Meeting Summary with the Public to Discuss the Annual Assessment of the Watts Bar Nuclear Unit 2 Construction Project
ML13107B494
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 04/17/2013
From: Haag R
NRC/RGN-II/DCP/CPB3
To: Skaggs M
Tennessee Valley Authority
Michelle Adams
References
IR-13-601
Download: ML13107B494 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 April 17, 2013 Mr. Michael D. Skaggs Senior Vice President Nuclear Generation Development and Construction Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT:

PUBLIC MEETING

SUMMARY

- WATTS BAR NUCLEAR PLANT UNIT 2 (NRC INSPECTION REPORT 05000391/2013601)

Dear Mr. Skaggs:

This refers to the meeting conducted at our request at the Comfort Inn Hotel in Athens, TN on April 16, 2013 at 1:00 p.m. The meeting's purpose was to provide opportunities to discuss the annual assessment of the Watts Bar Nuclear Unit 2 Construction Project with the public.

On April 16, 2013, the NRCs Chief of Construction Projects Branch 3, and the Resident Inspectors, held a Category 1 meeting that was attended by members of the public and TVA employees. This Category 1 public meeting provided an informative presentation to engage the public in a discussion of the NRCs annual assessment of the Watts Bar Nuclear Plant Unit 2 construction project for the period from January 1 through December 31, 2012. The list of attendees (Enclosure 1) and the presentation material used for discussions (Enclosure 2) are attached to this letter.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this meeting, please contact James Baptist at 404-997-4506.

Sincerely,

/RA/

Robert Haag, Chief Construction Projects Branch 3 Division of Construction Projects

Enclosures:

1. List of Attendees
2. Handout- 2012 EOC WB2 Presentation_Public

M. Skaggs 2 cc w/encl: Mr. R. R. Baron, Senior Manager Mr. Gordon P. Arent Nuclear Construction Quality Assurance Senior Manager, Licensing WBN Unit Two WBN Unit Two Watts Bar Nuclear Plant Watts Bar Nuclear Plant Tennessee Valley Authority Tennessee Valley Authority P.O. Box 2000 P.O. Box 2000 Spring City, Tennessee 37381 Spring City, Tennessee 37381 Mr. Joseph Shea, Vice President Mr. O. J. Zeringue, General Manager Nuclear Licensing Engineering and Construction Tennessee Valley Authority WBN Unit Two 1101 Market Street Watts Bar Nuclear Plant 3R Lookout Place Tennessee Valley Authority Chattanooga, TN 37402-2801 P.O. Box 2000 Spring City, Tennessee 37381 Mr. E. J. Vigluicci Assistant General Counsel Mr. R. A. Hruby, General Manager Tennessee Valley Authority Technical Services 400 West Summit Hill Drive WBN Unit Two 6A West Tower Watts Bar Nuclear Plant Knoxville, Tennessee 37402 Tennessee Valley Authority P.O. Box 2000 Mr. Lawrence E. Nanney, Director Spring City Tennessee 37381 Tennessee Department of Environmental Health & Conservation Ms. Donna Guinn, Manager Division of Radiological Health Licensing and Industry Affairs 3rd Floor, L&C Annex WBN Nuclear Plant 401 Church Street Tennessee Valley Authority Nashville, TN 37243-1532 P.O. Box 2000 Spring City, Tennessee 37381 Mr. T. P. Cleary Site Vice President Mr. Preston D. Swafford Watts Bar Nuclear Plant Chief Nuclear Officer Tennessee Valley Authority and Executive Vice President P.O. Box 2000 Tennessee Valley Authority Spring City, Tennessee 37381 1101 Market Place 3R Lookout Place County Mayor Chattanooga, Tennessee 37402-2801 P.O. Box 156 Decatur, Tennessee 37322 County Executive 375 Church Street Suite 215 Ms. Ann P. Harris Dayton, Tennessee 37321 341 Swing Loop Rockwood, TN 37854 Mr. Dave Gronek Plant Manager, WBN Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Spring City, Tennessee 37381

M. Skaggs 3 cc email distribution w/encl:

Greg Scott Tennessee Valley Authority Electronic Mail Distribution Watts Bar 2 Licensing Tennessee Valley Authority Electronic Mail Distribution Brenda Derrick Electronic Mail Distribution

ML13107B494_ _____ P SUNSI REVIEW COMPLETE OFFICE RII:DCP RII:DCP RII:DCP RII:DCP RII:DCP RII:DCP RII:DCI SIGNATURE RCH JBB5 NAME RHaag JBaptist DATE 04/17/2013 04/17/2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Letter to Michael D. Skaggs from Robert C. Haag dated April 17, 2013.

SUBJECT:

PUBLIC MEETING

SUMMARY

- WATTS BAR NUCLEAR PLANT UNIT 2 (NRC INSPECTION REPORT 05000391/2013601)

Distribution w/encl:

Region II Regional Coordinator, OEDO (J. Cassidy)

J. Quichocho, NRR J. Poole, NRR A. Hon, NRR C. Evans, RII L. Douglas, RII EICS S. Shaeffer, RII DRP R. Monk, RII WBN Unit 1 SRI S. Dubose, RII Administrative Assistant Region II State Liaison Officer Region II Public Affairs Officer OE Mail (email address if applicable)

ConE_Resource@nrc.gov PUBLIC