IR 05000269/1985028

From kanterella
Revision as of 09:26, 27 June 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Insp Repts 50-269/85-28,50-270/85-28 & 50-287/85-28 on 850903-06.Violation Noted:Inadequate Procedure for Documentation of Vital Area Barrier Insp.Details Withheld (Ref 10CFR2.790(d) & 73.21)
ML20141A019
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 10/02/1985
From: Masnyk O, Mcguire D, Perny C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20141A015 List:
References
50-269-85-28, 50-270-85-28, 50-287-85-28, NUDOCS 8510240392
Download: ML20141A019 (1)


Text

UNITED STATES

[p 40 o NUCLEAR REGULATORY COMMISSION

[ j)7Ij g REGION 11 3 101 MARIETTA STREET. * E ATLANTA, GEORGI A 30323

\...../

Report Nos. 50-269/85-28, 50-270/85-28, and 50-287/85-28 Licensee: Duke Power Company 422 Church Street Charlotte, NC 28242 Docket Nos. 50-269, 270, and 287 License Nos. DPR-38, 47, and 55 Facility Name: Oconee Nuclear Station Inspection Date: Septpaber 3-6, 1985 Inspecto , 45 ff C. D. Perny,' Physical Security Inspector Date Signed huwMhwL 0. M. Masnyk, Physical Lecurity Specialist lo-oz-ss Date Sig ed Approved by: u _h /C /[

D. R. McGuire, Chief, Physical Security Section Date Tigned Nuclear Materials Safety and Safeguards Branch Division of Radiation Safety and Safeguards SUMMAy Scopo This routine, unannounced inspection involved 64 inspector-hours on site (6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> backshift) by two inspectors inspecting Security Plan and Implementing Procedures; Security Organization; Securi_ty Program Audits, Records and Reports; Physical Barriers- Protected Area; Physical Barriers -

Vital Area; Security System Power Supply; Lighting; Assessment Aids; Detection Aids - Protected and Vital Areas; Alarm Stations and Communication Results: Three violations were identified: inadequate procedure for documentation of vital area barrier inspection (85-28-01); failure to meet the alarm annunciation requirement in the Physical Security Plan (85-28-02); and breach of a vital area barrier (85-28-03). One unrcsolved item was identified in the area of physical barriers protected area (85-28-04).

!?ni*":My g y ENCLOSURE CON

" "'" " * " " * " * *

SAFEGUARDS INFORMADQh. " I

. . _ _ _ _ _ _ _ . _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ . _ . . _ _ . . _ . . _ _ _ _ _ . _ _ _ . . _ _ _ _ _ _ . . _ _ _ _ . _ . _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ . . . _ _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ _ _