ML18149A148

From kanterella
Revision as of 05:40, 17 June 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Forwards Revised App 3 to Emergency Plan & Revs to Emergency Plan Implementing Procedures,Including Rev 16 to EPIP-3.01 Re Callout of Emergency Response Personnel & Rev 3 to EPIP-3.03 Re Activation of Operational Support Ctr
ML18149A148
Person / Time
Site: Surry  Dominion icon.png
Issue date: 05/02/1986
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18130A419 List:
References
86-246, NUDOCS 8605080145
Download: ML18149A148 (1)


Text

. e

  • VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 W. L. STEWABT. VxcB PRESIDENT NucLEAR OPERATIONS Dr. J. Nelson Grace Regional Administrator Region II May 2, 1986 U.S. Nuclear Regulatory Commission Suite 2900 101 Marietta St., N.W. Atlanta, Georgia 30323

Dear Dr. Grace:

These revisions do not decrease the effectiveness of our Emergency Plan, and the plan, as changed, continues to meet the standards of 10 CFR 50.47(b).

Enclosures cc: Document Control Desk (2) Mr. Lester S. Rubenstein, Director -w/o enclosures PWR Project Directorate No. 2 Division of PWR Licensing-A Mr. Chandu P. Patel -w/o enclosures NRC Surry Project Manager PWR Project Directorate No. 2 Division of PWR Licensing-A NRC Senior Resident Inspector

-w/o enclosures Surry Power Station r aoosoeo145 gt8&8~ao ~DR ADOCK PDR \ I . I i