ML18149A148

From kanterella
Revision as of 01:54, 21 October 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards Revised App 3 to Emergency Plan & Revs to Emergency Plan Implementing Procedures,Including Rev 16 to EPIP-3.01 Re Callout of Emergency Response Personnel & Rev 3 to EPIP-3.03 Re Activation of Operational Support Ctr
ML18149A148
Person / Time
Site: Surry  Dominion icon.png
Issue date: 05/02/1986
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18130A419 List:
References
86-246, NUDOCS 8605080145
Download: ML18149A148 (1)


Text

.e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261

  • W. L. STEWABT.

VxcB PRESIDENT May 2, 1986 NucLEAR OPERATIONS Dr. J. Nelson Grace Serial No.86-246 Regional Administrator NO/WDC Region II Docket Nos. 50-280 U.S. Nuclear Regulatory Commission 50-281 Suite 2900 License Nos. DPR-32 101 Marietta St., N.W. DPR-37 Atlanta, Georgia 30323

Dear Dr. Grace:

These revisions do not decrease the effectiveness of our Emergency Plan, and the plan, as changed, continues to meet the standards of 10 CFR 50.47(b).

Enclosures cc: Document Control Desk (2)

Mr. Lester S. Rubenstein, Director - w/o enclosures PWR Project Directorate No. 2 Division of PWR Licensing-A Mr. Chandu P. Patel - w/o enclosures NRC Surry Project Manager PWR Project Directorate No. 2 Division of PWR Licensing-A NRC Senior Resident Inspector - w/o enclosures Surry Power Station r aoosoeo145

~DR ADOCK gt8&8~ao PDR

\

. I I

i