executive Orders, judicial decisions and other legal instruments. Inherent in this relationship is an enforceable fiduciary responsibility to the Yakama Nation to protect its lands and resources. Moreover, the Yakama Reservation is within the 50-mile Ingestion Pathway Zone if a major radiological release were to occur at the Columbia Generating Station.
As you may know, the CGS is a Boiling Water Reactor Mark II that began operation in 1984. It is in the early process of extending its operating license, which expires in December 2023. This reactor has generated approximately 500 metric tons of spent fuel. Over the next several decades the radioactive inventory in spent fuel at the Columbia Generating Station is estimated to more than quadruple. The major preponderance of spent fuel at the CGS is densely compacted in an above ground pool, well above grade. On average, spent fuel ponds hold five to 10 times more long-lived radioactivity than a reactor core. Particularly worrisome is the large amount of cesium 137 in fuel ponds, which contain anywhere from 20 to 50 million curies of this dangerous isotope.
For the past several years, the NRC has sponsored research which indicated that consequences from drainage of spent fuel pools from accidents and earthquakes could be considerable. For instance, a 1997 report for the NRC by Brookhaven National Laboratory found that a severe pool fire could render about 188 square miles uninhabitable, cause as many as 28,000 cancer Post Office Box 151, Fort Road, Toppenish, WA 98948 (509) 865-5121
The Honorable Gregory B. Jaczko April 9, 2010 Page 2 fatalities, and cost $59 billion in damage. But, the frequency of these events was considered to be quite small.
In 2002, Attorneys General from states hosting most of the nation's nuclear power plants called upon the U.S. Congress to pass legislation to "enhance protections for one of the most vulnerable components of a nuclear power plant -its spent fuel pools."
In 2003 an independent study reported that drainage of a spent fuel pool by a terrorist attack could result in as much as 27,000 square miles of severe land contamination. This was the first study to consider potential risks of terrorist attacks on spent fuel pools.
In response, the U.S. Congress requested the National Academy of Sciences to convene a special panel to address this concern. In 2005 the Academy panel warned that,"...under some conditions, a terrorist attack that partially or completely drained a spent fuel pool could lead to a propagating zirconium cladding fire and the release of large quantities of radioactive materials to the environment." The panel also noted that, "pools are potentially susceptible to attacks from above or from the sides depending on their elevation with respect to grade and the presence of surrounding shielding structures." Because of the sensitivity of the subject, the panel submitted classified findings and recommendations to the NRC.
The Academy panel also visited German nuclear sites, where spent fuel pools are under heavy containment or stored in dry casks, which are placed in earthen berms or thick-wall structures.
The German nuclear industry took these steps 25 years ago in response to fighter jet crashes and concerns over acts of terror.
We note that the NRC is working on a new "waste confidence" policy. We urge that this new policy not be contingent on the timely opening of a high-level waste repository, but rather on the safety and security of spent fuel storage, which may unfortunately, extend into the indefinite future. Specifically, we urge that license extensions being sought, including that for the Columbia Generating Station be contingent on emplacement of spent fuel greater than five years of age, in dry, hardened storage. Future reactors should be required to have spent fuel pools under heavy containment.
I look forward to your response.
Sincerely, Russell Jim. Manager Environmental Restoration and Waste Management Program cc.