MONTHYEARML1009205462010-03-31031 March 2010 Comment (1) of John D. Greenhill on Behalf of Himself Regarding Re-Licensing of Columbia Generating Station Project stage: Request ML1009800622010-03-31031 March 2010 Comment (2) of Jerome Delvin Supporting Columbia Generating Stations License Renewal Project stage: Other ML1010406752010-04-0202 April 2010 Comment (3) of David V. Taylor, Et. Al., on Behalf of Washington State Legislature, Supporting Energy Northwests License Renewal for Columbia Generating Station to Extend Operating License Through 2043 Project stage: Other ML1012410372010-04-0606 April 2010 Transcript of Columbia Generating Station License Renewal Process and Environmental Scoping Public Meeting, Evening Session, 04/06/2010, Pages 1-30 Project stage: Meeting ML1010503072010-04-0606 April 2010 Comment (4) of James O. Luce, on Behalf of Washington State Energy Facility Site Evaluation Council, on Columbia Generating Station License Renewal Application Project stage: Other ML1019605472010-04-0606 April 2010 License Renewal, Written Comments of Gene Kinsey from Public Scoping Meeting Project stage: Meeting ML1012410022010-04-0606 April 2010 Transcript of Columbia Generating Station License Renewal Process and Environmental Scoping Public Meeting, Afternoon Session, April 06/2010, Pages 1-39 Project stage: Meeting ML1011100522010-04-0707 April 2010 Comment (5) of Brad Peck, Rick Miller, & Robert E. Koch Supporting Energy Northwests Columbia Generating Station License Renewal Application to the Nuclear Regulatory Commission Project stage: Request ML1011604352010-04-0909 April 2010 G20100244/LTR-10-0176/EDATS: SECY-2010-0219 - Ltr., Russell Jim, Storage of Spent Power Reactor Fuel at Columbia Generating Station Project stage: Request ML1011100532010-04-0909 April 2010 Comment (6) of Tim Sheldon Supporting Renewal of the Operating License for the Columbia Generating Station Project stage: Request ML1011100542010-04-12012 April 2010 Comment (7) of Larry Haler and Brad Klippert on Behalf of the Wa House of Representatives Supporting License Renewal of the Columbia Generating Station Operated by Energy Northwest Project stage: Other ML1011700562010-04-12012 April 2010 Comment (8) of Washington State Senate, Supporting License Renewal of Columbia Generating Station Operated by Energy Northwest Project stage: Other ML1011804592010-04-19019 April 2010 Comment (9) of Senator Phil Rockefeller, Washington State Adding His Voice to Those Strongly Supporting Relicensing of Columbia Generating Station as an Essential Asset in Washingtons Energy Resources Project stage: Request ML1032300482010-04-21021 April 2010 Comment (11) of Various Individuals on Behalf of Energy Northwest Re Environmental Review of Columbia Generating Stations License Renewal Project stage: Other ML1012503142010-05-10010 May 2010 Meeting Summary-CGS License Renewal Overview and Environmental Scoping Meetings Project stage: Meeting ML1012505192010-05-10010 May 2010 Summary of Public License Renewal Overview and Environmental Scoping Meetings Related to the Review of the Columbia Generating Station License Renewal Application Project stage: Meeting ML1014600592010-05-14014 May 2010 Comment (10) of Gary Robertson on Behalf of Washington State, Department of Health, on Environmental Review of Columbia Generating Stations License Renewal Project stage: Other ML1017604212010-07-0101 July 2010 Request for Additional Information for the Review of the Columbia Generating Station License Renewal Application - SAMA Review Project stage: RAI ML1017506552010-07-0202 July 2010 Request for Additional Information for the Review of the Columbia Generating Station License Renewal Application - Environmental Review Project stage: RAI ML1018100912010-07-0808 July 2010 Request for Additional Information Related to the Environmental Site Audit for Columbia Generating Station License Renewal Project stage: RAI ML1018802892010-07-15015 July 2010 June 28, 2010, Summary of Telephone Conference Call Held Between NRC and Energy Northwest Concerning Draft Requests for Additional Information Pertaining to the SAMA Review of the Columbia Generating Station License Renewal Application Project stage: Draft RAI GO2-10-105, Response to Request for Additional Information License Renewal Application2010-08-0505 August 2010 Response to Request for Additional Information License Renewal Application Project stage: Response to RAI ML1023802882010-08-0909 August 2010 Response to Request for Additional Information License Renewal Application, Enclosure B, Terrestrial Ecology Documents Project stage: Response to RAI GO2-10-108, Response to Request for Additional Information, License Renewal Application2010-08-0909 August 2010 Response to Request for Additional Information, License Renewal Application Project stage: Response to RAI ML1021003032010-08-10010 August 2010 Schedule Revision for the Environmental Review of the Columbia Generating Station License Renewal Application Project stage: Approval GO2-10-138, Response to Request for Additional Information on License Renewal Application2010-09-17017 September 2010 Response to Request for Additional Information on License Renewal Application Project stage: Response to RAI ML1026302282010-10-0101 October 2010 Summary of Tribal Outreach Informational Meeting Concerning Columbia Generating Station License Renewal and Hanford Low Level Waste Project stage: Meeting ML1028709842010-11-10010 November 2010 Request for Additional Information for the Review of the Columbia Generating Station License Renewal Application-Sama Review Project stage: RAI ML1035106682010-12-17017 December 2010 E-mail Dtd 12/17/2010, Subj: NRC Ba/Efh Assessment for Columbia Generating Station License Renewal Review Project stage: Other GO2-10-178, Response to Request for Additional Information License Renewal Application2010-12-21021 December 2010 Response to Request for Additional Information License Renewal Application Project stage: Response to RAI ML1027702322010-12-29029 December 2010 Issuance of Environmental Scoping Summary Report Associated with the Staffs Review of the Application by Energy Northwest for Renewal of the Operating License for Columbia Generating Station Project stage: Approval ML1034305262011-01-10010 January 2011 Schedule Revision for the Review of the Columbia Generating Station License Renewal Application Project stage: Approval ML1034001632011-01-18018 January 2011 Summary of Site Visit in Support of the Environmental Review of the License Renewal Application for Columbia Generating Station Project stage: Approval ML1101805242011-01-18018 January 2011 License Renewal, e-mail Dated 1/18/2011 Project stage: Other GO2-11-032, Response to Request for Additional Information for the Review of the License Renewal Application2011-01-28028 January 2011 Response to Request for Additional Information for the Review of the License Renewal Application Project stage: Response to RAI GO2-11-025, Response to Request for Additional Information on License Renewal Application2011-01-28028 January 2011 Response to Request for Additional Information on License Renewal Application Project stage: Response to RAI ML1104005102011-03-0101 March 2011 1/19/11 Summary of Telephone Conference Call Held Between USNRC and Energy Northwest Concerning Requests for Additional Information Pertaining to the SAMA Review of the Columbia Generating Station License Renewal Application Project stage: RAI ML1106703792011-03-10010 March 2011 Request for Additional Information for the Review of the Columbia Generating Station License Renewal Application - Severe Accident Mitigation Alternative Review Project stage: RAI GO2-11-082, Environmental Authorizations for CGS Operations2011-04-20020 April 2011 Environmental Authorizations for CGS Operations Project stage: Request GO2-11-092, Response to Request for Additional Information Related to the Review of the Severe Accident Mitigation Alternative Analysis2011-05-0606 May 2011 Response to Request for Additional Information Related to the Review of the Severe Accident Mitigation Alternative Analysis Project stage: Response to RAI ML11157A0362011-06-0505 June 2011 Letter from Heart of America Northwest Public Involvement Lists and Notices, Including Requests to Be Added to Lists and Requests for Hearings on the Draft EIS for Columbia Generating Station Project stage: Request ML1116001872011-06-0909 June 2011 E-mail Dtd 6/9/11, Subj: Energy Nw, Columbia Generating Station Public Involvement and Notice List, Request for Hearings Re EIS Project stage: Other ML11151A2222011-06-14014 June 2011 Schedule Revision for the Environmental Review of the Columbia Generating Station License Renewal Application Project stage: Approval ML1116802212011-06-16016 June 2011 Request for List of Protected Species within the Area Under Evaluation for the Columbia Generating Station License Renewal Application Review Project stage: Request ML1117501882011-06-23023 June 2011 Environmental Authorizations for Current CGS Operations Project stage: Other ML1118219752011-06-27027 June 2011 E-mail Dtd 6/27/2011, Subj: NRC Ba/Efh Assessment for Columbia Generating Station License Renewal Review Project stage: Other ML11165A0232011-08-23023 August 2011 Biological Assessment and Essential Fish Habitat Assessment for License Renewal of Columbia Generating Station Project stage: Other ML11214A2372011-08-30030 August 2011 RAI for the Review of the Columbia Generating Station LRA-Severe Accident Mitigation Alternative Review Project stage: RAI ML11227A0072011-08-31031 August 2011 NUREG-1437 Supp 47 Dfc Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Columbia Generating Station. Project stage: Acceptance Review ML11252B0532011-09-0101 September 2011 Comment (1) of Robert G. Whitlam, on Behalf of Washington Dept of Archaeology & Historic Preservation Columbia Generating Station License Renewal Project stage: Other 2010-08-10
[Table View] |
Text
1 NRR-PMDAPEm Resource From:
Richard Domingue [richard.domingue@noaa.gov]
Sent:
Friday, February 10, 2012 8:36 PM To:
Doyle, Daniel
Subject:
Columbia Generating Station Additional Information Request Attachments:
Feb 2012 additional Info request - Columbia Generating Station (2).docx Dan, As per our previous discussion, attached is an additional information request for information needed for the relicensing of CGS. Please feel free to contact me with any questions.
Richard Domingue 503-231-6858
Hearing Identifier:
NRR_PMDA Email Number:
269 Mail Envelope Properties (CAEJyb6NfVx1B+s8P9ChNrzu5G7W5Emnuha5dNySLn_Yy4kwk-g)
Subject:
Columbia Generating Station Additional Information Request Sent Date:
2/10/2012 8:35:35 PM Received Date:
2/10/2012 8:35:21 PM From:
Richard Domingue Created By:
richard.domingue@noaa.gov Recipients:
"Doyle, Daniel" <Daniel.Doyle@nrc.gov>
Tracking Status: None Post Office:
mail.gmail.com Files Size Date & Time MESSAGE 229 2/10/2012 8:35:21 PM Feb 2012 additional Info request - Columbia Generating Station (2).docx 17944 Options Priority:
Standard Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
Recipients Received:
February 10, 2012 To: Dan Doyle, Nuclear Regulatory Commission From: Rich Domingue, National Marine Fisheries Service RE:
Additional Information Request regarding license renewal of The Columbia Generating Station Consultation No. F/NWR/2011/05286.
We have identified two aspects of the Columbia Generating Station configuration and operations as presented in Supplement 47 of the Generic EIS for License Renewal of Nuclear Plants, Regarding the Columbia Generating Station that have a potential to adversely affect fish species listed under the ESA, or covered under the Magnuson Stevens Act: the cooling system make-up water intake, and effluent outfall 001. At present insufficient information is available to NMFS to evaluate these potential adverse effects. We request the following information.
- 1. Copies of impingement and/or entrainment studies conducted on the existing intake screens. Your letter of December 20, 2011 refers to two entrainment studies that have been conducted on the existing intakes conducted in 1979-1980 and 1985 as providing evidence that the existing screens are not likely to adversely affect ESA-listed fish species. Please provide copies of these studies, including methods and results for our consideration.
- 2. A complete intake screen design report. NMFS has developed a fish screen design summary form that provides information pertinent to evaluating the likely effectiveness of water intake screens to avoid or minimize take of listed species (attached). Please complete the attached screen design summary form except those areas we have identified as not applicable (N/A). Some of the requested information is available in the Draft EIS you have provided. However, we need all of the information requested and placing all pertinent information in the summary format would assist our timely review.
- 3. While the 001 outfall discharges a small amount of water, its physical and chemical characteristics are not well defined and could adversely affect individual fish passing in the immediate vicinity of the outfall. Because the condenser tubing has been replaced, effluent data from the period prior to this replacement does not accurately represent the characteristics of this waste stream. NMFS expects that effluent conditions have improved since this upgrade. Please provide water quality characteristics for this outfall collected pursuant to NPDES permit WA0025151-1 summarized on a quarterly basis (seasonal) over a period of at least one year.
NRC should estimate the potential effects of this discharge on Upper Columbia River spring Chinook salmon and steelhead and Upper Columbia River summer/fall Chinook salmon and Columbia River coho (for which essential fish habitat has been designated under the Magnuson-Stevens Act). Both direct effects (e.g. toxicity to salmonids) and indirect effects (e.g. in the event that discharged effluent is warmer than the Columbia River, a potential would exist for additional predation by introduced warm water fishes that may be attracted to and enhanced by the warmer water provided by the outfall) should be considered. The potential for adverse effects varies by season and NRC should address potential adverse effects on each inland life stage and pay particular attention to fry and juvenile life stages as these life stages are most susceptible to adverse water quality conditions. Your draft EIS cites thermal drift studies that were conducted in 1985 (WPPSS 1986) as evidence that heated effluent from the cooling system does not adversely affect anadromous fish that may encounter the waste plume. Although we anticipate that the current effluent characteristics are not the same as those prior to the condenser tubing replacement, please provide a copy of this study for our consideration.
Juvenile Fish Screen Design Summary Provided by:
Date:
Contact information:
I. Description of site including name of diverted stream, type of diversion, type of headgate, metering device, site name.
II. Water Surface Elevation (WSE) Data. Generally indicate method used to determine and estimate flows and elevations. Elevations can be relative to local benchmark, and period of record should be limited to the downstream juvenile migration season.
- 1. River WSE and streamflow near site of bypass return (open channel diversions only) NA
- a. 5% exceedence flow =
CFS, WSE =
- b. 95% exceedence flow =
CFS, WSE =
- 2. River WSE and streamflow at point of diversion
- a. 5% exceedence flow =
CFS, WSE =
- b. 95% exceedence flow =
CFS, WSE =
- 3. Diverted flow and associated WSE on the screen
- a. Maximum diversion =
CFS, WSE =
- b. Normal diversion =
CFS, WSE =
- c. Minimum diversion =
CFS, WSE =
III. Screen structure
- 1. Type of screen (rotary drum, fixed vertical, etc.): Attach detailed drawing of screen, including dimensions, mesh, seals
- 2. Angle of screen relative to ditch flow: NA
- 3. Screen cleaning mechanism (drum rotation, backspray, brushes etc.):
- 4. Screen cleaner powered by (electric motor, paddlewheel, hydraulic motor etc.):
- 5. Minimum submerged screen area:
- 6. Length of screen:
- 7. Bottom and top elevation of flow area of the screen:
- 8. Screen diameter (drum or cylindrical screens): NA
- 9. For pump intake screens, list brand, model, cleaning mechanism:
- 10. Describe inspection, operations and maintenance program.
IV. Recommended bypass return pipe (if applicable) NA - (probably)
- 1. Pipe diameter =
- 2. Length required (to preferred outfall site) =
- 3. Pipe slope (rise/run) =
- 4. Bypass flow and flow control device (weir length or orifice size):
- 5. Outfall type (submerged, free-fall, open channel):
- 6. Approximate river velocity at outfall =
- 7. Minimum outfall depth =
- 8. Ditch invert elevation =
V. Other site characteristics and constraints (examples: fish species/life stage present, access problems, stream characteristics at bypass outfall site, construction site problems, excessive cut/fill, land owner problems, irrigation season, river flow, construction window, ice jam problems, sedimentation potential, winter operation required for stock water, consolidation potential, irrigation methods that impact indicated water surface elevations, screen location constraints, road/bridge construction required, excessive or unusual debris load etc.). Indicate method of coping with constraints.
VI. Site sketch. Include screen location, river geometry near screen site.
VII. Ditch cross sections (if applicable). Include invert elevations relative to benchmark, distance between cross-sections, and water surface elevation. NA