ML20117P102

From kanterella
Revision as of 18:48, 14 May 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 2 to Procedure COP-1050, Post-Accident Estimation of Fuel Core Damage, Completing Util Response to Criteria 2 of SER Confirmatory Item 50 Re NUREG-0737, Item II.B.3
ML20117P102
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/13/1985
From: Booker J
GULF STATES UTILITIES CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20117P105 List:
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.B.3, TASK-TM RBG-20968, NUDOCS 8505200398
Download: ML20117P102 (1)


Text

y. _ -

,.x A GULF STATES UTELITIES ^ COMPANY RIVER BEND STATION POST OFHCE BOX 220 - ST. FRANCISVILLE. LOUISIANA 70775 AREA CODE SO4 - 635-6094 346-8661 May 13, 1985 RBG-20968 File Nos. G9.5, G9.19.2, 234.600 Mr.' Harold R. Denton, Director Office of Nuclear Reactor Regulation ^

U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Denton:

River Bend Station - Unit 1 Docket No. 50-458' he enclosed information suppleme'nts-Gulf States Utilities Company's (GSU) January 2,.1985 submittal to your-office concerning Safety Evaluation Report f(SER)' Confirmatory Item No. (50). Specifically, Criteria-2 and 10 regarding the NUREG-0737 'DfI Action Plan Item II.B.3 required further clarification from the Nuclecr Regulatory Commission's Chemical Engineering Branch (CHEB) : reviewer, -Mr. Paul Wu.

L Enclosed is a revised River Bend Stetion (RBS) degraded core damage estimation' procedure (COP-1050) which is based on the BWR Owners Group Generic Core Damage Estimation Procedure' (General Electric' Company NEDO-22215,

" Procedures for the Letermination of the Extent of _ Core Damage Under Accident Conditions"). This is consistent with Licensing Review Group -II issue 3-CHEB and completes GSU's response'to Critorion 2.

The post accident sampling system'-(PASS) operators will be provided with-refresher training-annually in post-accident sampling, analysis and transport. This completes GSU's response to Criteria 10.

Sincerely, I

h J.Manager-Engineering, E. Booker Nuclear Fuels G Licensing River Bend Nuclear Group

Enclosure h00 0

hhhh[)l58 PDR

' -