ML13107B494

From kanterella
Revision as of 06:01, 22 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
04/16/2013 Meeting Summary with the Public to Discuss the Annual Assessment of the Watts Bar Nuclear Unit 2 Construction Project
ML13107B494
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 04/17/2013
From: Haag R
NRC/RGN-II/DCP/CPB3
To: Skaggs M
Tennessee Valley Authority
Michelle Adams
References
IR-13-601
Download: ML13107B494 (5)


Text

April 17, 2013 Mr. Michael D. Skaggs Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

PUBLIC MEETING

SUMMARY

- WATTS BAR NUCLEAR PLANT UNIT 2 (NRC INSPECTION REPORT 05000391/2013601)

Dear Mr. Skaggs:

This refers to the meeting conducted at our request at the Comfort Inn Hotel in Athens, TN on April 16, 2013 at 1:00 p.m. The meeting's purpose was to provide opportunities to discuss the annual assessment of the Watts Bar Nuclear Unit 2 Construction Project with the public.

On April 16, 2013, the NRC's Chief of Construction Projects Branch 3, and the Resident Inspectors, held a Category 1 meeting that was attended by members of the public and TVA employees. This Category 1 public meeting provided an informative presentation to engage the public in a discussion of the NRC's annual assessm ent of the Watts Bar Nuclear Plant Unit 2 construction project for the period from January 1 through December 31, 2012. The list of attendees (Enclosure 1) and the presentation material used for discussions (Enclosure 2) are attached to this letter.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document

Room (PDR) or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this meeting, please contact James Baptist at 404-997-4506

. Sincerely, /RA/ Robert Haag, Chief Construction Projects Branch 3 Division of Construction Projects

Enclosures:

1. List of Attendees 2. Handout- 2012 EOC WB2 Presentation_Public UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257

M. Skaggs 2 cc w/encl:

Mr. Gordon P. Arent

Senior Manager, Licensing WBN Unit Two Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381

Mr. O. J. Zeringue, General Manager Engineering and Construction WBN Unit Two Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381

Mr. R. A. Hruby, General Manager Technical Services WBN Unit Two Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City Tennessee 37381

Ms. Donna Guinn, Manager Licensing and Industry Affairs

WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381

Mr. Preston D. Swafford

Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 1101 Market Place 3R Lookout Place Chattanooga, Tennessee 37402-2801

County Executive 375 Church Street Suite 215 Dayton, Tennessee 37321

Mr. Dave Gronek Plant Manager, WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381

Mr. R. R. Baron, Senior Manager Nuclear Construction Quality Assurance WBN Unit Two Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381

Mr. Joseph Shea, Vice President Nuclear Licensing Tennessee Valley Authority

1101 Market Street

3R Lookout Place

Chattanooga, TN 37402-2801 Mr. E. J. Vigluicci Assistant General Counsel Tennessee Valley Authority

400 West Summit Hill Drive 6A West Tower Knoxville, Tennessee 37402

Mr. Lawrence E. Nanney, Director Tennessee Department of Environmental

Health & Conservation Division of Radiological Health 3 rd Floor, L&C Annex 401 Church Street

Nashville, TN 37243-1532

Mr. T. P. Cleary Site Vice President Watts Bar Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381 County Mayor P.O. Box 156 Decatur, Tennessee 37322

Ms. Ann P. Harris 341 Swing Loop Rockwood, TN 37854

M. Skaggs 3 cc email distribution w/encl:

Greg Scott Tennessee Valley Authority Electronic Mail Distribution

Watts Bar 2 Licensing Tennessee Valley Authority Electronic Mail Distribution Brenda Derrick Electronic Mail Distribution

ML13107B494

_ _____ P SUNSI REVIEW COMPLETE Letter to Michael D. Skaggs from Robert C. Haag dated April 17, 2013.

SUBJECT:

PUBLIC MEETING

SUMMARY

- WATTS BAR NUCLEAR PLANT UNIT 2 (NRC INSPECTION REPORT 05000391/2013601)

Distribution w/encl

Region II Regional Coordinator, OEDO (J. Cassidy) J. Quichocho, NRR J. Poole, NRR A. Hon, NRR C. Evans, RII L. Douglas, RII EICS S. Shaeffer, RII DRP R. Monk, RII WBN Unit 1 SRI S. Dubose, RII Administrative Assistant Region II State Liaison Officer Region II Public Affairs Officer OE Mail (email address if applicable) ConE_Resource@nrc.gov PUBLIC