Category:Letter
MONTHYEARULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 IR 05000483/20230042024-01-19019 January 2024 Integrated Inspection Report 05000483/2023004 ML24008A0552024-01-19019 January 2024 Acceptance of Requested Licensing Action - Proposed Alternative to the Requirements of the ASME Code (EPID L-2023-LLR- 0061) ML23353A1712024-01-18018 January 2024 Issuance of Amendment No. 237 to Clarify Support System Requirements for the Residual Heat Removal System and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23317A0012024-01-12012 January 2024 Audit Summary Regarding LAR to Clarify Support System Requirements for the Residual Heat Removal and Control Room Air Conditioning System Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 ML23347A1212024-01-11011 January 2024 Issuance of Amendment No. 236 to Adopt TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Volume Values to Licensee Control EPID L-2023-LLA-0046) ML24011A1492024-01-11011 January 2024 Notification of Post-Approval Site Inspection for License Renewal and Request for Information (05000483/2024011) ULNRC-06847, Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01)2023-12-21021 December 2023 Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01) ULNRC-06849, License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds2023-12-20020 December 2023 License Renewal Resolution for Commitments 34 and 35 Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds ML23346A0392023-12-14014 December 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Request for Relief from Requirements of ASME Code, Section Xl, Examination and Testing Unbonded Post-Tensioning System ULNRC-06844, Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification2023-12-0707 December 2023 Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification 05000483/LER-2023-001, Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications2023-11-29029 November 2023 Submittal of LER 2023-001-00 for Callaway, Unit 1, Inoperable Instrument Tunnel Sump Level Indication Resulted in Condition Prohibited by Technical Specifications ULNRC-06827, Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029)2023-11-20020 November 2023 Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029) IR 05000483/20230102023-11-15015 November 2023 NRC License Renewal Phase 1 Inspection Report 05000483 2023010 IR 05000483/20233012023-11-0909 November 2023 NRC Examination Report 05000483-2023301 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23297A2502023-11-0606 November 2023 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination and Opportunity for a Hearing (EPID L-2022-LLA-0176) - Letter IR 05000483/20240122023-10-24024 October 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection (05000483/2024012) ML23293A2652023-10-24024 October 2023 3rd Quarter 2023 Integrated Inspection Report ML23240A3692023-10-0505 October 2023 Issuance of Amendment No. 235 to Revise Technical Specifications to Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150) (Non-Proprietary) ML23234A1522023-10-0505 October 2023 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2022-LLE-0030) (Letter) ML23305A0942023-10-0202 October 2023 10-CW-2023-09 Post-Exam Submittal ML23270B9662023-09-27027 September 2023 10 CFR 50.55a(z)(I) Request for Relief from ASME OM Code Pump and Valve Testing Requirements for Fifth 120-Month Inservice Testing Interval ML23228A0252023-09-25025 September 2023 Issuance of Amendment No. 234 to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies ML23261C3852023-09-25025 September 2023 Safety Evaluation for Operating Quality Assurance Manual Revision 36A ML23166B0882023-09-20020 September 2023 Issuance of Amendment No. 233 for Adoption of Alternative Source Term and Revision of Technical Specifications ML23206A1992023-09-15015 September 2023 Regulatory Audit Summary Regarding License Amendment and Regulatory Exemptions Request for Fuel Transition to Framatome Gaia Fuel (Epids L-2022-LLA-0150 and L-2022-LLE-0030) IR 05000483/20234012023-09-13013 September 2023 NRC Security Baseline Inspection Report 05000483/2023401 ML23240A7572023-08-31031 August 2023 NRC Initial Operator Licensing Examination Approval 05000483/2023301 IR 05000483/20230052023-08-23023 August 2023 Updated Inspection Plan for Callaway Nuclear Power Plant, Unit 1 (Report 05000483/2023005) - Mid Cycle Letter 2023 ULNRC-06824, Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A2023-08-17017 August 2023 Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A ML23219A1392023-08-15015 August 2023 Request for Withholding Information from Public Disclosure ULNRC-06830, Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak2023-08-15015 August 2023 Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak ML23215A1972023-08-0303 August 2023 Supplement to License Amendment and Exemption Request Regarding Use of Framatome Gaia Fuel (LDCN 22-0002) ULNRC-06223, Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004)2023-07-25025 July 2023 Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004) ULNRC-06799, Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications2023-07-13013 July 2023 Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications IR 05000483/20230022023-07-10010 July 2023 Integrated Inspection Report 05000483/2023002 ML23174A1272023-06-23023 June 2023 Cw FFD Document Request List 2023 ML23171A9942023-06-22022 June 2023 Acceptance of Request for Approval of Operating Quality Assurance Manual Revision 36a ULNRC-06821, Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301)2023-06-21021 June 2023 Post-Audit Follow-Up Information in Support of Callaway'S License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301) IR 05000483/20230112023-06-15015 June 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000483/2023011 ULNRC-06822, Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a2023-06-14014 June 2023 Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a ML23158A1462023-06-13013 June 2023 Notification of Post-Approval Site Inspection for License Renewal and Request for Information Inspection (05000483/2023010) ULNRC-06815, Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a2023-06-0505 June 2023 Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a ULNRC-06818, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate .2023-06-0505 June 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate . ML23093A0952023-05-10010 May 2023 Issuance of Amendment No. 232 Regarding Technical Specification Changes for Spent Fuel Storage ULNRC-06816, Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015)2023-05-0909 May 2023 Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015) ML23129A7942023-05-0909 May 2023 Post-Audit Supplement to License Amendment Request and Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (Iepid L-2022-LLA-0150 and EPID L-2022-LLE-0030) ML23122A3172023-05-0808 May 2023 Review of the Spring 2022 Steam Generator Tube Inservice Inspections ML23118A3492023-05-0808 May 2023 Request for Withholding Information from Public Disclosure 2024-01-29
[Table view] Category:Emergency Preparedness-Emergency Plan Implementing Procedures
MONTHYEARML23354A1062023-12-20020 December 2023 Ameren Missouri - Procedure Review Form for EIP-ZZ-COO1O Addendum G, Rev. 11, Backup EOF Checklist ML23310A0522023-10-19019 October 2023 Procedure Review Form for EIP-ZZ.OO1O1, Addendum 2, Revision 22, Emergency Action Level Technical Bases Document ML23262B0052023-08-29029 August 2023 EIP-ZZ-A0066, Rev. 29 - RERP Training Program ML24002A8192023-07-25025 July 2023 EtP-ZZ-COO10 Add D, Rev 22, Dose Assessment Coordinator (DAC) Checklist ML23227A1382023-07-12012 July 2023 Procedure Review Form for EIP-ZZ-03010 App B: Above Ground Oil Storage and Use Facilities (Revision 008) ML23227A1392023-06-0909 June 2023 EIP-ZZ-A0001, Rev 23, Emergency Response Organization ML23200A2132023-06-0101 June 2023 Procedure Review Form for EIP-ZZ-00201, Addendum a, Rev. 41, Control Room Notification Flowchart ML23150A1802023-05-30030 May 2023 EIP-ZZ-00201 Addendum a, Control Room Notification Flowchart Administrative Correction Revision 040 ML23150A1862023-05-30030 May 2023 EIP-ZZ-00240 Addendum H, Revision 008, Security Coordinator Checklist Administrative Correction ML23150A1812023-05-18018 May 2023 EIP-ZZ-00201 Addendum a, Revision 040, Control Room Notification Flowchart ML23131A3882023-04-26026 April 2023 EIP-ZZ-PRO2O Minor Revision 54, Activation and Operation of the Joint Information Center - Procedure Review Form and 50.54(q) Screening Form ML23131A3812023-04-26026 April 2023 EIP-ZZ-00240 Addendum E. Health Physics Coordinator (Hpc) Checklist, Minor Revision 26 ML23131A3842023-04-26026 April 2023 EIP-ZZ-COO1O, Addendum D, Dose Assessment Coordinator (DAC) Checklist, Minor Revision 21 ML23131A3872023-04-26026 April 2023 EIP-ZZ-PRO2O Minor Revision 54, Activation and Operation of the Joint Information Center ML23088A2862023-03-23023 March 2023 EIP-ZZ-00201, Addendum C, Revision 039, EOF Notification Package ML23102A1932023-03-0808 March 2023 Procedure Review Form (Prf), Summary of Changes and Analysis to Revision 55 ML19051A1412019-02-20020 February 2019 Attachment 5: EAL Matrix from EIP-ZZ-00101 Addendum 1, Emergency Action Level Classification Matrix, Proposed Revision 009 ML19051A1402019-02-20020 February 2019 Attachment 4: Affected Pages ofEIP-ZZ-00101 Addendum 2, Emergency Action Level Technical Bases Document, Proposed Revision 016 ML19051A1392019-02-20020 February 2019 Attachment 3: Mark-ups of Callaway EAL Technical Bases Document Affected Pages ULNRC-06467, Submittal of Radiological Emergency Response Plan Appendix J, On-Shift Staffing Analysis Report, Revision 0042018-10-31031 October 2018 Submittal of Radiological Emergency Response Plan Appendix J, On-Shift Staffing Analysis Report, Revision 004 ULNRC-06424, Callaway, EIP-ZZ-00 101 Addendum 1, Emergency Action Level Matrix, Revision 008; Summary of Changes2018-03-29029 March 2018 Callaway, EIP-ZZ-00 101 Addendum 1, Emergency Action Level Matrix, Revision 008; Summary of Changes ULNRC-06424, Callaway, FIP-ZZ-00101 Addendum 1, Emergency Action Level Matrix, Revision 0082018-03-29029 March 2018 Callaway, FIP-ZZ-00101 Addendum 1, Emergency Action Level Matrix, Revision 008 ML18088B3592018-03-29029 March 2018 EIP-ZZ-00 101 Addendum 1, Emergency Action Level Matrix, Revision 008; Summary of Changes ML18088B3602018-03-29029 March 2018 FIP-ZZ-00101 Addendum 1, Emergency Action Level Matrix, Revision 008 ML18088B3612018-03-29029 March 2018 EIP-ZZ-00101 Addendum 2, Emergency Action Level Technical Basis Document, Revision 008 ULNRC-06405, Submittal of Radiological Emergency Response Plan, Revision 502018-01-0202 January 2018 Submittal of Radiological Emergency Response Plan, Revision 50 ULNRC-05922, Emergency Preparedness Communications Assessment Results Requested by NRC Ltr, Request for Information Pursuant to Title 10 of the Code Federal Regulations 50.54(f).2012-10-30030 October 2012 Emergency Preparedness Communications Assessment Results Requested by NRC Ltr, Request for Information Pursuant to Title 10 of the Code Federal Regulations 50.54(f). ML0411403362004-04-17017 April 2004 EIP-ZZ-A0066, RERP Training Program, Revision 008 ML0410407332004-04-0808 April 2004 Transmittal of Revision 39 of Emergency Plan Implementing Procedure EIP-ZZ-00201, Notifications ML0407601082004-03-0505 March 2004 Revised Epips, Including Rev. 21 to EIP-ZZ-00213 and Rev. 9 to EIP-ZZ-00226 ML0405804812004-02-23023 February 2004 Revision 22 to EIP-ZZ-A0020, Maintaining Emergency Preparedness. ML0403407022004-01-23023 January 2004 Revision 30 to EIP-ZZ-C0010, Revision 32 to EIP-ZZ-00102, and Revision 33 to EIP-ZZ-00240 ML0402107922004-01-15015 January 2004 Revision 22 to Procedure EIP-ZZ-00211, Field Monitoring. ML0336404862003-12-19019 December 2003 Emergency Plan Implementing Procedure EIP-ZZ-A0066, RERP Training Program, Revision 007 ML0335105492003-12-11011 December 2003 Emergency Plan Implementing Procedure EIP-ZZ-A0001 Emergency Response Organization, Revision 8 ML0335105532003-12-10010 December 2003 Revision 123 to EIP-ZZ-A0001, Appendix 1 ML0334905662003-12-0808 December 2003 Revision 0387 to EIP-ZZ-00201, Notifications, and Revision 013 to EIP-ZZ-00260, Event Closeout/Plant Recovery. ML0333700622003-11-25025 November 2003 Revision 016 to EIP-ZZ-00231, Response to Severe Thunderstorm/High Winds/Tornado Watches and Warnings ML0331600392003-11-0303 November 2003 Transmittal of Revisions to Emergency Plan Implementing Procedures for Callaway Plant ML0330001062003-10-17017 October 2003 Transmittal of Emergency Plan Implementing Procedure EIP-ZZ-A0066, Rev. 6 ML0328804452003-10-0303 October 2003 Transmittal of Emergency Plan Implementing Procedure EIP-ZZ-03010, Rev 103 ML0323406572003-08-15015 August 2003 Transmittal of Emergency Plan Implementing Procedure EIP-ZZ-PR020, Revision 19 ML0323103442003-08-13013 August 2003 Revision 083 to EIP-ZZ-A0001 App 1 ML0320604792003-07-18018 July 2003 Transmittal of Emergency Plan Implementing Procedure, EIP-ZZ-A0020 ML0318201592003-06-20020 June 2003 Transmittal of Callaway Emergency Plan Implementing Procedure, EIP-ZZ-00226 ML0316401482003-06-0606 June 2003 Transmittal of Emergency Plan Implementing Procedure Revision ML0316308662003-06-0606 June 2003 Emergency Plan Implementing Procedures ML0314805162003-05-20020 May 2003 Emergency Plan Implementing Procedure EIP-ZZ-A0001 Appendix 1, Revision 053 ML0312705212003-04-28028 April 2003 Emergency Plan Implementing Procedure EIP-ZZ-A0001, Revision 006 ML0312705132003-04-28028 April 2003 Emergency Plan Implementing Procedure, EIP-ZZ-A0001, Revision 006 2023-08-29
[Table view] |