Withdraws 860516 Request for Exemption from 10CFR50,App R Requirements Re Postulated Occurrence of Fire in Unit 2 East Cableway,Per 861106 & 12 Telcons.Exemption Still Necessary for Both Reactor Bldgs (Fire Areas 1205 & 2205)
ML20214D818
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 11/14/1986
From: Gucwa L
GEORGIA POWER CO.
To: Muller D
Office of Nuclear Reactor Regulation
References
SL-1582, TAC-61626, TAC-61627, NUDOCS 8611240264
Download: ML20214D818 (2)


Text

,. __________________________ - _____________________ ____ _ _ _ _ _ _ _ _ _ _ _

Georgia Powsr Cornpany 333 Piedmont Avenue Atlanta, Georgia 30308 Te:ephone 404 5264526 Mailing Address:

Fbst Off ce Box 4545 Atfanta, Georgia 30302 GeorgiaPbwer L T. Gucws :ne sournern ekttnc system Manager Nuclear Safety and Licensing 0914C November 14, 1986 Director of Nuclear Reactor Regulation Attention: Mr. D. Muller, Project Director BWR Project Directorate No. 2 Division of Boiling Water Reactor Licensing U.S. Nuclear Regulatory Commission Washington, D.C. 20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1 AND 2 APPENDIX R EXEMPTION REQUEST RELATIVE TO SPURIOUS OPERATION OF HPCI SYSTEM Gentlemen:

On November 6,1986, and November 12, 1986, conference calls were held between Mr. G. R. Rivenbark, et al of the NRC and Mr. J. D. Heidt, et al of Georgia Power Company (GPC). The purpose of the calls was to discuss the status of the Appendix R exemption request for Plant Hatch relative to the spurious operation of the Unit 1 and Unit 2 HPCI systems due to the postulated occurrence of a fire in either Reactor Building or in the Unit 2 East Cableway. (Reference Section 1.5 of GPC's letter to the NRC dated May 16, 1986.)

Based upon the above-mentioned discussions, GPC agreed to withdraw the May 16, 1986 Appendix R exemption request regarding the postulated occurrence of a fire in the Unit 2 East Cableway. However_, as discussed and agreed in the conference calls, the exemption is still necessary for the Unit 1 and Unit 2 Reactor Buildings (fire areas 1205 and 2205).

If you have questions or concerns regarding this matter, please contact this office at any time.

Sincerely, Yb "

/4 L. T. Gucwa i gob 8611240264 861114 I

[D PDR ADOCK 05000321 I F PDR

6 ,(

Georgia Power d l

Director of Nuclear Reactor Regulation Attention: Mr. D. Muller, Project Director BWR Project Directorate No. 2 November 14, 1986 Page Two c: Georcia Power Company U.S. Nuclear Regulatory Commission Mr. i. P. O'Reilly Dr. J. N. Grace, Regional Administrator Mr. J. T. Beckham, Jr. Mr. P. Holmes-Ray, Senior Resident Mr. H. C. Nix, Jr. Inspector-Hatch GO-NORMS i