MONTHYEARIR 05000397/20240032024-11-12012 November 2024 Integrated Inspection Report 05000397/2024003 ML24298A2092024-11-0606 November 2024 – Alternative Requests 5IST-01 (RP01), 5IST-02 (RP02), and 5IST-03 (RP03) – Fifth Interval Inservice Testing Program ML24234A0292024-11-0505 November 2024 Environmental Assessment and Finding of No Significant Impact Related to License Amendment Request to Revise Emergency Plan (EPID L-2024-LLA-0011) - Letter GO2-24-110, Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification GO2-24-109, Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations GO2-24-100, Response to Request for Additional Information Regarding Request for Fourth Ten-Year Interval Inservice Testing2024-11-0404 November 2024 Response to Request for Additional Information Regarding Request for Fourth Ten-Year Interval Inservice Testing ML24290A1142024-10-17017 October 2024 CGS FPTI 2024011 GO2-24-088, Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-24024 September 2024 Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan GO2-24-051, Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2024-09-23023 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24247A1572024-09-12012 September 2024 Withholding Determination Letter for Presentation Materials for Energy Northwest Pre-application Meeting 8-9-2024 ML24255A1012024-09-12012 September 2024 Request for Withholding Information from Public Disclosure Energy Northwest Regulatory Engagement Plan, Revision 0 GO2-24-082, Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-10010 September 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan IR 05000397/20240052024-08-22022 August 2024 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2024005) IR 07200035/20244012024-08-19019 August 2024 Security Baseline Inspection Report 07200035/2024401 IR 05000397/20244022024-08-13013 August 2024 Security Baseline Inspection Report 05000397/2024402 IR 05000397/20240022024-08-0909 August 2024 Integrated Inspection Report 05000397/2024002 GO2-24-060, Reply to a Notice of Violation, EA-21-170 and EA-23-0542024-07-30030 July 2024 Reply to a Notice of Violation, EA-21-170 and EA-23-054 GO2-24-070, Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program2024-07-29029 July 2024 Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program GO2-24-063, Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan2024-07-15015 July 2024 Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan IR 05000397/20240122024-07-10010 July 2024 – Safety Conscious Work Environment Issue of Concern Follow-up Inspection 05000397/2024012 ML24180A1482024-06-28028 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000397/2024011) and Request for Information IR 05000397/20244202024-06-27027 June 2024 – Security Baseline Inspection Report 05000397 2024420 Cover Letter GO2-24-057, Notice of Readiness for Supplemental Inspection2024-06-19019 June 2024 Notice of Readiness for Supplemental Inspection ML24099A2232024-06-12012 June 2024 Issuance of Amendment No. 275 to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-24-056, Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing2024-06-11011 June 2024 Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing ML24128A2242024-05-31031 May 2024 Issuance of Amendment No. 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-13013 May 2024 2023 Annual Radiological Environmental Operating Report GO2-24-050, Annual Environmental Operating Report2024-04-30030 April 2024 Annual Environmental Operating Report IR 05000397/20240012024-04-24024 April 2024 Integrated Inspection Report 05000397/2024001 GO2-24-042, 2023 Annual Radioactive Effluent Release Report2024-04-22022 April 2024 2023 Annual Radioactive Effluent Release Report ML24089A2282024-04-15015 April 2024 – Acceptance of Requested Licensing Action License Amendment Request to Revise Columbia Generating Station Emergency Plan ML24074A4532024-04-11011 April 2024 Request for Withholding Information from Public Disclosure GO2-24-044, Voluntary Response to Regulatory Issue Summary 2024-012024-04-11011 April 2024 Voluntary Response to Regulatory Issue Summary 2024-01 IR 05000397/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000397/2024401 (Cover Letter Only) IR 05000397/20244032024-03-28028 March 2024 Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000397/2024403 GO2-24-034, Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan2024-03-20020 March 2024 Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan ML24058A0692024-03-14014 March 2024 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Emergency Plan ML24044A0492024-03-12012 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0064 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) GO2-24-041, Level of Financial Protection - Annual Reporting Requirement2024-03-12012 March 2024 Level of Financial Protection - Annual Reporting Requirement GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate2024-03-11011 March 2024 Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate GO2-24-039, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462024-03-11011 March 2024 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 ML24047A0422024-03-0707 March 2024 Issuance of Amendment No. 273 Renewed Facility Operating License and Technical Specification Clean Up IR 05000397/20230062024-02-28028 February 2024 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2023006) IR 05000397/20253012024-02-14014 February 2024 Notification of NRC Initial Operator Licensing Examination 05000397/2025301 GO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing 05000397/LER-2024-001, Failure to Track Operability of Requirements of Transversing In-Core Probe Valves2024-01-22022 January 2024 Failure to Track Operability of Requirements of Transversing In-Core Probe Valves GO2-24-014, Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information 2024-09-24
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24296B1852024-10-16016 October 2024 NRR E-mail Capture - Final - Request for Additional Information - Columbia - Relief Request for Fourth Ten-Year Interval Inservice Testing - EPID: L-2024-LLR-0039 ML24215A3672024-08-0101 August 2024 NRR E-mail Capture - Final Request for Additional Information - Columbia Generating Station - License Amendment Request to Revise Emergency Plan - EPID L-2024-LLA-0011 ML24169A0402024-06-14014 June 2024 NRR E-mail Capture - Final Request for Additional Information - Columbia Generating Station (Columbia) - Relief Requests for the Fifth Ten-Year Interval Inservice Testing - EPIDs (L-2024-LLR-007 Through 0013) ML24058A0692024-03-14014 March 2024 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Emergency Plan ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information ML23110A2642023-04-20020 April 2023 Request for Information License Renewal Phase 2 Inspection ML22343A1802022-12-0808 December 2022 February 2023 Emergency Preparedness Program Inspection - Request for Information ML22301A1432022-10-28028 October 2022 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Adopt TSTF-505 - EPID L-2022-LLA-0023 ML22242A1082022-08-30030 August 2022 Information Request, Information Request, Security IR 2022404 ML22235A1052022-08-22022 August 2022 August 2022 Emergency Preparedness Exercise Inspection Request for Information IR 05000397/20224012022-06-0606 June 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000397/2022401 ML22144A0342022-05-18018 May 2022 NRR E-mail Capture - Draft - Request for Additional Information - Columbia Generating Station - LAR to Change TS 3.4.11 - Reactor Coolant System Pressure and Temperature Limits - EPID L-2021-LLA-0191 ML22041A4572022-02-10010 February 2022 Notification of NRC Design Bases Assurance Inspection (Team) (05000397/2022010) and Request for Information ML21277A3572021-10-12012 October 2021 CGS Brq RFI Letter, Columbia Generating Station - Notification of Inspection (NRC Inspection Report 05000397/2021004) and Request for Information ML21216A0502021-08-0303 August 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia - License Amendment Request to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO EPID L-2021-LLA-0259 ML21209A9792021-07-28028 July 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) - EPID L-2021-LLA-0074 ML21120A1182021-04-30030 April 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - On-Site Cooling System Sediment Disposal Approval Request - EPID L-2020-LLL-0031 ML21068A2842021-03-0404 March 2021 2021002 Inservice Inspection (ISI) Request for Information (RFI) ML20336A1852020-11-30030 November 2020 NRR E-mail Capture - Final - RAI - Columbia - One -Time Exemption from 10 CFR 73, App B, Sect VI, Subsection C.3.(l)(1) Regarding Annual Force-On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 ML20325A0402020-11-19019 November 2020 NRR E-mail Capture - Draft - RAI - Columbia - One -Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force -On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 ML20267A5162020-09-23023 September 2020 NRR E-mail Capture - Columbia Generating Station - Final - Request for Additional Information - Fourth Ten-Year Interval Inservice Inspection (ISI) Program Relief Request 4ISI-09 - EPID L-2020-LLR-0068 ML20245E2822020-08-31031 August 2020 NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time ML20239A9702020-08-26026 August 2020 NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time ML20149K4362020-05-26026 May 2020 NRR E-mail Capture - Formal RAIs for Columbia (COVID-19) QA Plan Change Surveillance, Request Response by Tuesday June 2, 2020 ML20112F4572020-04-21021 April 2020 NRR E-mail Capture - Official Release of NRC RAIs for Columbia Covid Exigent Due Friday April 24, 2020 ML20034E6082020-02-0303 February 2020 NRR E-mail Capture - RAI Formal Release Columbia TSTF 563 LAR, 30 Day Response Period Due March 3, 2020 ML20028E1512020-01-27027 January 2020 Notification of Evaluations of Changes, Tests, and Experiments Inspection (Inspection Report 05000397/2020002) and Request for Information IR 05000397/20200102020-01-14014 January 2020 Information Request to Support Upcoming Temporary Instruction 2515/193 Inspection at Columbia Generating Station (Inspection Report 05000397/2020010) ML19267A1842019-09-24024 September 2019 Request for Information for Upcoming Open Phase Condition Inspection at Columbia Generating Station ML19232A2282019-08-20020 August 2019 NRR E-mail Capture - Formal Release of RAIs Ref: Columbia Exigent Amendment - One Electrical RAI, ML19183A4752019-07-0202 July 2019 NRR E-mail Capture - Formal Release of RAIs Ref: Columbia HVAC LAR L-2019-LLA-0034 ML18088A0152018-03-29029 March 2018 Notification of NRC Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/ Staffing/Multi-Unit Dose Assessment Plans (05000397/2018010) and Request for ML17341B0272017-12-0707 December 2017 NRR E-mail Capture - RAI Associated with Columbia Amendment Request Revise Tech Spec 5.5.12 for Permanent Extension of Type a and Type C Containment Testing Frequencies for MF9469, EPID: L-2017-LLA-0197, ILRT, LLRT LAR - New RAI Response Da ML17292A0572017-10-18018 October 2017 NRR E-mail Capture - New RWCU RAI Due Date Now November 24, 2017 ML17249A6882017-09-0606 September 2017 NRR E-mail Capture - RAIs for Columbia Relief Request RAI (MF8925), 3ISI-19 ML17205A3152017-07-20020 July 2017 Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000397/2017004) and Request for Information ML17193A2192017-07-12012 July 2017 NRR E-mail Capture - Columbia RWCU LAR MF8318, Formal Release of RAIs ML17144A1702017-05-24024 May 2017 NRR E-mail Capture - NRC RAIs for Columbia Relief Request MF8922, 3ISI-16 ML17047A7492017-02-16016 February 2017 Response to Request for Additional Information, Columbia Mur LAR Evib Rais ML17006A0902017-01-0404 January 2017 NRR E-mail Capture - Non Proprietary Request for Additional Information Regarding Columbia Mur Power Uprate ML17006A0922017-01-0404 January 2017 NRR E-mail Capture - Eicb RAIs for Columbia Mur ML16356A1382016-12-21021 December 2016 NRR E-mail Capture - Columbia Mur LAR Evib RAIs Non - Proprietary Version - Revise Operating License and Technical Specifications for Measurement Uncertainty Recapture Power Uprate ML16342C4322016-12-0707 December 2016 NRR E-mail Capture - Columbia Measurement Uncertainty Recapture Power Uprate LAR Rais: Human Performance: MF8060, Formal Release for Response on Monday January 9, 2017 ML16327A1842016-11-22022 November 2016 NRR E-mail Capture - Non Proprietary Request for Additional Information Regarding Columbia Mur Power Uprate ML16323A1192016-11-16016 November 2016 NRR E-mail Capture - Eicb RAIs for Columbia Mur ML16218A3902016-08-0808 August 2016 Supplemental Information Needed for Acceptance of Requested Licensing Action, Request for Measurement Uncertainty Recapture (Mur) Power Uprate (from 3486 Mwt to 3544 Mwt) ML16194A3702016-07-11011 July 2016 Notification of NRC Triennial Heat Sink Performance Inspection 05000397/2016003 and Request for Information ML16069A3592016-03-0909 March 2016 NRR E-mail Capture - Second Round Rais: Columbia MF6042 LAR TSTF-425 ML16061A5542016-03-0101 March 2016 Notification of NRC Design Bases Inspection (05000397/2016007) and Initial Request for Information ML16061A5662016-03-0101 March 2016 Notification of Design Bases Inspection (Programs)(Inspection Report 05000397/2016008) and Initial Request for Information 2024-08-01
[Table view] |
See also: IR 05000397/2022010
Text
February 10, 2022
Mr. Robert Schuetz, Chief Executive Officer
Energy Northwest
MD 1023
76 North Power Plant Loop
P.O. Box 968
Richland, WA 99352
SUBJECT:
COLUMBIA GENERATING STATION - NOTIFICATION OF NRC DESIGN
BASES ASSURANCE INSPECTION (TEAM) (05000397/2022010) AND
REQUEST FOR INFORMATION
Dear Mr. Schuetz:
The purpose of this letter is to notify you that U.S. Nuclear Regulatory Commission (NRC) staff
will conduct a triennial baseline design bases assurance inspection at your Columbia
Generating Station beginning on April 21, 2022. The inspection will be conducted in
accordance with NRC Inspection Procedure (IP) 71111.21M, Design Bases Assurance
Inspection (Team), dated December 8, 2016, by a team lead, four engineering-focused
inspectors, and one operations-focused inspector.
The inspection will consist of an information gathering visit by the team lead, in-office
preparation, and two weeks of onsite inspection. The current inspection schedule is as follows:
Onsite Information Gathering Visit: April 21, 2022
In-office Preparation Weeks: May 2-6, 2022
Onsite Inspection Weeks: May 9-13, 2022, and May 23-27, 2022
The purpose of the information gathering visit is to identify potential risk significant samples and
operator actions. Additionally, the team lead will request a tour of the plant and interviews with
operations and probabilistic safety assessment staff. During the onsite weeks, several days and
administration will be needed on the plant-referenced simulator to facilitate performance of
operator action-based scenarios and job performance measures. Additional information needed
to support the inspection will be identified during the in-office preparation and onsite inspection
weeks, including interviews with engineering managers, engineers, operations, and probabilistic
safety assessment staff.
The objectives of this inspection are to gain reasonable assurance that: 1) risk significant
structures, systems, and components can adequately perform their design basis function,
2) modifications affecting the design and licensing bases have been adequately implemented,
and 3) risk significant issues resulting from generic communications (i.e., operating experience)
have been adequately addressed. Completion of this inspection procedure consists of a
minimum sample size of eight component and modification samples and one operating
experience sample.
R. Schuetz
2
To minimize the impact the inspection has on the site and to ensure an efficient inspection, we
have enclosed a request for information needed for the inspection. It is important that these
requests are fulfilled as completely and accurately as possible to minimize any additional
requests during the preparation or onsite inspection weeks. The requests have been divided
into three groups.
The first group lists information necessary for our initial inspection scoping activities and
sample selections. This information should be available to the team lead no later than
April 13, 2022. The team lead will review the information prior to and during the
information gathering visit and communicate the initial list of component, modification,
and operating experience samples as soon as practicable.
The second group of information requested includes those items needed to support our
in-office preparation activities. This set of documents should be available no later than
May 2, 2022. This information should be separated for each sample, especially if
provided electronically. Note that the team may identify additional information needed to
support the inspection during this week and will communicate those requests as soon as
practicable.
All information requested are to be for the time from the onsite inspection period back to the last
triennial design bases assurance inspection (team) unless stated otherwise. If nothing
addressing a request was done in that time, then the request applies to the last applicable
document. If a request does not apply for any sample, no response is necessary. Include all
attachments to the requests, especially corrective action program documents.
We have discussed the schedule for this inspection with your staff and our regulatory services
contact. If there are any questions about this inspection or the documents requested, please
contact the lead inspector, Gerond A. George, by telephone at 817-200-1562 or by e-mail at
Gerond.George@nrc.gov.
PAPERWORK REDUCTION ACT STATEMENT
This letter contains mandatory information collections that are subject to the Paperwork
Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)
approved these information collections (approval number 3150-0011). Send comments
regarding this information collection to the Information Services Branch, Office of the Chief
Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office
of Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and
Budget, Washington, DC 20503.
PUBLIC PROTECTION NOTIFICATION
The NRC may not conduct nor sponsor, and a person is not required to respond to, a request
for information or an information collection requirement unless the requesting document
displays a currently valid OMB control number.
R. Schuetz
3
This letter, its enclosure, and your response (if any) will be made available for public inspection
and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document
Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public
Inspections, Exemptions, Requests for Withholding.
Sincerely,
Vincent G. Gaddy, Chief
Engineering Branch 1
Division of Reactor Safety
Docket: 50-397
License: NPF-21
Enclosure:
As stated
Cc w/ encl: Distribution via LISTSERV
Vincent G. Gaddy
Digitally signed by Vincent G.
Gaddy
Date: 2022.02.10 14:30:49 -06'00'
ML22041A457
SUNSI Review
ADAMS:
Non-Publicly Available
Non-Sensitive Keyword:
By: GAG
Yes No
Publicly Available
Sensitive NRC-002
OFFICE
DRS/EB1
DRS/EB1
NAME
GGeorge
VGaddy
SIGNATURE
/RA/
/RA/
DATE
2/10/2022
2/10/2022
Enclosure
Request for Information
Design Bases Assurance Inspection (Team)
Columbia Generating Station
Inspection Report:
05000397/2022010
Information Gathering Dates:
April 21, 2022
Onsite Inspection Dates:
May 9-13, 2022, and May 23-27, 2022
Inspection Procedure:
IP 71111.21M, Design Bases Assurance Inspection
(Team)
Lead Inspector: Gerond A. George, Senior Reactor Inspector
I.
Information Requested by April 13, 2022:
1. A sortable list of equipment basic events (with definitions), including importance
measures sorted by risk achievement worth (RAW) and Fussell-Vesely (FV) from your
internal events probabilistic risk assessment (PRA). Include basic events with RAW
value of 1.3 or greater.
2. A sortable list of the top 50 cut-sets from the stations PRA.
3. A copy of any PRA system notebooks and the latest PRA summary document.
4. A sortable list of PRA human action basic events or risk ranking of operator actions from
your site-specific PRA sorted by RAW and FV. Provide copies of your human reliability
worksheets for these items.
5. If you have an external events or fire PRA model, provide the information requested in
items 1-4 for external events and fire.
6. A copy of the Individual Plant Examination of External Events (IPEEE).
7. A sortable list of high large early release frequency (LERF) impact events and
associated components.
8. A sortable list of structures, systems, and components in the Maintenance Rule (a)(1)
category.
9. A sortable list of high-risk maintenance rule systems/components and functions based
on engineering or expert panel judgment.
10. A list of the stations top 10 issues if available.
11. A list of structures, systems, and components associated with calculations having low
design margins if available.
2
12. A list of any common-cause failures of components.
13. A list of root cause evaluations associated with component failures or design issues
initiated/completed in the last 5 years.
14. A copy of any time-critical and time-sensitive program procedures and a list of all time-
critical and/or time-sensitive operator actions in procedures if not included.
15. A copy of any procedures used to accomplish operator actions associated with the basic
events credited in your PRA.
16. A sortable list of current operator work arounds/burdens and any program procedures
related to operator work arounds/burdens.
17. A list with brief descriptions of permanent and temporary modifications implemented in
the past 5 years to structures, systems, and components. Implemented means
accepted or placed into service and declared functional or operable, as applicable.
Modifications include, for example, permanent or temporary plant changes, design
changes, set point changes, procedure changes, equivalency evaluations, suitability
analyses, calculations, and commercial grade dedications.
18. A sortable list with brief descriptions of operating experience evaluations opened and/or
closed. Include whether it was applicable and if the evaluation and any associated
actions, such as modifications, procedure updates, etc., are complete.
19. A copy of any internal/external self-assessments or audits and associated corrective
action documents generated in preparation for this inspection or related to engineering
or operations.
20. A copy of the technical specifications, surveillance frequency control program, inservice
testing program, preventive maintenance program, technical requirements manual, and
the final safety analysis report (as updated). Include bases documents as applicable.
21. A copy of condition reports associated with inspection findings from the previous NRC
design bases inspection.
22. A list of licensee contacts for the inspection team with phone numbers.
23. A copy of the current management and engineering organizational charts.
II. Information Requested by May 2, 2022:
1. Components
a. A copy of the design bases document, system description, etc.
b. A copy of any vendor manuals (e.g., installation, operation, maintenance, etc.)
3
c. A copy of any relevant, active calculations and drawings. If the number of
calculations and/or drawings is extensive, provide a list instead.
d. A list of the preventive maintenance schedule, including any inservice, surveillance,
etc. testing, and a copy of the most recent performance of each.
e. A copy of the system health notebook
f.
A copy of any corrective action documents covering the past 3 years
g. A copy of any relevant normal, abnormal, or emergency procedures
2. Modifications
a. A copy of the complete change package
b. A copy of the implementing work order, job, etc.
c. A copy of post-modification testing work orders, jobs, etc.
d. A copy of any associated corrective action documents
e. A copy of any vendor manuals (e.g., operation and maintenance)
f.
A copy of any updated procedures, licensing basis documents, calculations,
drawings, etc.
3. Operating Experiences
a. A copy of the complete operating experience evaluation
b. A copy of any associated corrective action documents
c. A copy of any associated change packages
d. A copy of any updated procedures, licensing basis documents, calculations,
drawings, etc.
III. Additional Requests During Onsite Inspection Activities:
1. A copy of any corrective action documents generated because of the team's requests or
questions during this inspection.
2. A copy of a list of questions submitted by the team and the status/resolution of the
information requested (provide daily during the inspection to each team member).
4
Inspector Contact Information:
Gerond A. George, Lead
Senior Reactor Inspector
817-200-1562
Gerond.George@nrc.gov
Jonathan Braisted
Reactor Inspector
817-200-1469
Jonathan.Braisted@nrc.gov]
Fabian Thomas
Reactor Inspector
817-200-1126
Fabian.Thomas@nrc.gov
Chris Smith
Health Physicist/Reactor
Inspector
817-200-1095
Chris.Smith@nrc.gov
Marcus Chisolm
Reactor Inspector
817-200-1426
Marcus.Chisolm@nrc.gov
Rick Deese
Senior Reactor Analyst
817-200-1573
Rick.Deese@nrc.gov
Mailing Address:
U.S. NRC, Region IV
Attn: Gerond A. George
1600 East Lamar Blvd.
Arlington, TX 76011-4511