ML18153B698

From kanterella
Revision as of 09:05, 23 January 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 0 to Motor-Operated Valve Action Plan & Implementation Schedule,Per 890404 Telcon W/C Julian
ML18153B698
Person / Time
Site: Surry  Dominion icon.png
Issue date: 04/19/1989
From: CARTWRIGHT W R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18152A524 List:
References
89-275, NUDOCS 8904270057
Download: ML18153B698 (3)


Text

W, R.CARTWRIGHT VICE PRESID.E?.*T NUCLEAR e e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 April 19, 1989 Serial No.89-275 United States Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D. C. 20555 NO/ETS Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 MOTOR OPERATED VALVE ACTION PLAN Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 On April 4, 1989, a telephone conference call was held with Mr. C. Julian of the Region II staff and Mr. M. Kansler of my staff, to discuss the status of the Motor Operated Valve (MOY) repair activities.

We committed to provide. a written description of the MOY Action Plan that will be implemented for the safety-related valves identified in the Plan, prior to the restart of Units 1 and 2. In addition, we are providing a Table of Contents for the draft MOY Program and its current implementation schedule.

This comprehensive MOY Program was developed from industry, INPO, and NRC experience and guidance and will maintain MOYs in optimum *condition.

The MOY Action Plan is provided in Attachment

1. The Table of Contents and its current implementation schedule for the program are provided in* Attachment
2.
  • If you have any further questions, please call W. R. Cartwright Attachments

~904270057 890419 fDR ADOCK 05000280 p F'DC I ! cc: U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W. Suite 2900 Atlanta, Georgia 30323 Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station ATTACHMENT 1 SURRY POWER STATION UNITS 1 AND 2 MOV ACTION PLAN