ML18136A067

From kanterella
Revision as of 01:25, 20 January 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Sept 1979
ML18136A067
Person / Time
Site: Surry  Dominion icon.png
Issue date: 10/16/1979
From: STALLINGS C M
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: HARTFIELD R A
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML18136A068 List:
References
NUDOCS 7910190386
Download: ML18136A067 (1)


Text

  • ELECTRIC AND POWER COMPANY RrcHMoND, V:cuor.N .tA 23261 October 16, 1979 Mr. R. A. Hartfield, Acting Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Hartfield:

Serial No. 838 PO/RMT:baw Docket No. 50-280 50-281 License No. DPR-32 DPR-37 Enclosed is the Monthly Operating Report for Surry Power Station Unit Nos. 1 and 2 for the month of September, 1979. Very truly yours, [v cUl,.1 L C. M.

Vice President-Power Supply and Production Operations Enclosure (3 copies) cc: Mr. Victor Stello, Director (10 copies) Office of Inspection and Enforcement Mr. James P. O'Reilly, Director (1 copy) Office of Inspection and Enforcement

-Region II