Insp Repts 50-260/85-24,50-270/85-24 & 50-287/85-24 on 850812-16.No Violations or Deviations Noted.Major Areas Inspected:Onsite & Offsite Emergency Preparedness
ML20135F492
Person / Time
Site: Browns Ferry, Oconee  Duke energy icon.png
Issue date: 08/29/1985
From: Cline W, Kreh J, Krreh J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20135F475 List:
References
50-269-85-24, 50-270-85-24, 50-287-85-24, NUDOCS 8509170287
Download: ML20135F492 (5)


Text

(. .

50 Cteg ' UNITED STATES

, 'o NUCLEAR REGULATORY COMMISSION

^

[ p REGloN li g j 101 MARIETTA STREET, * 2 ATLANTA, GEORGI A 30323

% ..... / AUS 3 0 $85 Report Nos.: 50-269/85-24, 50-270/85-24, and 50-287/85-24 Licensee: Duke Power Company 422 South Church Street Charlotte, NC 28242 Docket Nos.: 50-269, 50-270, and 50-287 License Nos.: DPR-38, DPR-47, and DPR-55 Facility Name: Oconee Nuclear Station Inspection Condycted: August 12-16, 1985 Inspector: ,

e

,

y n

[ 7h M I Date Signed Approved by: '[r e

-

W. E. Cline, Chief Date Signed Emergency Preparedness Section Division of Radiation Safety and Safeguards SUMMARY Scope: This routine, unannounced inspection entailed 32 inspector-hours onsite and two inspector-hours offsite in the area of emergency preparednes Results: No violations or ' deviations were identifie s I

8509170287 85083029 PDR ADOCK O G

.-

r

'

.

REPORT DETAILS Persons Contacted Licensee Employees M. S. Tuckman, Station Manager

  • H. R. Lowery, Acting Station Manager
  • C. C. Jennings, Station Emergency Planner
  • R. T. Bond, Compliance Engineer
  • T. C. Matthews, Compliance Technical Specialist E. G. LeGette, Shift Supervisor G. B. Jones, Shift Supervisor Other licensee employees contacted included technicians and office personne Other Organizations W. B. Purcell, Director, Oconee County (SC) Emergency Preparedness Agency R. L. Miles, M. D., Director, Department of Radiology, Oconee Memorial Hospital, Seneca, SC J. R. Pruitt, M.D., Director of Laboratories, Oconee Memorial Hospital NRC
  • J. C. Bryant, Senior Resident Inspector L. P. King, Resident Inspector
  • Attended exit interview Exit Interview (30703)

The inspection scope and findings were summarized on August 16, 1985, with those persons indicated in paragraph 1 above. The inspector described the areas inspected and discussed in detail the inspection finding The licensee did not identify as proprietary any of the materials provided to or reviewed by the inspector during this inspectio . Changes to the Emergency Preparedness Program (82204)

Pursuant to 10 - CFR 50.47(b)(16), 10 CFR 50.54(q), and 10 CFR Part 50, Appendix E, Sections IV and V, this area was reviewed to determine whether changes were nade to the program since the last routine inspection (August 1984) aad to note how any such changes affected the overall state of -

emergency preparednes ,

,

'

.

The inspector discussed the licensee's program for making changes to the Emergency Plan (EP) and Empergency Plan Implementing Procedures (EPIPs).

The inspector reviewed the licensee's system (described in EP Section P) for review and approval of changes to the plan and procedures. The inspector verified that changes to the plan and procedures were reviewed and approved by management. It was also noted that all such changes were submitted to NRC within 30 days of the effective date, as require Discussions were held with licensee representatives concerning recent modifications to facilities, equipment, and instrumentation. The inspector was informed that, except for some rearrangement of telephones within the Technical Support Center (TSC) and the Operational Support Center, no such modifications had been mad The organization and management of the emergency preparedness program were reviewed. The inspector verified that there had been no significant changes in the organization or assignment of responsibility for the plant and corporate emergency planning staffs since the last inspectio The inspector's discussions with licensee representatives also disclosed that there had been no significant changes in the organization and staffing of the offsite support agencies since the last inspectio The inspector reviewed the licensee's program for distribution of changes to the EP and the EPIPs. Document control records for the period August 1984 to July 1985 showed that appropriate personnel and organizations were sent copies of plan and procedural changes, as require No violations or deviations were identified in this program are . Knowledge and Performance of Duties (Training) (82206)

Pursuant to 10 CFR 50.47(b)(15) and 10 CFR Part 50, Appendix E, Section IV.F, this area was inspected to determine whether emergency response personnel understood their emergency response roles and could perform their assigned function The inspector reviewed the description (in EP Section 0) of the training program, training procedures, and selected lesson plans, and interviewed members of the instructional staff. Based on these reviews and interviews, l the inspector determined that the licensee had established a formal emergency training progra Records of training for key members of the emergency organization for the period April 1984 to May 1985 were reviewed. The training records revealed that personnel designated as alternates or given interim responsibilities in the emergency organization were provided with appropriate training.

i According to the training records, the type, amount, and frequency of

'

training were consistent with approved procedure The inspector conducted walk-through evaluations with 2 Shift Supervisor During these walk-throughs, individuals were given various hypothetical sets L

r

'

. .

of emergency conditions and data and asked to respond as if an emergency actually existed. The individuals demonstrated familiarity with emergency procedures and equipment, and no problems were observed in the areas of emergency detection / classification and protective action decision-makin The inspector determined that neither the EP nor the EPIPs (nor any other licensee document, for that matter) specified who would serve as interim Emergency Coordinator in the event the Shift Supervisor was incapacitated or otherwise unavailable during an emergency condition. Acknowledging this to be the case, licensee representatives stated that the Senior Reactor Operator (SRO) with highest seniority would assume command, and that Control Room personnel were cognizant of this unwritten line of succession. The Senior Resident Inspector verified the existence of this understanding through interviews with Control Room personnel on one shift. Nevertheless, licensee management representatives agreed to consider written delineation of the line of succession for the Shift Supervisor positio Inspector Follow-up Item (269, 270, 287/85-24-01): Formal specification of the line of succession for Shift Superviso No violations or deviations were identified in this program are . Licensee Audits (82210)

Pursuant to 10 CFR 50.47(b)(14) and (16) and 10 CFR 50.54(t), this area was inspected to determine whether the licensee had performed an independent review or audit of the emergency preparedness progra Records of audits of the program were reviewed. The records showed that an independent audit of the program was conducted by the licensee's Quality Assurance Department on December 10, 1984, to January 1, 1985, and documented in Audit Report No. NP-84-23(CM). This audit fulfilled the 12-month frequency requirement for such audits. The audit records showed that the State and local government interfaces were evaluated, and that findings concerning the interfaces were made available to State and local government authorities. Audit findings and recommendations were presented to plant and corporate managemen Licensee emergency plans and procedures required critiques following exercises and drills. Licensee documentation showed that critiques were held following periodic drills as well as the annual exercise. The records showed that deficiencies were discussed in the critiques, and recommen-

, dations for corrective action were made.

!

The licensee's program for follow-up action on audit, drill, and exercise findings was reviewed. Licensee procedures required follow-up on deficient areas identified during audits, drills, and exercise The inspector reviewed licensee records which indicated that corrective action was taken on identified problems, as appropriat The licensee had established a

,

tracking system called the Integrated Commitment Index as a management tool l in following up on actions taken in deficient areas.

l l

t

r I

. . * *

5

!

,

No violations or deviations were identified in this program are . Coordination with Offsite Agencies (82210)

The inspector held discussions with licensee representatives regarding the coordination of emergency planning with offsite agencie Written agreements existed with those offsite support agencies specified in the EP, and the. agreements had been renewed within the past two years, as require The inspector determined through interviews with representatives of selected local and State support agencies that the licensee was periodically contacting those agencies for purposes of offering training and maintaining mutual familiarization with emergency response role Those interviews disclosed no significant problems related to the interfaces between the ,

licensee and the offsite support agencies listed in paragraph . Inspector Follow-up-(92701)

(Closed) Inspector Follow-up Item (IFI) 269, 270, 287/85-15-02: Inadequate -

plume . monitoring during annual exercise. Exercise documentation. indicated ,

that the plume centerline and dimensions were accurately located and defined  !

by the field monitoring team ;

,