MONTHYEARML24296B1852024-10-16016 October 2024 NRR E-mail Capture - Final - Request for Additional Information - Columbia - Relief Request for Fourth Ten-Year Interval Inservice Testing - EPID: L-2024-LLR-0039 ML24291A1072024-10-16016 October 2024 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia Generating Station - Application to Revise TS to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements - EPID L-2024-LLA-0132 ML24215A3672024-08-0101 August 2024 NRR E-mail Capture - Final Request for Additional Information - Columbia Generating Station - License Amendment Request to Revise Emergency Plan - EPID L-2024-LLA-0011 ML24183A2392024-07-0101 July 2024 NRR E-mail Capture - LIC-109 Acceptance - Columbia Generating Station - Relief Request for the Fourth Ten-Year Interval Inservice Testing - EPID L-2024-LLR-0039 ML24169A0402024-06-14014 June 2024 NRR E-mail Capture - Final Request for Additional Information - Columbia Generating Station (Columbia) - Relief Requests for the Fifth Ten-Year Interval Inservice Testing - EPIDs (L-2024-LLR-007 Through 0013) ML24103A2022024-04-0909 April 2024 EN 57068 - Transco Products Inc Part 21 Initial Notification of Unverified Critical Characteristics of Darmatt KM-1 Flat Board ML24060A1022024-02-28028 February 2024 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2023 Biological Monitoring Report ML24053A0092024-02-21021 February 2024 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of Relief Requests for the Fifth Ten-Year Interval Inservice Testing - EPIDs L-2024-LLR-0007 Through 00013 ML24008A0022024-01-0505 January 2024 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of License Amendment Request for Application to Revise TS to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation - EPID L-2023-LLA-0170 ML23278A0042023-10-0404 October 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia - Application to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling - EPID L-2023-LLA-0128 ML23275A0092023-09-29029 September 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia - Application to Revise Tech Specs to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling - EPID: L-2023-LLA-0128 ML23150A2502023-05-26026 May 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia Generating Station - License Amendment Request to Clean-Up Operating License and Appendix a, Technical Specifications - EPID L-2023-LLA-0062 ML23124A2412023-05-0404 May 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia - Application to Revise TS to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position - EPID L-2023-LLA-0063 ML23124A0062023-05-0303 May 2023 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia Generating Station - Application to Revise Tech Specs to Adopt TSTF-541, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling - EPID L-2023-LLA-0063 ML23065A0422023-02-23023 February 2023 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2022 Biological Monitoring Report ML22343A1802022-12-0808 December 2022 February 2023 Emergency Preparedness Program Inspection - Request for Information ML22349A2002022-12-0101 December 2022 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2022 Priority Pollutant Discharge Monitoring Report ML22312A0042022-11-0707 November 2022 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of Fourth 10 Year ISI RR 4ISI-11 - EPID L-2022-LLR-0071 ML22301A1432022-10-28028 October 2022 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Adopt TSTF-505 - EPID L-2022-LLA-0023 ML22256A2002022-09-13013 September 2022 NRR E-mail Capture - Draft - Additional Audit Question - Columbia Generating Station - Regulatory Audit Question for LAR to Revise TS to Adopt TSTF-505, Revision 2 ML22241A0182022-08-26026 August 2022 NRR E-mail Capture - Draft - Additional Audit Question - Columbia Generating Station - Regulatory Audit Question for LAR to Revise TS to Adopt TSTF-505, Revision 2 ML22235A1052022-08-22022 August 2022 August 2022 Emergency Preparedness Exercise Inspection Request for Information ML22210A0072022-07-28028 July 2022 NRR E-mail Capture - Draft - Additional Audit Question - Columbia Generating Station - Regulatory Audit Question for LAR to Revise TS to Adopt TSTF-505, Revision 2 ML22173A0682022-06-17017 June 2022 Email Concurrence on SE Input for Columbia Pltr LAR ML22166A4122022-06-15015 June 2022 NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia Generating Station - Application to Revise TS to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling - EPID L-2022-LLA-0081 ML22144A0342022-05-18018 May 2022 NRR E-mail Capture - Draft - Request for Additional Information - Columbia Generating Station - LAR to Change TS 3.4.11 - Reactor Coolant System Pressure and Temperature Limits - EPID L-2021-LLA-0191 ML22075A3392022-03-15015 March 2022 NRR E-mail Capture - Columbia Generating Station - Audit Questions - Regulatory Audit of License Amendment Request to Adopt 50.69 - Categorization Process - EPID L-2021-LLA-0207 ML22067A0132022-03-0707 March 2022 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of License Amendment Request to Adopt TSTF-505, Revision 2, Provide RISK-INFORMED Extended Completion Times - RITSTF Initiative 4b - EPID L-2022-LLA-0023 A002515, NRR E-mail Capture - (External Sender) Energy Northwest Columbia Generating Station 2021 Priority Pollutant Discharge Monitoring Report2022-01-12012 January 2022 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2021 Priority Pollutant Discharge Monitoring Report ML21348A1852021-12-14014 December 2021 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia - License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors - EPID L-2021-LLA-0207 ML21335A0182021-11-30030 November 2021 NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of Requested Licensing Action - License Amendment Request to Change TS 3.4.11 Reactor Coolant System Pressure and Temperature Limits - EPID L-2021-LLA-0191 ML21216A0502021-08-0303 August 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia - License Amendment Request to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO EPID L-2021-LLA-0259 ML21209A9792021-07-28028 July 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) - EPID L-2021-LLA-0074 ML21162A3062021-06-11011 June 2021 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia Generating Station - License Amendment Request to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement - EPID L-2021-LLA-0084 ML21137A0012021-05-14014 May 2021 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia Generating Station - License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) - EPID L-2021-LLA-0074 ML21120A1182021-04-30030 April 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - On-Site Cooling System Sediment Disposal Approval Request - EPID L-2020-LLL-0031 ML21109A2762021-04-0808 April 2021 Email Request for Information for Columbia Generating Stations PIR Inspection_Redacted ML21068A2842021-03-0404 March 2021 2021002 Inservice Inspection (ISI) Request for Information (RFI) ML21036A2932021-02-0404 February 2021 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2020 Biological Monitoring Report ML20357B1502020-12-22022 December 2020 NRR E-mail Capture - LIC-109 Acceptance Review - Columbia - License Amendment Request - Adoption of TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO, Rev. 2 - EPID L-2020-LLA-0259 ML20336A1852020-11-30030 November 2020 NRR E-mail Capture - Final - RAI - Columbia - One -Time Exemption from 10 CFR 73, App B, Sect VI, Subsection C.3.(l)(1) Regarding Annual Force-On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 ML20325A0402020-11-19019 November 2020 NRR E-mail Capture - Draft - RAI - Columbia - One -Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force -On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 ML20314A0452020-11-0606 November 2020 NMFS to Energy Northwest, Entrainment Study Results for Columbia Generating Station ML20297A3032020-10-22022 October 2020 NRR E-mail Capture - LIC-109 Acceptance Review of License Amendment Request for Columbia - Application to Revise Tech Specs to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements - EPID L-2020-LLA-0212 ML20267A5162020-09-23023 September 2020 NRR E-mail Capture - Columbia Generating Station - Final - Request for Additional Information - Fourth Ten-Year Interval Inservice Inspection (ISI) Program Relief Request 4ISI-09 - EPID L-2020-LLR-0068 ML20265A3242020-09-20020 September 2020 Email 9-20-2020 - Req_ Kick-Off Call Columbia Generating Station RFI Provided for Roll-Back EP Program Inspection (Week of Nov 2 2020) ML20245E2822020-08-31031 August 2020 NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time ML20239A9702020-08-26026 August 2020 NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time ML20149K4362020-05-26026 May 2020 NRR E-mail Capture - Formal RAIs for Columbia (COVID-19) QA Plan Change Surveillance, Request Response by Tuesday June 2, 2020 ML20136A0112020-05-14014 May 2020 NRR E-mail Capture - Acceptance Columbia Relief Request ISI Reactor Pressure Vessel Feedwater Nozzles, 4ISI-09 2024-08-01
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24296B1852024-10-16016 October 2024 NRR E-mail Capture - Final - Request for Additional Information - Columbia - Relief Request for Fourth Ten-Year Interval Inservice Testing - EPID: L-2024-LLR-0039 ML24215A3672024-08-0101 August 2024 NRR E-mail Capture - Final Request for Additional Information - Columbia Generating Station - License Amendment Request to Revise Emergency Plan - EPID L-2024-LLA-0011 ML24169A0402024-06-14014 June 2024 NRR E-mail Capture - Final Request for Additional Information - Columbia Generating Station (Columbia) - Relief Requests for the Fifth Ten-Year Interval Inservice Testing - EPIDs (L-2024-LLR-007 Through 0013) ML24058A0692024-03-14014 March 2024 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Emergency Plan ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information ML23110A2642023-04-20020 April 2023 Request for Information License Renewal Phase 2 Inspection ML22343A1802022-12-0808 December 2022 February 2023 Emergency Preparedness Program Inspection - Request for Information ML22301A1432022-10-28028 October 2022 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Adopt TSTF-505 - EPID L-2022-LLA-0023 ML22242A1082022-08-30030 August 2022 Information Request, Information Request, Security IR 2022404 ML22235A1052022-08-22022 August 2022 August 2022 Emergency Preparedness Exercise Inspection Request for Information IR 05000397/20224012022-06-0606 June 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000397/2022401 ML22144A0342022-05-18018 May 2022 NRR E-mail Capture - Draft - Request for Additional Information - Columbia Generating Station - LAR to Change TS 3.4.11 - Reactor Coolant System Pressure and Temperature Limits - EPID L-2021-LLA-0191 ML22041A4572022-02-10010 February 2022 Notification of NRC Design Bases Assurance Inspection (Team) (05000397/2022010) and Request for Information ML21277A3572021-10-12012 October 2021 CGS Brq RFI Letter, Columbia Generating Station - Notification of Inspection (NRC Inspection Report 05000397/2021004) and Request for Information ML21216A0502021-08-0303 August 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia - License Amendment Request to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO EPID L-2021-LLA-0259 ML21209A9792021-07-28028 July 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) - EPID L-2021-LLA-0074 ML21120A1182021-04-30030 April 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - On-Site Cooling System Sediment Disposal Approval Request - EPID L-2020-LLL-0031 ML21068A2842021-03-0404 March 2021 2021002 Inservice Inspection (ISI) Request for Information (RFI) ML20336A1852020-11-30030 November 2020 NRR E-mail Capture - Final - RAI - Columbia - One -Time Exemption from 10 CFR 73, App B, Sect VI, Subsection C.3.(l)(1) Regarding Annual Force-On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 ML20325A0402020-11-19019 November 2020 NRR E-mail Capture - Draft - RAI - Columbia - One -Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force -On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 ML20267A5162020-09-23023 September 2020 NRR E-mail Capture - Columbia Generating Station - Final - Request for Additional Information - Fourth Ten-Year Interval Inservice Inspection (ISI) Program Relief Request 4ISI-09 - EPID L-2020-LLR-0068 ML20245E2822020-08-31031 August 2020 NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time ML20239A9702020-08-26026 August 2020 NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time ML20149K4362020-05-26026 May 2020 NRR E-mail Capture - Formal RAIs for Columbia (COVID-19) QA Plan Change Surveillance, Request Response by Tuesday June 2, 2020 ML20112F4572020-04-21021 April 2020 NRR E-mail Capture - Official Release of NRC RAIs for Columbia Covid Exigent Due Friday April 24, 2020 ML20034E6082020-02-0303 February 2020 NRR E-mail Capture - RAI Formal Release Columbia TSTF 563 LAR, 30 Day Response Period Due March 3, 2020 ML20028E1512020-01-27027 January 2020 Notification of Evaluations of Changes, Tests, and Experiments Inspection (Inspection Report 05000397/2020002) and Request for Information IR 05000397/20200102020-01-14014 January 2020 Information Request to Support Upcoming Temporary Instruction 2515/193 Inspection at Columbia Generating Station (Inspection Report 05000397/2020010) ML19267A1842019-09-24024 September 2019 Request for Information for Upcoming Open Phase Condition Inspection at Columbia Generating Station ML19232A2282019-08-20020 August 2019 NRR E-mail Capture - Formal Release of RAIs Ref: Columbia Exigent Amendment - One Electrical RAI, ML19183A4752019-07-0202 July 2019 NRR E-mail Capture - Formal Release of RAIs Ref: Columbia HVAC LAR L-2019-LLA-0034 ML18088A0152018-03-29029 March 2018 Notification of NRC Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/ Staffing/Multi-Unit Dose Assessment Plans (05000397/2018010) and Request for ML17341B0272017-12-0707 December 2017 NRR E-mail Capture - RAI Associated with Columbia Amendment Request Revise Tech Spec 5.5.12 for Permanent Extension of Type a and Type C Containment Testing Frequencies for MF9469, EPID: L-2017-LLA-0197, ILRT, LLRT LAR - New RAI Response Da ML17292A0572017-10-18018 October 2017 NRR E-mail Capture - New RWCU RAI Due Date Now November 24, 2017 ML17249A6882017-09-0606 September 2017 NRR E-mail Capture - RAIs for Columbia Relief Request RAI (MF8925), 3ISI-19 ML17205A3152017-07-20020 July 2017 Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000397/2017004) and Request for Information ML17193A2192017-07-12012 July 2017 NRR E-mail Capture - Columbia RWCU LAR MF8318, Formal Release of RAIs ML17144A1702017-05-24024 May 2017 NRR E-mail Capture - NRC RAIs for Columbia Relief Request MF8922, 3ISI-16 ML17047A7492017-02-16016 February 2017 Response to Request for Additional Information, Columbia Mur LAR Evib Rais ML17006A0902017-01-0404 January 2017 NRR E-mail Capture - Non Proprietary Request for Additional Information Regarding Columbia Mur Power Uprate ML17006A0922017-01-0404 January 2017 NRR E-mail Capture - Eicb RAIs for Columbia Mur ML16356A1382016-12-21021 December 2016 NRR E-mail Capture - Columbia Mur LAR Evib RAIs Non - Proprietary Version - Revise Operating License and Technical Specifications for Measurement Uncertainty Recapture Power Uprate ML16342C4322016-12-0707 December 2016 NRR E-mail Capture - Columbia Measurement Uncertainty Recapture Power Uprate LAR Rais: Human Performance: MF8060, Formal Release for Response on Monday January 9, 2017 ML16327A1842016-11-22022 November 2016 NRR E-mail Capture - Non Proprietary Request for Additional Information Regarding Columbia Mur Power Uprate ML16323A1192016-11-16016 November 2016 NRR E-mail Capture - Eicb RAIs for Columbia Mur ML16218A3902016-08-0808 August 2016 Supplemental Information Needed for Acceptance of Requested Licensing Action, Request for Measurement Uncertainty Recapture (Mur) Power Uprate (from 3486 Mwt to 3544 Mwt) ML16194A3702016-07-11011 July 2016 Notification of NRC Triennial Heat Sink Performance Inspection 05000397/2016003 and Request for Information ML16069A3592016-03-0909 March 2016 NRR E-mail Capture - Second Round Rais: Columbia MF6042 LAR TSTF-425 ML16061A5542016-03-0101 March 2016 Notification of NRC Design Bases Inspection (05000397/2016007) and Initial Request for Information ML16061A5662016-03-0101 March 2016 Notification of Design Bases Inspection (Programs)(Inspection Report 05000397/2016008) and Initial Request for Information 2024-08-01
[Table view] |
Text
NRR-PMDAPEm Resource From: Klos, John Sent: Wednesday, March 09, 2016 3:17 PM To: Williams, Lisa L.
Cc: Klos, John; ONeal, Daniel
Subject:
Second round RAIs: Columbia MF6042 LAR TSTF-425 Ms. Williams, By letter dated March 17, 2015, (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML15093A178 as supplemented by letters dated September 17, 2015, ADAMS Accession No. ML15260A570, October 29, 2015, ADAMS Accession No. ML15302A492, November 17, 2015, ADAMS Accession No. ML15321A426, and December 28, 2015, ADAMS Accession No. ML15363A239. Energy Northwest (the licensee) submitted a license amendment request (LAR) to adopt Technical Specification Task Force (TSTF) - 425, revision 3 to relocated specific technical specification surveillance frequencies to a licensee controlled program.
The Nuclear Regulatory Commission (NRC) staff has been reviewing the submittals and has determined that requests for additional information (RAIs) are needed to complete its technical review and make a regulatory finding regarding this LAR. The draft questions were sent via electronic transmission on March 4, 2016 to Ms.
Lisa Williams and no clarification teleconference was necessary. Additionally, it was agreed that a response would be submitted within 30 calendar days from the date of this email, April 9, 2016.
If you have any questions, please contact John Klos per the contact information below.
The RAIs are as follows:
SECOND REQUEST FOR ADDITIONAL INFORMATION RELATED TO AN AMENDMENT TO ADOPT TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER (TSTF)-425, REVISION 3 TO RELOCATE SPECIFIC SURVEILLANCE FREQUENCIES TO A LICENSEE CONTROLLED PROGRAM COLUMBIA GENERATING STATION DOCKET NO. 50-397
Background
By letter dated March 17, 2015, (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML15093A178 as supplemented by letters dated September 17, 2015, ADAMS Accession No. ML15260A570, October 29, 2015, ADAMS Accession No. ML15302A492, November 17, 2015, ADAMS Accession No. ML15321A426, and December 28, 2015, ADAMS Accession No. ML15363A239. Energy Northwest (the licensee) submitted a license amendment request (LAR) to adopt Technical Specification Task Force (TSTF) - 425, revision 3 to relocated specific technical specification surveillance frequencies to a licensee controlled program. The U.S. Nuclear Regulatory Commission (NRC) staff issued requests for additional information (RAIs) for the Probability Risk Assessment (PRA) Licensing branch by e-mail dated August 12, 2015 ADAMS Accession No. ML15224B646. The licensee provided responses to these RAIs by letters dated September 17, 2015 and October 29, 2015.
1
Regulatory Basis:
The primary regulatory basis for evaluation of this LAR are 10 CFR 50.36 and 50.36(c)(3)
In 10 CFR 50.36, the NRC established its regulatory requirements related to the content of Technical Specifications (TS). Pursuant to 10 CFR 50.36, TS are required to include items in the following five specific categories related to station operation: (1) Safety limits, limiting safety system settings, and limiting control settings; (2) limiting conditions for operation; (3) surveillance requirements; (4) design features; and (5) administrative controls.
10 CFR 50.36(c)(3) further states that Surveillance requirements are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met.
RAIs Based on the review of the RAI responses, the NRC staff has the following follow-up RAIs:
PRA RAI 1.1 (Follow up to PRA RAI 1)
In response to PRA RAI 1 the licensee provided, by letter dated September 17, 2015, the internal events PRA 2009 peer review facts and observations (F&Os), self-assessment findings, and their dispositions. Please address the following regarding F&O 1-3.
- a. The peer review F&O 1-3 states In almost all of the post-initiator Human Error Probabilities (HEPs) where optimal stress is assumed, time is a factor with core damage occurring between 30 minutes and an hours.
Clarify if these post-initiator HEPs were assumed to be optimal stress in all cases involving this time frame or if such HEPs were determined on a case-by-case basis to represent optimal stress or high stress as appropriate. Please describe your process to make this determination.
- b. The peer review F&O 1-3 also stated, A second set of justification was provided, with discussion that basically justified moderate or low stress would be appropriate, given enough training for the operators.
The peer review F&O 1-3 recommendation stated: Apply high stress factors per Table 17-1 of NUREG/CR-1278 [Handbook of Human Reliability Analysis with Emphasis on Nuclear Power Plant Applications] to HEPs where time pressure is present during an accident situation.
Please clarify if high stress factors were used on a case-by-case basis from this table, and, if not provide justification. Please discuss whether time pressure was used to determine whether an execution operator action justified the application of a high stress factor.
PRA RAI 4.1 (Follow up to PRA RAI 4)
The NRC staff reviewed the response to PRA RAI 4 and found the response did not address the issue.
The peer review observation in the LAR, dated March 17, 2015, concerning F&O 2-2, 2009 Supporting Requirements (SR) DA-C6, page 9 of 11, Attachment 2 states:
Estimates based on the surveillance tests and maintenance acts as described in DA-C6 and DA-C7 should be performed for significant components whose data are not tracked in the MSPI [Mitigating Systems Performance Index] data.
The peer review recommendations in the LAR, dated March 17, 2015, concerning F&O 2-2, 2009 SR DA-C6, page 9 of 11, Attachment 2 states:
Update the estimates for significant events based on surveillance test and maintenance records.
The licensees response, dated September 17, 2015, to PRA RAI 4 states:
2
A sensitivity study was performed by replacing the base data for these failure modes with generic data from NUREG/CR-6928 [Industry-Average Performance for Components and Initiating Events at U.S. Commercial Nuclear Power Plants]. It was determined that the finding is unlikely to change the conclusions of risk-informed decisions.
SRs DA-C6 and DA-C7 are not limited to the Mitigating Systems Performance Index (MSPI) systems. SR DA-C6 and SR DA-C7 include consideration of plant-specific data, and it is not clear how generic data has been demonstrated to be bounding for the non-MSPI components. That is, if the peer review recommendation were to be performed it is not clear that the generic data would necessarily be bounding.
Please provide justification why the use of generic data for performing sensitivity analyses is bounding without updating applicable component estimates with plant-specific data consistent with SR DA-C6 and SR DA-C7, or compete the work to meet SR DA-C6 and SR DA-C7 for applicable components and provide the disposition of the F&O.
John Klos DORL Callaway, Columbia Project Manager U.S. NRC, Office of Nuclear Reactor Regulation, Division of Operating Reactor Licensing NRC/NRR/DORL/LPL4-1, MS O8H4 Washington, DC 20555-0001 301.415.5136, 301.415.3313 (fax)
John.Klos@NRC.gov 3
Hearing Identifier: NRR_PMDA Email Number: 2699 Mail Envelope Properties (67b271a8231e4829b422620c5e48fffb)
Subject:
Second round RAIs: Columbia MF6042 LAR TSTF-425 Sent Date: 3/9/2016 3:16:43 PM Received Date: 3/9/2016 3:16:49 PM From: Klos, John Created By: John.Klos@nrc.gov Recipients:
"Klos, John" <John.Klos@nrc.gov>
Tracking Status: None "ONeal, Daniel" <Daniel.ONeal@nrc.gov>
Tracking Status: None "Williams, Lisa L." <llwilliams@energy-northwest.com>
Tracking Status: None Post Office: HQPWMSMRS05.nrc.gov Files Size Date & Time MESSAGE 7301 3/9/2016 3:16:49 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
NRR-PMDAPEm Resource From: Klos, John Sent: Wednesday, March 09, 2016 3:17 PM To: Williams, Lisa L.
Cc: Klos, John; ONeal, Daniel
Subject:
Second round RAIs: Columbia MF6042 LAR TSTF-425 Ms. Williams, By letter dated March 17, 2015, (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML15093A178 as supplemented by letters dated September 17, 2015, ADAMS Accession No. ML15260A570, October 29, 2015, ADAMS Accession No. ML15302A492, November 17, 2015, ADAMS Accession No. ML15321A426, and December 28, 2015, ADAMS Accession No. ML15363A239. Energy Northwest (the licensee) submitted a license amendment request (LAR) to adopt Technical Specification Task Force (TSTF) - 425, revision 3 to relocated specific technical specification surveillance frequencies to a licensee controlled program.
The Nuclear Regulatory Commission (NRC) staff has been reviewing the submittals and has determined that requests for additional information (RAIs) are needed to complete its technical review and make a regulatory finding regarding this LAR. The draft questions were sent via electronic transmission on March 4, 2016 to Ms.
Lisa Williams and no clarification teleconference was necessary. Additionally, it was agreed that a response would be submitted within 30 calendar days from the date of this email, April 9, 2016.
If you have any questions, please contact John Klos per the contact information below.
The RAIs are as follows:
SECOND REQUEST FOR ADDITIONAL INFORMATION RELATED TO AN AMENDMENT TO ADOPT TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER (TSTF)-425, REVISION 3 TO RELOCATE SPECIFIC SURVEILLANCE FREQUENCIES TO A LICENSEE CONTROLLED PROGRAM COLUMBIA GENERATING STATION DOCKET NO. 50-397
Background
By letter dated March 17, 2015, (Agencywide Documents Access and Management System (ADAMS)
Accession No. ML15093A178 as supplemented by letters dated September 17, 2015, ADAMS Accession No. ML15260A570, October 29, 2015, ADAMS Accession No. ML15302A492, November 17, 2015, ADAMS Accession No. ML15321A426, and December 28, 2015, ADAMS Accession No. ML15363A239. Energy Northwest (the licensee) submitted a license amendment request (LAR) to adopt Technical Specification Task Force (TSTF) - 425, revision 3 to relocated specific technical specification surveillance frequencies to a licensee controlled program. The U.S. Nuclear Regulatory Commission (NRC) staff issued requests for additional information (RAIs) for the Probability Risk Assessment (PRA) Licensing branch by e-mail dated August 12, 2015 ADAMS Accession No. ML15224B646. The licensee provided responses to these RAIs by letters dated September 17, 2015 and October 29, 2015.
1
Regulatory Basis:
The primary regulatory basis for evaluation of this LAR are 10 CFR 50.36 and 50.36(c)(3)
In 10 CFR 50.36, the NRC established its regulatory requirements related to the content of Technical Specifications (TS). Pursuant to 10 CFR 50.36, TS are required to include items in the following five specific categories related to station operation: (1) Safety limits, limiting safety system settings, and limiting control settings; (2) limiting conditions for operation; (3) surveillance requirements; (4) design features; and (5) administrative controls.
10 CFR 50.36(c)(3) further states that Surveillance requirements are requirements relating to test, calibration, or inspection to assure that the necessary quality of systems and components is maintained, that facility operation will be within safety limits, and that the limiting conditions for operation will be met.
RAIs Based on the review of the RAI responses, the NRC staff has the following follow-up RAIs:
PRA RAI 1.1 (Follow up to PRA RAI 1)
In response to PRA RAI 1 the licensee provided, by letter dated September 17, 2015, the internal events PRA 2009 peer review facts and observations (F&Os), self-assessment findings, and their dispositions. Please address the following regarding F&O 1-3.
- a. The peer review F&O 1-3 states In almost all of the post-initiator Human Error Probabilities (HEPs) where optimal stress is assumed, time is a factor with core damage occurring between 30 minutes and an hours.
Clarify if these post-initiator HEPs were assumed to be optimal stress in all cases involving this time frame or if such HEPs were determined on a case-by-case basis to represent optimal stress or high stress as appropriate. Please describe your process to make this determination.
- b. The peer review F&O 1-3 also stated, A second set of justification was provided, with discussion that basically justified moderate or low stress would be appropriate, given enough training for the operators.
The peer review F&O 1-3 recommendation stated: Apply high stress factors per Table 17-1 of NUREG/CR-1278 [Handbook of Human Reliability Analysis with Emphasis on Nuclear Power Plant Applications] to HEPs where time pressure is present during an accident situation.
Please clarify if high stress factors were used on a case-by-case basis from this table, and, if not provide justification. Please discuss whether time pressure was used to determine whether an execution operator action justified the application of a high stress factor.
PRA RAI 4.1 (Follow up to PRA RAI 4)
The NRC staff reviewed the response to PRA RAI 4 and found the response did not address the issue.
The peer review observation in the LAR, dated March 17, 2015, concerning F&O 2-2, 2009 Supporting Requirements (SR) DA-C6, page 9 of 11, Attachment 2 states:
Estimates based on the surveillance tests and maintenance acts as described in DA-C6 and DA-C7 should be performed for significant components whose data are not tracked in the MSPI [Mitigating Systems Performance Index] data.
The peer review recommendations in the LAR, dated March 17, 2015, concerning F&O 2-2, 2009 SR DA-C6, page 9 of 11, Attachment 2 states:
Update the estimates for significant events based on surveillance test and maintenance records.
The licensees response, dated September 17, 2015, to PRA RAI 4 states:
2
A sensitivity study was performed by replacing the base data for these failure modes with generic data from NUREG/CR-6928 [Industry-Average Performance for Components and Initiating Events at U.S. Commercial Nuclear Power Plants]. It was determined that the finding is unlikely to change the conclusions of risk-informed decisions.
SRs DA-C6 and DA-C7 are not limited to the Mitigating Systems Performance Index (MSPI) systems. SR DA-C6 and SR DA-C7 include consideration of plant-specific data, and it is not clear how generic data has been demonstrated to be bounding for the non-MSPI components. That is, if the peer review recommendation were to be performed it is not clear that the generic data would necessarily be bounding.
Please provide justification why the use of generic data for performing sensitivity analyses is bounding without updating applicable component estimates with plant-specific data consistent with SR DA-C6 and SR DA-C7, or compete the work to meet SR DA-C6 and SR DA-C7 for applicable components and provide the disposition of the F&O.
John Klos DORL Callaway, Columbia Project Manager U.S. NRC, Office of Nuclear Reactor Regulation, Division of Operating Reactor Licensing NRC/NRR/DORL/LPL4-1, MS O8H4 Washington, DC 20555-0001 301.415.5136, 301.415.3313 (fax)
John.Klos@NRC.gov 3
Hearing Identifier: NRR_PMDA Email Number: 2699 Mail Envelope Properties (67b271a8231e4829b422620c5e48fffb)
Subject:
Second round RAIs: Columbia MF6042 LAR TSTF-425 Sent Date: 3/9/2016 3:16:43 PM Received Date: 3/9/2016 3:16:49 PM From: Klos, John Created By: John.Klos@nrc.gov Recipients:
"Klos, John" <John.Klos@nrc.gov>
Tracking Status: None "ONeal, Daniel" <Daniel.ONeal@nrc.gov>