Category:INSPECTION REPORT
MONTHYEARIR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000269/19930181993-06-13013 June 1993 Insp Repts 50-269/93-18,50-270/93-18 & 50-287/93-18 on 930614-17.No Violations Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise IR 05000269/19930101993-04-16016 April 1993 Insp Repts 50-269/93-10,50-270/93-10 & 50-287/93-10 on 930315-19.No Violations or Deviations Noted.Major Areas Inspected:Radiological Effluents,Process & Effluent Radiation Monitoring Instrumentation & Water Chemistry IR 05000269/19930061993-03-22022 March 1993 Partially Withheld Insp Repts 50-269/93-06,50-270/93-06 & 50-287/93-06 on 930222-25 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Licensee Physical Security Program for Power Reactors ML20034E9571993-02-19019 February 1993 Insp Repts 50-269/93-03,50-270/93-03 & 50-287/93-03 on 930103-30.Violations Noted.Major Areas Inspected:Plant Operations,Surveillance Testing,Maint Activities,Keowee Issues & Insp of Open Items IR 05000269/19930011993-02-0101 February 1993 Safeguards Insp Repts 50-269/93-01,50-270/93-01 & 50-287/93-01 on 930104-07.No Violations Noted.Major Areas Inspected:Physical Security Program.Details Withheld (Ref 10CFR73.21) IR 05000269/19920251992-12-0303 December 1992 Insp Repts 50-269/92-25,50-270/92-25 & 50-287/92-25 on 921102-06.No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program for Power Reactors, Audits,Protected & Vital Area Barriers.Details Withheld IR 05000269/19910081991-04-10010 April 1991 Insp Repts 50-269/91-08,50-270/91-08 & 50-287/91-08 on 910312-15.violations Noted.Major Areas Inspected:Maint, Control Room Operation,Planning & Scheduling Activities, Training & Procedures,Plant Physical Condition & Mgmt IR 05000269/19900321990-11-0505 November 1990 Partially Withheld Insp Repts 50-269/90-32,50-270/90-32 & 50-287/90-32 on 901015-19.No Violations Noted.Major Areas Inspected:Physical Security Program Plans,Mgt Support, Security Program Plans & Protected & Vital Area Barriers IR 05000269/19900221990-07-24024 July 1990 Partially Withheld Safeguard Insp Repts 50-269/90-22, 5-270/90-22 & 50-287/90-22 on 900625-29.No Violations or Deviation Noted.Major Areas Inspected:Core Insp Program for Power Reactors & Safeguards Contingency Plan Implementation IR 05000269/19900181990-06-21021 June 1990 Partially Withheld Insp Repts 50-269/90-18,50-270/90-18 & 50-287/90-18 on 900604-08 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Security Program Audit,Detection & Assessment Aids & Key Control IR 05000269/19900061990-03-19019 March 1990 Partially Withheld Insp Repts 50-269/90-06 & 50-270/90-06 & 50-287/90-06 on 900212-16 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors,Specifically Mgt & Barriers IR 05000269/19890391990-02-22022 February 1990 Insp Repts 50-269/89-39,50-270/89-39 & 50-287/89-39 on 891212-15 & 18-20.No Violations or Deviations Noted.Major Areas inspected:post-refueling Startup Tests of Unit 3 & Core Performance Surveillances on Units 1 & 2 IR 05000269/19890321989-11-20020 November 1989 Partially Withheld Insp Repts 50-269/89-32,50-270/89-32 & 50-287/89-32 on 891002-04 (Ref 10CFR2.790 & 73.21).Major Areas Inspected:Physical Security Program for Power Reactors IR 05000269/19890331989-11-15015 November 1989 Insp Repts 50-269/89-33,50-270/89-33 & 50-287/89-33 on 890930.No Violations or Deviations Noted.Major Areas Inspected:Physical Protection of Shipment of Irradiated Reactor Fuel IR 05000269/19890301989-11-0707 November 1989 Partially Withheld Insp Repts 50-269/89-30,50-270/89-30 & 50-287/89-30 on 890918-22 (Ref 10CFR2.790 & 73.21).One non- Cited Violation Noted.Major Areas Inspected:Physical Security Program for Power Reactors & Mgt Effectiveness IR 05000269/19890201989-07-25025 July 1989 Partially Withheld Insp Repts 50-269/89-20,50-270/89-20 & 50-287/89-20 on 890626-30 (Ref 10CFR2.790.(d) & 73.21). Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors & Security Audit IR 05000269/19890101989-05-19019 May 1989 Partially Withheld Insp Repts 50-269/89-10,50-270/89-10 & 50-287/89-10 on 890410-14 (Ref 10CFR2.790 & 73.21). Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plans & Audits & Protected & Vital Area Barriers IR 05000269/19890091989-04-10010 April 1989 Insp Repts 50-269/89-09,50-270/89-09 & 50-287/89-09 on 890306-10.No Violations Noted.Weaknesses Noted Re Data Base Used to Prepare computer-generated Work Requests.Major Areas Inspected:Design Control,Mods & Open Items IR 05000269/19890071989-03-10010 March 1989 Insp Repts 50-269/89-07,50-270/89-07 & 50-287/89-07 on 890213-17.Deviation Noted.Major Areas Inspected:Conformance to Reg Guide 1.97 Re Instrumentation for light-water-cooled Plants to Assess Conditions During & Following Accident IR 05000269/19880051988-03-21021 March 1988 Insp Repts 50-269/88-05,50-270/88-05 & 50-287/88-05 on 880217-0316.No Violations Noted.Major Areas Inspected:Maint, Operations,Surveillance,Physical Security & Design Changes IR 05000269/19870091987-03-17017 March 1987 Insp Repts 50-269/87-09,50-270/87-09 & 50-287/87-09 on 870209-13.No Violations Noted.Major Areas Inspected:Onsite Review of Liquid & Gaseous Radwaste Programs & Review of TMI Action Items II.B.3 & II.F.1.2 IR 05000269/19870101987-03-17017 March 1987 Insp Repts 50-269/87-10,50-270/87-10 & 50-287/87-10 on 870210-0309.No Violations or Deviations Noted.Major Areas Inspected:Areas of Operations,Surveillance,Maint,Followup of Events & Verification of ESF Lineups IR 05000269/19870061987-03-0909 March 1987 Insp Repts 50-269/87-06,50-270/87-06 & 50-287/87-06 on 870126-30.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp,Ongoing Repairs in Reactor Coolant Pumps & Maint & Welding Activities IR 05000269/19870041987-02-17017 February 1987 Insp Repts 50-269/87-04,50-270/87-04 & 50-287/87-04 on 870113-0209.No Violation or Deviation Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Linups,Followup of Events & Shutdown Work in Progress IR 05000269/19870021987-02-11011 February 1987 Partially Withheld Insp Repts 50-269/87-02,50-270/87-02 & 50-287/87-02 on 870126-30 (Ref 10CFR2.790).Violation Noted Re Inadequate App R Circuit Analysis IR 05000269/19870031987-02-10010 February 1987 Insp Repts 50-269/87-03,50-270/87-03 & 50-287/87-03 on 870112-16.Violation Noted:Failure to Adequately Evaluate Radiological Hazards IR 05000269/19860341987-02-0505 February 1987 Corrected Insp Repts 50-269/86-34,50-270/86-34 & 50-287/86-34 on 861111-870112.Insp Erroneously Reported as Having Been Conducted on 861111-0112 IR 05000269/19870071987-02-0505 February 1987 Enforcement Conference Repts 50-269/87-07,50-270/87-07 & 50-287/87-07 on 861222.Major Areas Discussed:Sequence of Events & Corrective Actions Re Emergency Condenser Circulating Water Sys Degradation IR 05000269/19870081987-02-0505 February 1987 Enforcement Conference Repts 50-269/87-08,50-270/87-08 & 50-287/87-08 on 861222.Major Areas Discussed:Safety Sys Functional Insp & Associated Safety Implications IR 05000269/19870011987-01-30030 January 1987 Insp Repts 50-269/87-01,50-270/87-01 & 50-287/87-01 on 870105-08.Violation Noted:Failure to Provide Procedures W/Appropriate Qualitative or Quantitative Acceptance Criteria for Activities Important to Safety ML20211A0061987-01-23023 January 1987 Insp Repts 50-269/86-34,50-270/86-34 & 50-287/86-34 on 861111-870112.No Violations or Deviations Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Lineups & Emergency Drills IR 05000269/19860351987-01-0707 January 1987 Insp Repts 50-269/86-35,50-270/86-35 & 50-287/86-35 on 861208-12.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection Program,Including Review of Organization & Mgt of Health Physics Staff ML20212F5511986-12-24024 December 1986 Notice of Violation from Insp on 861103-12 IR 05000269/19860301986-10-23023 October 1986 Partially Withheld Physical Security Insp Rept 50-269/86-30 on 861007-09 (Ref 10CFR2.790 & 73.21).No Violation Noted. Major Areas Inspected:Physical Protection of Irradiated Reactor Fuel During Transportation Between Sites IR 05000269/19860231986-09-23023 September 1986 Insp Repts 50-269/86-23,50-270/86-23 & 50-287/86-23 on 860826-29.No Violation or Deviation Noted.Major Areas Inspected:Inservice Insp,Review of Procedure & Investigation of Techniques Developed for Ultrasonic Exam of Flange IR 05000269/19860241986-09-19019 September 1986 Insp Repts 50-269/86-24,50-270/86-24 & 50-287/86-24 on 860908.No Noncompliance or Deviations Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Lineups & Followup Items IR 05000269/19860211986-08-15015 August 1986 Insp Repts 50-269/86-21,50-270/86-21 & 50-287/86-21 on 860708-0811.No Noncompliance or Deviation Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Lineups & Followup of Events IR 05000269/19860221986-08-0101 August 1986 Partially Withheld Insp Repts 50-269/86-22,50-270/86-22 & 50-287/86-22 on 860711 (Ref 10CFR2.790 & 73.21).Violation Noted:Individual Inside Vital Area Wore Invalid Picture Badge IR 05000269/19860151986-05-28028 May 1986 Insp Rept 50-269/86-15 on 860423-25.No Violations or Deviations Noted.Major Areas Inspected:Ultrasonic Exam of Mockup Reactor vessel-to-flange Weld for Correlation of Reflectors Between Vessel & Mockup IR 05000269/19860071986-05-15015 May 1986 Insp Repts 50-269/86-07,50-270/86-07 & 50-287/86-07 on 860317-0512.No Violations or Deviations Noted.Major Areas Inspected:Low Level Radwaste Burial Site & Startup Review of Low Level Radwaste Incinerator IR 05000269/19860121986-04-25025 April 1986 Insp Repts 50-269/86-12,50-270/86-12 & 50-287/86-12 on 860331-0404.No Violations or Deviations Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise IR 05000269/19860041986-04-0404 April 1986 Insp Repts 50-269/86-04,50-270/86-04 & 50-287/86-04 on 860211-0310.No Violation Noted.Major Areas Inspected: Operations,Surveillance,Maint,Verification of ESF Lineups & Refueling Activities IR 05000269/19860081986-04-0202 April 1986 Insp Repts 50-269/86-08,50-270/86-08 & 50-287/86-08 on 860303-07.No Violation or Deviation Noted.Major Areas Inspected:Unit 1 Sludge Cleaning of once-through Steam Generator by Water Slap Method & IE Bulletin 82-02 IR 05000269/19860051986-03-25025 March 1986 Insp Repts 50-269/86-05,50-270/86-05 & 50-287/86-05 on 860224-28.Violation Noted:Failure to Provide Adequate Respiratory Protective Equipment to Maintain Intakes of Radioactive Matl ALARA IR 05000269/19860011986-03-20020 March 1986 Insp Repts 50-269/86-01,50-270/86-01 & 50-287/86-01 on 860114-0210.Violation Noted:Failure to Follow Procedure During Channel C Calibr & Functional Test,Resulting in Reactor Trip from 100% Power ML20210H4081986-03-20020 March 1986 Insp Repts 50-269/86-01,50-270/86-01 & 50-287/86-01 on 860114-0210.Violation Noted:Failure to Follow Procedure During Channel C Calibr & Functional Test,Resulting in Reactor Trip from 100% Power IR 05000269/19860091986-03-20020 March 1986 Insp Repts 50-269/86-09,50-270/86-09 & 50-287/86-09 on 860306.No Violation or Deviation Noted.Major Areas Inspected:Steam Generator Cleaning & Maint Re Secondary Water Cycle IR 05000269/19860061986-03-14014 March 1986 Insp Repts 50-269/86-06,50-270/86-06 & 50-287/86-06 on 860224-27.No Violations or Deviations Noted.Major Areas Inspected:Switchyard Surveillance Testing,Containment Isolation Valve Test Witnessing & Procedure Review IR 05000269/19860031986-03-12012 March 1986 Insp Repts 50-269/86-03,50-270/86-03 & 50-287/86-03 on 860218-21.No Violation or Deviation Noted.Major Areas Inspected:Inservice Insp,Work Observation Data Review & Evaluation & Main Feedwater flow-nozzle Mod 1994-01-06
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000269/19930181993-06-13013 June 1993 Insp Repts 50-269/93-18,50-270/93-18 & 50-287/93-18 on 930614-17.No Violations Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise IR 05000269/19930101993-04-16016 April 1993 Insp Repts 50-269/93-10,50-270/93-10 & 50-287/93-10 on 930315-19.No Violations or Deviations Noted.Major Areas Inspected:Radiological Effluents,Process & Effluent Radiation Monitoring Instrumentation & Water Chemistry IR 05000269/19930061993-03-22022 March 1993 Partially Withheld Insp Repts 50-269/93-06,50-270/93-06 & 50-287/93-06 on 930222-25 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Licensee Physical Security Program for Power Reactors ML20034E9571993-02-19019 February 1993 Insp Repts 50-269/93-03,50-270/93-03 & 50-287/93-03 on 930103-30.Violations Noted.Major Areas Inspected:Plant Operations,Surveillance Testing,Maint Activities,Keowee Issues & Insp of Open Items IR 05000269/19930011993-02-0101 February 1993 Safeguards Insp Repts 50-269/93-01,50-270/93-01 & 50-287/93-01 on 930104-07.No Violations Noted.Major Areas Inspected:Physical Security Program.Details Withheld (Ref 10CFR73.21) IR 05000269/19920251992-12-0303 December 1992 Insp Repts 50-269/92-25,50-270/92-25 & 50-287/92-25 on 921102-06.No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program for Power Reactors, Audits,Protected & Vital Area Barriers.Details Withheld IR 05000269/19910081991-04-10010 April 1991 Insp Repts 50-269/91-08,50-270/91-08 & 50-287/91-08 on 910312-15.violations Noted.Major Areas Inspected:Maint, Control Room Operation,Planning & Scheduling Activities, Training & Procedures,Plant Physical Condition & Mgmt IR 05000269/19900321990-11-0505 November 1990 Partially Withheld Insp Repts 50-269/90-32,50-270/90-32 & 50-287/90-32 on 901015-19.No Violations Noted.Major Areas Inspected:Physical Security Program Plans,Mgt Support, Security Program Plans & Protected & Vital Area Barriers IR 05000269/19900221990-07-24024 July 1990 Partially Withheld Safeguard Insp Repts 50-269/90-22, 5-270/90-22 & 50-287/90-22 on 900625-29.No Violations or Deviation Noted.Major Areas Inspected:Core Insp Program for Power Reactors & Safeguards Contingency Plan Implementation IR 05000269/19900181990-06-21021 June 1990 Partially Withheld Insp Repts 50-269/90-18,50-270/90-18 & 50-287/90-18 on 900604-08 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Security Program Audit,Detection & Assessment Aids & Key Control IR 05000269/19900061990-03-19019 March 1990 Partially Withheld Insp Repts 50-269/90-06 & 50-270/90-06 & 50-287/90-06 on 900212-16 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors,Specifically Mgt & Barriers IR 05000269/19890391990-02-22022 February 1990 Insp Repts 50-269/89-39,50-270/89-39 & 50-287/89-39 on 891212-15 & 18-20.No Violations or Deviations Noted.Major Areas inspected:post-refueling Startup Tests of Unit 3 & Core Performance Surveillances on Units 1 & 2 IR 05000269/19890321989-11-20020 November 1989 Partially Withheld Insp Repts 50-269/89-32,50-270/89-32 & 50-287/89-32 on 891002-04 (Ref 10CFR2.790 & 73.21).Major Areas Inspected:Physical Security Program for Power Reactors IR 05000269/19890331989-11-15015 November 1989 Insp Repts 50-269/89-33,50-270/89-33 & 50-287/89-33 on 890930.No Violations or Deviations Noted.Major Areas Inspected:Physical Protection of Shipment of Irradiated Reactor Fuel IR 05000269/19890301989-11-0707 November 1989 Partially Withheld Insp Repts 50-269/89-30,50-270/89-30 & 50-287/89-30 on 890918-22 (Ref 10CFR2.790 & 73.21).One non- Cited Violation Noted.Major Areas Inspected:Physical Security Program for Power Reactors & Mgt Effectiveness IR 05000269/19890201989-07-25025 July 1989 Partially Withheld Insp Repts 50-269/89-20,50-270/89-20 & 50-287/89-20 on 890626-30 (Ref 10CFR2.790.(d) & 73.21). Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors & Security Audit IR 05000269/19890101989-05-19019 May 1989 Partially Withheld Insp Repts 50-269/89-10,50-270/89-10 & 50-287/89-10 on 890410-14 (Ref 10CFR2.790 & 73.21). Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plans & Audits & Protected & Vital Area Barriers IR 05000269/19890091989-04-10010 April 1989 Insp Repts 50-269/89-09,50-270/89-09 & 50-287/89-09 on 890306-10.No Violations Noted.Weaknesses Noted Re Data Base Used to Prepare computer-generated Work Requests.Major Areas Inspected:Design Control,Mods & Open Items IR 05000269/19890071989-03-10010 March 1989 Insp Repts 50-269/89-07,50-270/89-07 & 50-287/89-07 on 890213-17.Deviation Noted.Major Areas Inspected:Conformance to Reg Guide 1.97 Re Instrumentation for light-water-cooled Plants to Assess Conditions During & Following Accident IR 05000269/19880051988-03-21021 March 1988 Insp Repts 50-269/88-05,50-270/88-05 & 50-287/88-05 on 880217-0316.No Violations Noted.Major Areas Inspected:Maint, Operations,Surveillance,Physical Security & Design Changes IR 05000269/19870091987-03-17017 March 1987 Insp Repts 50-269/87-09,50-270/87-09 & 50-287/87-09 on 870209-13.No Violations Noted.Major Areas Inspected:Onsite Review of Liquid & Gaseous Radwaste Programs & Review of TMI Action Items II.B.3 & II.F.1.2 IR 05000269/19870101987-03-17017 March 1987 Insp Repts 50-269/87-10,50-270/87-10 & 50-287/87-10 on 870210-0309.No Violations or Deviations Noted.Major Areas Inspected:Areas of Operations,Surveillance,Maint,Followup of Events & Verification of ESF Lineups IR 05000269/19870061987-03-0909 March 1987 Insp Repts 50-269/87-06,50-270/87-06 & 50-287/87-06 on 870126-30.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp,Ongoing Repairs in Reactor Coolant Pumps & Maint & Welding Activities IR 05000269/19870041987-02-17017 February 1987 Insp Repts 50-269/87-04,50-270/87-04 & 50-287/87-04 on 870113-0209.No Violation or Deviation Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Linups,Followup of Events & Shutdown Work in Progress IR 05000269/19870021987-02-11011 February 1987 Partially Withheld Insp Repts 50-269/87-02,50-270/87-02 & 50-287/87-02 on 870126-30 (Ref 10CFR2.790).Violation Noted Re Inadequate App R Circuit Analysis IR 05000269/19870031987-02-10010 February 1987 Insp Repts 50-269/87-03,50-270/87-03 & 50-287/87-03 on 870112-16.Violation Noted:Failure to Adequately Evaluate Radiological Hazards IR 05000269/19860341987-02-0505 February 1987 Corrected Insp Repts 50-269/86-34,50-270/86-34 & 50-287/86-34 on 861111-870112.Insp Erroneously Reported as Having Been Conducted on 861111-0112 IR 05000269/19870071987-02-0505 February 1987 Enforcement Conference Repts 50-269/87-07,50-270/87-07 & 50-287/87-07 on 861222.Major Areas Discussed:Sequence of Events & Corrective Actions Re Emergency Condenser Circulating Water Sys Degradation IR 05000269/19870081987-02-0505 February 1987 Enforcement Conference Repts 50-269/87-08,50-270/87-08 & 50-287/87-08 on 861222.Major Areas Discussed:Safety Sys Functional Insp & Associated Safety Implications IR 05000269/19870011987-01-30030 January 1987 Insp Repts 50-269/87-01,50-270/87-01 & 50-287/87-01 on 870105-08.Violation Noted:Failure to Provide Procedures W/Appropriate Qualitative or Quantitative Acceptance Criteria for Activities Important to Safety ML20211A0061987-01-23023 January 1987 Insp Repts 50-269/86-34,50-270/86-34 & 50-287/86-34 on 861111-870112.No Violations or Deviations Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Lineups & Emergency Drills IR 05000269/19860351987-01-0707 January 1987 Insp Repts 50-269/86-35,50-270/86-35 & 50-287/86-35 on 861208-12.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection Program,Including Review of Organization & Mgt of Health Physics Staff ML20212F5511986-12-24024 December 1986 Notice of Violation from Insp on 861103-12 IR 05000269/19860301986-10-23023 October 1986 Partially Withheld Physical Security Insp Rept 50-269/86-30 on 861007-09 (Ref 10CFR2.790 & 73.21).No Violation Noted. Major Areas Inspected:Physical Protection of Irradiated Reactor Fuel During Transportation Between Sites IR 05000269/19860231986-09-23023 September 1986 Insp Repts 50-269/86-23,50-270/86-23 & 50-287/86-23 on 860826-29.No Violation or Deviation Noted.Major Areas Inspected:Inservice Insp,Review of Procedure & Investigation of Techniques Developed for Ultrasonic Exam of Flange IR 05000269/19860241986-09-19019 September 1986 Insp Repts 50-269/86-24,50-270/86-24 & 50-287/86-24 on 860908.No Noncompliance or Deviations Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Lineups & Followup Items IR 05000269/19860211986-08-15015 August 1986 Insp Repts 50-269/86-21,50-270/86-21 & 50-287/86-21 on 860708-0811.No Noncompliance or Deviation Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Lineups & Followup of Events IR 05000269/19860221986-08-0101 August 1986 Partially Withheld Insp Repts 50-269/86-22,50-270/86-22 & 50-287/86-22 on 860711 (Ref 10CFR2.790 & 73.21).Violation Noted:Individual Inside Vital Area Wore Invalid Picture Badge IR 05000269/19860151986-05-28028 May 1986 Insp Rept 50-269/86-15 on 860423-25.No Violations or Deviations Noted.Major Areas Inspected:Ultrasonic Exam of Mockup Reactor vessel-to-flange Weld for Correlation of Reflectors Between Vessel & Mockup IR 05000269/19860071986-05-15015 May 1986 Insp Repts 50-269/86-07,50-270/86-07 & 50-287/86-07 on 860317-0512.No Violations or Deviations Noted.Major Areas Inspected:Low Level Radwaste Burial Site & Startup Review of Low Level Radwaste Incinerator IR 05000269/19860121986-04-25025 April 1986 Insp Repts 50-269/86-12,50-270/86-12 & 50-287/86-12 on 860331-0404.No Violations or Deviations Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise IR 05000269/19860041986-04-0404 April 1986 Insp Repts 50-269/86-04,50-270/86-04 & 50-287/86-04 on 860211-0310.No Violation Noted.Major Areas Inspected: Operations,Surveillance,Maint,Verification of ESF Lineups & Refueling Activities IR 05000269/19860081986-04-0202 April 1986 Insp Repts 50-269/86-08,50-270/86-08 & 50-287/86-08 on 860303-07.No Violation or Deviation Noted.Major Areas Inspected:Unit 1 Sludge Cleaning of once-through Steam Generator by Water Slap Method & IE Bulletin 82-02 IR 05000269/19860051986-03-25025 March 1986 Insp Repts 50-269/86-05,50-270/86-05 & 50-287/86-05 on 860224-28.Violation Noted:Failure to Provide Adequate Respiratory Protective Equipment to Maintain Intakes of Radioactive Matl ALARA IR 05000269/19860011986-03-20020 March 1986 Insp Repts 50-269/86-01,50-270/86-01 & 50-287/86-01 on 860114-0210.Violation Noted:Failure to Follow Procedure During Channel C Calibr & Functional Test,Resulting in Reactor Trip from 100% Power ML20210H4081986-03-20020 March 1986 Insp Repts 50-269/86-01,50-270/86-01 & 50-287/86-01 on 860114-0210.Violation Noted:Failure to Follow Procedure During Channel C Calibr & Functional Test,Resulting in Reactor Trip from 100% Power IR 05000269/19860091986-03-20020 March 1986 Insp Repts 50-269/86-09,50-270/86-09 & 50-287/86-09 on 860306.No Violation or Deviation Noted.Major Areas Inspected:Steam Generator Cleaning & Maint Re Secondary Water Cycle IR 05000269/19860061986-03-14014 March 1986 Insp Repts 50-269/86-06,50-270/86-06 & 50-287/86-06 on 860224-27.No Violations or Deviations Noted.Major Areas Inspected:Switchyard Surveillance Testing,Containment Isolation Valve Test Witnessing & Procedure Review IR 05000269/19860031986-03-12012 March 1986 Insp Repts 50-269/86-03,50-270/86-03 & 50-287/86-03 on 860218-21.No Violation or Deviation Noted.Major Areas Inspected:Inservice Insp,Work Observation Data Review & Evaluation & Main Feedwater flow-nozzle Mod 1994-01-06
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts IR 05000269/19930181993-06-13013 June 1993 Insp Repts 50-269/93-18,50-270/93-18 & 50-287/93-18 on 930614-17.No Violations Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise IR 05000269/19930101993-04-16016 April 1993 Insp Repts 50-269/93-10,50-270/93-10 & 50-287/93-10 on 930315-19.No Violations or Deviations Noted.Major Areas Inspected:Radiological Effluents,Process & Effluent Radiation Monitoring Instrumentation & Water Chemistry IR 05000269/19930061993-03-22022 March 1993 Partially Withheld Insp Repts 50-269/93-06,50-270/93-06 & 50-287/93-06 on 930222-25 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Licensee Physical Security Program for Power Reactors ML20034E9571993-02-19019 February 1993 Insp Repts 50-269/93-03,50-270/93-03 & 50-287/93-03 on 930103-30.Violations Noted.Major Areas Inspected:Plant Operations,Surveillance Testing,Maint Activities,Keowee Issues & Insp of Open Items IR 05000269/19930011993-02-0101 February 1993 Safeguards Insp Repts 50-269/93-01,50-270/93-01 & 50-287/93-01 on 930104-07.No Violations Noted.Major Areas Inspected:Physical Security Program.Details Withheld (Ref 10CFR73.21) IR 05000269/19920251992-12-0303 December 1992 Insp Repts 50-269/92-25,50-270/92-25 & 50-287/92-25 on 921102-06.No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program for Power Reactors, Audits,Protected & Vital Area Barriers.Details Withheld IR 05000269/19910081991-04-10010 April 1991 Insp Repts 50-269/91-08,50-270/91-08 & 50-287/91-08 on 910312-15.violations Noted.Major Areas Inspected:Maint, Control Room Operation,Planning & Scheduling Activities, Training & Procedures,Plant Physical Condition & Mgmt IR 05000269/19900321990-11-0505 November 1990 Partially Withheld Insp Repts 50-269/90-32,50-270/90-32 & 50-287/90-32 on 901015-19.No Violations Noted.Major Areas Inspected:Physical Security Program Plans,Mgt Support, Security Program Plans & Protected & Vital Area Barriers IR 05000269/19900221990-07-24024 July 1990 Partially Withheld Safeguard Insp Repts 50-269/90-22, 5-270/90-22 & 50-287/90-22 on 900625-29.No Violations or Deviation Noted.Major Areas Inspected:Core Insp Program for Power Reactors & Safeguards Contingency Plan Implementation IR 05000269/19900181990-06-21021 June 1990 Partially Withheld Insp Repts 50-269/90-18,50-270/90-18 & 50-287/90-18 on 900604-08 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Security Program Audit,Detection & Assessment Aids & Key Control IR 05000269/19900061990-03-19019 March 1990 Partially Withheld Insp Repts 50-269/90-06 & 50-270/90-06 & 50-287/90-06 on 900212-16 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors,Specifically Mgt & Barriers IR 05000269/19890391990-02-22022 February 1990 Insp Repts 50-269/89-39,50-270/89-39 & 50-287/89-39 on 891212-15 & 18-20.No Violations or Deviations Noted.Major Areas inspected:post-refueling Startup Tests of Unit 3 & Core Performance Surveillances on Units 1 & 2 IR 05000269/19890321989-11-20020 November 1989 Partially Withheld Insp Repts 50-269/89-32,50-270/89-32 & 50-287/89-32 on 891002-04 (Ref 10CFR2.790 & 73.21).Major Areas Inspected:Physical Security Program for Power Reactors IR 05000269/19890331989-11-15015 November 1989 Insp Repts 50-269/89-33,50-270/89-33 & 50-287/89-33 on 890930.No Violations or Deviations Noted.Major Areas Inspected:Physical Protection of Shipment of Irradiated Reactor Fuel IR 05000269/19890301989-11-0707 November 1989 Partially Withheld Insp Repts 50-269/89-30,50-270/89-30 & 50-287/89-30 on 890918-22 (Ref 10CFR2.790 & 73.21).One non- Cited Violation Noted.Major Areas Inspected:Physical Security Program for Power Reactors & Mgt Effectiveness IR 05000269/19890201989-07-25025 July 1989 Partially Withheld Insp Repts 50-269/89-20,50-270/89-20 & 50-287/89-20 on 890626-30 (Ref 10CFR2.790.(d) & 73.21). Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors & Security Audit IR 05000269/19890101989-05-19019 May 1989 Partially Withheld Insp Repts 50-269/89-10,50-270/89-10 & 50-287/89-10 on 890410-14 (Ref 10CFR2.790 & 73.21). Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plans & Audits & Protected & Vital Area Barriers IR 05000269/19890091989-04-10010 April 1989 Insp Repts 50-269/89-09,50-270/89-09 & 50-287/89-09 on 890306-10.No Violations Noted.Weaknesses Noted Re Data Base Used to Prepare computer-generated Work Requests.Major Areas Inspected:Design Control,Mods & Open Items IR 05000269/19890071989-03-10010 March 1989 Insp Repts 50-269/89-07,50-270/89-07 & 50-287/89-07 on 890213-17.Deviation Noted.Major Areas Inspected:Conformance to Reg Guide 1.97 Re Instrumentation for light-water-cooled Plants to Assess Conditions During & Following Accident IR 05000269/19880051988-03-21021 March 1988 Insp Repts 50-269/88-05,50-270/88-05 & 50-287/88-05 on 880217-0316.No Violations Noted.Major Areas Inspected:Maint, Operations,Surveillance,Physical Security & Design Changes IR 05000269/19870091987-03-17017 March 1987 Insp Repts 50-269/87-09,50-270/87-09 & 50-287/87-09 on 870209-13.No Violations Noted.Major Areas Inspected:Onsite Review of Liquid & Gaseous Radwaste Programs & Review of TMI Action Items II.B.3 & II.F.1.2 IR 05000269/19870101987-03-17017 March 1987 Insp Repts 50-269/87-10,50-270/87-10 & 50-287/87-10 on 870210-0309.No Violations or Deviations Noted.Major Areas Inspected:Areas of Operations,Surveillance,Maint,Followup of Events & Verification of ESF Lineups IR 05000269/19870061987-03-0909 March 1987 Insp Repts 50-269/87-06,50-270/87-06 & 50-287/87-06 on 870126-30.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp,Ongoing Repairs in Reactor Coolant Pumps & Maint & Welding Activities IR 05000269/19870041987-02-17017 February 1987 Insp Repts 50-269/87-04,50-270/87-04 & 50-287/87-04 on 870113-0209.No Violation or Deviation Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Linups,Followup of Events & Shutdown Work in Progress IR 05000269/19870021987-02-11011 February 1987 Partially Withheld Insp Repts 50-269/87-02,50-270/87-02 & 50-287/87-02 on 870126-30 (Ref 10CFR2.790).Violation Noted Re Inadequate App R Circuit Analysis IR 05000269/19870031987-02-10010 February 1987 Insp Repts 50-269/87-03,50-270/87-03 & 50-287/87-03 on 870112-16.Violation Noted:Failure to Adequately Evaluate Radiological Hazards IR 05000269/19860341987-02-0505 February 1987 Corrected Insp Repts 50-269/86-34,50-270/86-34 & 50-287/86-34 on 861111-870112.Insp Erroneously Reported as Having Been Conducted on 861111-0112 IR 05000269/19870071987-02-0505 February 1987 Enforcement Conference Repts 50-269/87-07,50-270/87-07 & 50-287/87-07 on 861222.Major Areas Discussed:Sequence of Events & Corrective Actions Re Emergency Condenser Circulating Water Sys Degradation IR 05000269/19870081987-02-0505 February 1987 Enforcement Conference Repts 50-269/87-08,50-270/87-08 & 50-287/87-08 on 861222.Major Areas Discussed:Safety Sys Functional Insp & Associated Safety Implications IR 05000269/19870011987-01-30030 January 1987 Insp Repts 50-269/87-01,50-270/87-01 & 50-287/87-01 on 870105-08.Violation Noted:Failure to Provide Procedures W/Appropriate Qualitative or Quantitative Acceptance Criteria for Activities Important to Safety ML20211A0061987-01-23023 January 1987 Insp Repts 50-269/86-34,50-270/86-34 & 50-287/86-34 on 861111-870112.No Violations or Deviations Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Lineups & Emergency Drills IR 05000269/19860351987-01-0707 January 1987 Insp Repts 50-269/86-35,50-270/86-35 & 50-287/86-35 on 861208-12.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection Program,Including Review of Organization & Mgt of Health Physics Staff ML20212F5511986-12-24024 December 1986 Notice of Violation from Insp on 861103-12 IR 05000269/19860301986-10-23023 October 1986 Partially Withheld Physical Security Insp Rept 50-269/86-30 on 861007-09 (Ref 10CFR2.790 & 73.21).No Violation Noted. Major Areas Inspected:Physical Protection of Irradiated Reactor Fuel During Transportation Between Sites IR 05000269/19860231986-09-23023 September 1986 Insp Repts 50-269/86-23,50-270/86-23 & 50-287/86-23 on 860826-29.No Violation or Deviation Noted.Major Areas Inspected:Inservice Insp,Review of Procedure & Investigation of Techniques Developed for Ultrasonic Exam of Flange IR 05000269/19860241986-09-19019 September 1986 Insp Repts 50-269/86-24,50-270/86-24 & 50-287/86-24 on 860908.No Noncompliance or Deviations Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Lineups & Followup Items IR 05000269/19860211986-08-15015 August 1986 Insp Repts 50-269/86-21,50-270/86-21 & 50-287/86-21 on 860708-0811.No Noncompliance or Deviation Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Lineups & Followup of Events IR 05000269/19860221986-08-0101 August 1986 Partially Withheld Insp Repts 50-269/86-22,50-270/86-22 & 50-287/86-22 on 860711 (Ref 10CFR2.790 & 73.21).Violation Noted:Individual Inside Vital Area Wore Invalid Picture Badge IR 05000269/19860151986-05-28028 May 1986 Insp Rept 50-269/86-15 on 860423-25.No Violations or Deviations Noted.Major Areas Inspected:Ultrasonic Exam of Mockup Reactor vessel-to-flange Weld for Correlation of Reflectors Between Vessel & Mockup IR 05000269/19860071986-05-15015 May 1986 Insp Repts 50-269/86-07,50-270/86-07 & 50-287/86-07 on 860317-0512.No Violations or Deviations Noted.Major Areas Inspected:Low Level Radwaste Burial Site & Startup Review of Low Level Radwaste Incinerator IR 05000269/19860121986-04-25025 April 1986 Insp Repts 50-269/86-12,50-270/86-12 & 50-287/86-12 on 860331-0404.No Violations or Deviations Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise IR 05000269/19860041986-04-0404 April 1986 Insp Repts 50-269/86-04,50-270/86-04 & 50-287/86-04 on 860211-0310.No Violation Noted.Major Areas Inspected: Operations,Surveillance,Maint,Verification of ESF Lineups & Refueling Activities IR 05000269/19860081986-04-0202 April 1986 Insp Repts 50-269/86-08,50-270/86-08 & 50-287/86-08 on 860303-07.No Violation or Deviation Noted.Major Areas Inspected:Unit 1 Sludge Cleaning of once-through Steam Generator by Water Slap Method & IE Bulletin 82-02 IR 05000269/19860051986-03-25025 March 1986 Insp Repts 50-269/86-05,50-270/86-05 & 50-287/86-05 on 860224-28.Violation Noted:Failure to Provide Adequate Respiratory Protective Equipment to Maintain Intakes of Radioactive Matl ALARA IR 05000269/19860011986-03-20020 March 1986 Insp Repts 50-269/86-01,50-270/86-01 & 50-287/86-01 on 860114-0210.Violation Noted:Failure to Follow Procedure During Channel C Calibr & Functional Test,Resulting in Reactor Trip from 100% Power ML20210H4081986-03-20020 March 1986 Insp Repts 50-269/86-01,50-270/86-01 & 50-287/86-01 on 860114-0210.Violation Noted:Failure to Follow Procedure During Channel C Calibr & Functional Test,Resulting in Reactor Trip from 100% Power IR 05000269/19860091986-03-20020 March 1986 Insp Repts 50-269/86-09,50-270/86-09 & 50-287/86-09 on 860306.No Violation or Deviation Noted.Major Areas Inspected:Steam Generator Cleaning & Maint Re Secondary Water Cycle IR 05000269/19860061986-03-14014 March 1986 Insp Repts 50-269/86-06,50-270/86-06 & 50-287/86-06 on 860224-27.No Violations or Deviations Noted.Major Areas Inspected:Switchyard Surveillance Testing,Containment Isolation Valve Test Witnessing & Procedure Review IR 05000269/19860031986-03-12012 March 1986 Insp Repts 50-269/86-03,50-270/86-03 & 50-287/86-03 on 860218-21.No Violation or Deviation Noted.Major Areas Inspected:Inservice Insp,Work Observation Data Review & Evaluation & Main Feedwater flow-nozzle Mod 1994-01-06
[Table view] Category:UTILITY
MONTHYEARIR 05000269/19900321990-11-0505 November 1990 Partially Withheld Insp Repts 50-269/90-32,50-270/90-32 & 50-287/90-32 on 901015-19.No Violations Noted.Major Areas Inspected:Physical Security Program Plans,Mgt Support, Security Program Plans & Protected & Vital Area Barriers IR 05000269/19900221990-07-24024 July 1990 Partially Withheld Safeguard Insp Repts 50-269/90-22, 5-270/90-22 & 50-287/90-22 on 900625-29.No Violations or Deviation Noted.Major Areas Inspected:Core Insp Program for Power Reactors & Safeguards Contingency Plan Implementation IR 05000269/19900181990-06-21021 June 1990 Partially Withheld Insp Repts 50-269/90-18,50-270/90-18 & 50-287/90-18 on 900604-08 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Security Program Audit,Detection & Assessment Aids & Key Control IR 05000269/19890391990-02-22022 February 1990 Insp Repts 50-269/89-39,50-270/89-39 & 50-287/89-39 on 891212-15 & 18-20.No Violations or Deviations Noted.Major Areas inspected:post-refueling Startup Tests of Unit 3 & Core Performance Surveillances on Units 1 & 2 IR 05000269/19890321989-11-20020 November 1989 Partially Withheld Insp Repts 50-269/89-32,50-270/89-32 & 50-287/89-32 on 891002-04 (Ref 10CFR2.790 & 73.21).Major Areas Inspected:Physical Security Program for Power Reactors IR 05000269/19890331989-11-15015 November 1989 Insp Repts 50-269/89-33,50-270/89-33 & 50-287/89-33 on 890930.No Violations or Deviations Noted.Major Areas Inspected:Physical Protection of Shipment of Irradiated Reactor Fuel IR 05000269/19890301989-11-0707 November 1989 Partially Withheld Insp Repts 50-269/89-30,50-270/89-30 & 50-287/89-30 on 890918-22 (Ref 10CFR2.790 & 73.21).One non- Cited Violation Noted.Major Areas Inspected:Physical Security Program for Power Reactors & Mgt Effectiveness IR 05000269/19890201989-07-25025 July 1989 Partially Withheld Insp Repts 50-269/89-20,50-270/89-20 & 50-287/89-20 on 890626-30 (Ref 10CFR2.790.(d) & 73.21). Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors & Security Audit IR 05000269/19890091989-04-10010 April 1989 Insp Repts 50-269/89-09,50-270/89-09 & 50-287/89-09 on 890306-10.No Violations Noted.Weaknesses Noted Re Data Base Used to Prepare computer-generated Work Requests.Major Areas Inspected:Design Control,Mods & Open Items IR 05000269/19890071989-03-10010 March 1989 Insp Repts 50-269/89-07,50-270/89-07 & 50-287/89-07 on 890213-17.Deviation Noted.Major Areas Inspected:Conformance to Reg Guide 1.97 Re Instrumentation for light-water-cooled Plants to Assess Conditions During & Following Accident IR 05000269/19880051988-03-21021 March 1988 Insp Repts 50-269/88-05,50-270/88-05 & 50-287/88-05 on 880217-0316.No Violations Noted.Major Areas Inspected:Maint, Operations,Surveillance,Physical Security & Design Changes IR 05000269/19870101987-03-17017 March 1987 Insp Repts 50-269/87-10,50-270/87-10 & 50-287/87-10 on 870210-0309.No Violations or Deviations Noted.Major Areas Inspected:Areas of Operations,Surveillance,Maint,Followup of Events & Verification of ESF Lineups IR 05000269/19870091987-03-17017 March 1987 Insp Repts 50-269/87-09,50-270/87-09 & 50-287/87-09 on 870209-13.No Violations Noted.Major Areas Inspected:Onsite Review of Liquid & Gaseous Radwaste Programs & Review of TMI Action Items II.B.3 & II.F.1.2 IR 05000269/19870061987-03-0909 March 1987 Insp Repts 50-269/87-06,50-270/87-06 & 50-287/87-06 on 870126-30.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp,Ongoing Repairs in Reactor Coolant Pumps & Maint & Welding Activities IR 05000269/19870041987-02-17017 February 1987 Insp Repts 50-269/87-04,50-270/87-04 & 50-287/87-04 on 870113-0209.No Violation or Deviation Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Linups,Followup of Events & Shutdown Work in Progress IR 05000269/19870021987-02-11011 February 1987 Partially Withheld Insp Repts 50-269/87-02,50-270/87-02 & 50-287/87-02 on 870126-30 (Ref 10CFR2.790).Violation Noted Re Inadequate App R Circuit Analysis IR 05000269/19870031987-02-10010 February 1987 Insp Repts 50-269/87-03,50-270/87-03 & 50-287/87-03 on 870112-16.Violation Noted:Failure to Adequately Evaluate Radiological Hazards IR 05000269/19870081987-02-0505 February 1987 Enforcement Conference Repts 50-269/87-08,50-270/87-08 & 50-287/87-08 on 861222.Major Areas Discussed:Safety Sys Functional Insp & Associated Safety Implications IR 05000269/19870071987-02-0505 February 1987 Enforcement Conference Repts 50-269/87-07,50-270/87-07 & 50-287/87-07 on 861222.Major Areas Discussed:Sequence of Events & Corrective Actions Re Emergency Condenser Circulating Water Sys Degradation IR 05000269/19860341987-02-0505 February 1987 Corrected Insp Repts 50-269/86-34,50-270/86-34 & 50-287/86-34 on 861111-870112.Insp Erroneously Reported as Having Been Conducted on 861111-0112 IR 05000269/19870011987-01-30030 January 1987 Insp Repts 50-269/87-01,50-270/87-01 & 50-287/87-01 on 870105-08.Violation Noted:Failure to Provide Procedures W/Appropriate Qualitative or Quantitative Acceptance Criteria for Activities Important to Safety ML20211A0061987-01-23023 January 1987 Insp Repts 50-269/86-34,50-270/86-34 & 50-287/86-34 on 861111-870112.No Violations or Deviations Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Lineups & Emergency Drills IR 05000269/19860351987-01-0707 January 1987 Insp Repts 50-269/86-35,50-270/86-35 & 50-287/86-35 on 861208-12.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection Program,Including Review of Organization & Mgt of Health Physics Staff IR 05000269/19860301986-10-23023 October 1986 Partially Withheld Physical Security Insp Rept 50-269/86-30 on 861007-09 (Ref 10CFR2.790 & 73.21).No Violation Noted. Major Areas Inspected:Physical Protection of Irradiated Reactor Fuel During Transportation Between Sites IR 05000269/19860231986-09-23023 September 1986 Insp Repts 50-269/86-23,50-270/86-23 & 50-287/86-23 on 860826-29.No Violation or Deviation Noted.Major Areas Inspected:Inservice Insp,Review of Procedure & Investigation of Techniques Developed for Ultrasonic Exam of Flange IR 05000269/19860241986-09-19019 September 1986 Insp Repts 50-269/86-24,50-270/86-24 & 50-287/86-24 on 860908.No Noncompliance or Deviations Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Lineups & Followup Items IR 05000269/19860211986-08-15015 August 1986 Insp Repts 50-269/86-21,50-270/86-21 & 50-287/86-21 on 860708-0811.No Noncompliance or Deviation Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Lineups & Followup of Events IR 05000269/19860221986-08-0101 August 1986 Partially Withheld Insp Repts 50-269/86-22,50-270/86-22 & 50-287/86-22 on 860711 (Ref 10CFR2.790 & 73.21).Violation Noted:Individual Inside Vital Area Wore Invalid Picture Badge IR 05000269/19860151986-05-28028 May 1986 Insp Rept 50-269/86-15 on 860423-25.No Violations or Deviations Noted.Major Areas Inspected:Ultrasonic Exam of Mockup Reactor vessel-to-flange Weld for Correlation of Reflectors Between Vessel & Mockup IR 05000269/19860121986-04-25025 April 1986 Insp Repts 50-269/86-12,50-270/86-12 & 50-287/86-12 on 860331-0404.No Violations or Deviations Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise IR 05000269/19860041986-04-0404 April 1986 Insp Repts 50-269/86-04,50-270/86-04 & 50-287/86-04 on 860211-0310.No Violation Noted.Major Areas Inspected: Operations,Surveillance,Maint,Verification of ESF Lineups & Refueling Activities IR 05000269/19860081986-04-0202 April 1986 Insp Repts 50-269/86-08,50-270/86-08 & 50-287/86-08 on 860303-07.No Violation or Deviation Noted.Major Areas Inspected:Unit 1 Sludge Cleaning of once-through Steam Generator by Water Slap Method & IE Bulletin 82-02 IR 05000269/19860051986-03-25025 March 1986 Insp Repts 50-269/86-05,50-270/86-05 & 50-287/86-05 on 860224-28.Violation Noted:Failure to Provide Adequate Respiratory Protective Equipment to Maintain Intakes of Radioactive Matl ALARA IR 05000269/19860091986-03-20020 March 1986 Insp Repts 50-269/86-09,50-270/86-09 & 50-287/86-09 on 860306.No Violation or Deviation Noted.Major Areas Inspected:Steam Generator Cleaning & Maint Re Secondary Water Cycle IR 05000269/19860011986-03-20020 March 1986 Insp Repts 50-269/86-01,50-270/86-01 & 50-287/86-01 on 860114-0210.Violation Noted:Failure to Follow Procedure During Channel C Calibr & Functional Test,Resulting in Reactor Trip from 100% Power ML20210H4081986-03-20020 March 1986 Insp Repts 50-269/86-01,50-270/86-01 & 50-287/86-01 on 860114-0210.Violation Noted:Failure to Follow Procedure During Channel C Calibr & Functional Test,Resulting in Reactor Trip from 100% Power IR 05000269/19860061986-03-14014 March 1986 Insp Repts 50-269/86-06,50-270/86-06 & 50-287/86-06 on 860224-27.No Violations or Deviations Noted.Major Areas Inspected:Switchyard Surveillance Testing,Containment Isolation Valve Test Witnessing & Procedure Review IR 05000269/19860031986-03-12012 March 1986 Insp Repts 50-269/86-03,50-270/86-03 & 50-287/86-03 on 860218-21.No Violation or Deviation Noted.Major Areas Inspected:Inservice Insp,Work Observation Data Review & Evaluation & Main Feedwater flow-nozzle Mod IR 05000269/19850411986-02-11011 February 1986 Insp Repts 50-269/85-41,50-270/85-41 & 50-287/85-41 on 851210-860113.Noncompliance Noted:Failure to Follow Exempt Change Procedure & Failure to Shut Down Reactor within 24 H of Discovery of Excessive Leakage IR 05000269/19850391986-02-0707 February 1986 Insp Repts 50-269/85-39,50-270/85-39 & 50-287/85-39 on 851209-13 & 860114.Violation Identified in Area of Physical Barrier - Protected Area.Rept Details Withheld (Ref 10CFR2.790 & 73.21) IR 05000269/19850401986-01-13013 January 1986 Insp Repts 50-269/85-40,50-270/85-40 & 50-287/85-40 on 851209-13.No Violation or Deviation Identified.Major Areas Inspected:Maint & Surveillance Testing of Main Steam Safety Relief & Pressurizer Code Safety Relief Valves IR 05000269/19850381985-12-13013 December 1985 Insp Repts 50-269/85-38,50-270/85-38 & 50-287/85-38 on 851112-1209.No Noncompliance or Deviations Noted.Major Areas Inspected:Operations,Surveillance,Maint,Startup Testing of Safe Shutdown Facility & LER Review ML20137E4031985-11-21021 November 1985 Insp Repts 50-269/85-37,50-270/85-37 & 50-287/85-37 on 851008-1111.Noncompliance Noted:Failure to Document Malfunctioning Valve 3LP-2 in Reactor Operator & Senior Reactor Operator Log IR 05000269/19850351985-10-28028 October 1985 Insp Repts 50-269/85-35,50-270/85-35 & 50-287/85-35 on 851007-11.No Violation or Deviation Noted.Major Areas Inspected:Review & Witnessing of Pre & post-criticality Tests Following Refueling Outage & Info Notice Followup IR 05000269/19850341985-10-24024 October 1985 Insp Repts 50-269/85-34,50-270/85-34 & 50-287/85-34 on 850930-1004.No Violation or Deviation Noted.Major Areas Inspected:Fire Protection/Prevention & Followup on Previously Identified Items IR 05000269/19850321985-10-23023 October 1985 Insp Repts 50-269/85-32,50-270/85-32 & 50-287/85-32 on 850910-1007.No Noncompliance or Deviation Noted.Major Areas Inspected:Operations,Surveillance,Maint,Offsite Review Committee & Startup from Refueling IR 05000269/19850331985-10-17017 October 1985 Insp Repts 50-269/85-33,50-270/85-33 & 50-287/85-33 on 850923-26.No Violation or Deviation Noted.Major Areas Inspected:Unit 3 Inservice Insp,Review & Record Evaluation & Main Feedwater Flow Nozzle post-weld Heat Treatment IR 05000269/19850311985-10-11011 October 1985 Insp Repts 50-269/85-31,50-270/85-31 & 50-287/85-31 on 850923-27.No Violation or Deviation Noted.Major Areas Inspected:Reactor Bldg Tendon Surveillance Program & Surveillance of Pipe Support & Restraints ML20138M5601985-10-0808 October 1985 Insp Repts 50-269/85-30,50-270/85-30 & 50-287/85-30 on 850916-20.Violation Noted:Failure to Label Containers of Radioactive Matl ML20141A0191985-10-0202 October 1985 Insp Repts 50-269/85-28,50-270/85-28 & 50-287/85-28 on 850903-06.Violation Noted:Inadequate Procedure for Documentation of Vital Area Barrier Insp.Details Withheld (Ref 10CFR2.790(d) & 73.21) 1990-07-24
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARPNO-II-97-065, on 971228,initiated Controlled Shutdown of Unit Due to Exceeding TS Leakage Limit of 150 Gpd.Licensee Continuing W/Plant Depressurization & Cooldown & Outage Planned of Several Days to Investigate & Repair SG1997-12-29029 December 1997 PNO-II-97-065:on 971228,initiated Controlled Shutdown of Unit Due to Exceeding TS Leakage Limit of 150 Gpd.Licensee Continuing W/Plant Depressurization & Cooldown & Outage Planned of Several Days to Investigate & Repair SG ML20211K9431997-09-26026 September 1997 Notice of Violation from Insp on 970721-26.Violation Noted: Licensee Failed to Follow Procedures for Security Badges & Access Control of Facility ML20210S0391997-08-27027 August 1997 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $330,000.Violation Noted:Between 970501-02,w/ Fuel in Oconee Unit 3 Core & RCS Temp Greater than 350 F, Licensee Failed to Maintain HPI Sys Operable as Required PNO-II-97-034, on 970613,extended Shutdown to Meet CAL 2-97-03 Commitments to Shutdown Unit 1 No Later than 970614 & to Implement Actions Re HPI Sys.Nrc Resident Inspector Will Followup on Unit 1 Shutdown & Recovery Activities1997-06-13013 June 1997 PNO-II-97-034:on 970613,extended Shutdown to Meet CAL 2-97-03 Commitments to Shutdown Unit 1 No Later than 970614 & to Implement Actions Re HPI Sys.Nrc Resident Inspector Will Followup on Unit 1 Shutdown & Recovery Activities IR 05000269/19930321994-01-0606 January 1994 Insp Repts 50-269/93-32,50-270/93-32,50-287/93-32, 50-369/93-31,50-370/93-31,50-413/93-35 & 50-414,respectively on 931213-17.Violations Noted.Major Areas Inpected:Licensee Safeguards Info Program to folow-up on Licensee Repts PNO-II-93-039, on 930823,reactor Trip Occurred Due to Loss of Power to Vital Panelboard.Investigation Team Dispatched to Site to Review Root Cause & Plant Response.State & Local Authorities Notified1993-08-24024 August 1993 PNO-II-93-039:on 930823,reactor Trip Occurred Due to Loss of Power to Vital Panelboard.Investigation Team Dispatched to Site to Review Root Cause & Plant Response.State & Local Authorities Notified IR 05000269/19930181993-06-13013 June 1993 Insp Repts 50-269/93-18,50-270/93-18 & 50-287/93-18 on 930614-17.No Violations Noted.Major Areas Inspected:Annual Emergency Preparedness Exercise IR 05000269/19930101993-04-16016 April 1993 Insp Repts 50-269/93-10,50-270/93-10 & 50-287/93-10 on 930315-19.No Violations or Deviations Noted.Major Areas Inspected:Radiological Effluents,Process & Effluent Radiation Monitoring Instrumentation & Water Chemistry IR 05000269/19930061993-03-22022 March 1993 Partially Withheld Insp Repts 50-269/93-06,50-270/93-06 & 50-287/93-06 on 930222-25 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Licensee Physical Security Program for Power Reactors IR 05000269/19933001993-02-23023 February 1993 Initial Exam Rept 50-269/93-300 Administered During Wk of 930125.Exam Results:Seven Senior Reactor Operators Passed Both Written Exams & Operating Tests ML20034E9571993-02-19019 February 1993 Insp Repts 50-269/93-03,50-270/93-03 & 50-287/93-03 on 930103-30.Violations Noted.Major Areas Inspected:Plant Operations,Surveillance Testing,Maint Activities,Keowee Issues & Insp of Open Items IR 05000269/19930011993-02-0101 February 1993 Safeguards Insp Repts 50-269/93-01,50-270/93-01 & 50-287/93-01 on 930104-07.No Violations Noted.Major Areas Inspected:Physical Security Program.Details Withheld (Ref 10CFR73.21) IR 05000269/19920251992-12-0303 December 1992 Insp Repts 50-269/92-25,50-270/92-25 & 50-287/92-25 on 921102-06.No Violations or Deviations Noted.Major Areas Inspected:Physical Security Program for Power Reactors, Audits,Protected & Vital Area Barriers.Details Withheld PNO-II-92-070A, on 921019,AIT Dispatched to Facility Following Reactor Trip Due to Loss of Ac Power Followed by Degraded Emergency Power Supply.Following Implementation of Corrective Actions,Facility Restarted on 9210261992-10-28028 October 1992 PNO-II-92-070A:on 921019,AIT Dispatched to Facility Following Reactor Trip Due to Loss of Ac Power Followed by Degraded Emergency Power Supply.Following Implementation of Corrective Actions,Facility Restarted on 921026 PNO-II-92-070, on 921019,several Circuit Breakers Failed in 230KV Switchyard to Open Position for Unknown Reasons. Licensee Has Inititated Investigation to Review Event to Determine Cause & Determine Why Certain Equipment Failed1992-10-20020 October 1992 PNO-II-92-070:on 921019,several Circuit Breakers Failed in 230KV Switchyard to Open Position for Unknown Reasons. Licensee Has Inititated Investigation to Review Event to Determine Cause & Determine Why Certain Equipment Failed PNO-II-91-074B, on 911123,unit Remained in Cold Shutdown,Per Declaration of Alert at 0214 Due to Leak in Rcs.As of 911126,total of 7,800 Gallons of Treated Water Released from Plant to Lake Hartwell1991-11-26026 November 1991 PNO-II-91-074B:on 911123,unit Remained in Cold Shutdown,Per Declaration of Alert at 0214 Due to Leak in Rcs.As of 911126,total of 7,800 Gallons of Treated Water Released from Plant to Lake Hartwell ML20134D2581991-06-0404 June 1991 Notice of Violation from Insp on 910312-15.Violations Noted:Station Was Not Maintained According to Main Procedure MP/0/A/1800/105,Section 6.5,which Clearly Identified That Flange Was to Be Installed on Valve 3LP19 IR 05000269/19910081991-04-10010 April 1991 Insp Repts 50-269/91-08,50-270/91-08 & 50-287/91-08 on 910312-15.violations Noted.Major Areas Inspected:Maint, Control Room Operation,Planning & Scheduling Activities, Training & Procedures,Plant Physical Condition & Mgmt PNO-II-91-006A, on 910308,augmented Insp Team Dispatched to Followup on Loss of Decay Heat Capability Event.Team Will Arrive on-site & Begin Insp on 9103121991-03-11011 March 1991 PNO-II-91-006A:on 910308,augmented Insp Team Dispatched to Followup on Loss of Decay Heat Capability Event.Team Will Arrive on-site & Begin Insp on 910312 PNO-II-91-006, on 910308,during Draining of RCS & Borated Water Storage Tank,Loss of DHR Occurred.Caused by Securing LPI Pump 3A Due to Pump Cavitation.Suction Valves from Borated Water Tank Opened to Recover Rx Vessel Level1991-03-0808 March 1991 PNO-II-91-006:on 910308,during Draining of RCS & Borated Water Storage Tank,Loss of DHR Occurred.Caused by Securing LPI Pump 3A Due to Pump Cavitation.Suction Valves from Borated Water Tank Opened to Recover Rx Vessel Level PNO-II-90-070, on 901108,unit Commenced Controlled Shutdown from 60% Power Due to Tube Leak in Steam Generator a1990-11-0808 November 1990 PNO-II-90-070:on 901108,unit Commenced Controlled Shutdown from 60% Power Due to Tube Leak in Steam Generator a IR 05000269/19900321990-11-0505 November 1990 Partially Withheld Insp Repts 50-269/90-32,50-270/90-32 & 50-287/90-32 on 901015-19.No Violations Noted.Major Areas Inspected:Physical Security Program Plans,Mgt Support, Security Program Plans & Protected & Vital Area Barriers IR 05000269/19900241990-10-0202 October 1990 SALP Repts 50-269/90-24,50-270/90-24,50-287/90-24 & 72-0004/90-24 for Feb 1989 - Jul 1990 IR 05000269/19900221990-07-24024 July 1990 Partially Withheld Safeguard Insp Repts 50-269/90-22, 5-270/90-22 & 50-287/90-22 on 900625-29.No Violations or Deviation Noted.Major Areas Inspected:Core Insp Program for Power Reactors & Safeguards Contingency Plan Implementation IR 05000269/19900181990-06-21021 June 1990 Partially Withheld Insp Repts 50-269/90-18,50-270/90-18 & 50-287/90-18 on 900604-08 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Security Program Audit,Detection & Assessment Aids & Key Control PNO-II-90-024, on 900517,plant Operators in Unit 1 & 2 Control Room Break Area Noted Water Coming Down Wall.Water Being Pumped to Spent Fuel Pool Due to Out of Sequence Valve Alignment Which Caused Overfilling.No Personnel Injured1990-05-18018 May 1990 PNO-II-90-024:on 900517,plant Operators in Unit 1 & 2 Control Room Break Area Noted Water Coming Down Wall.Water Being Pumped to Spent Fuel Pool Due to Out of Sequence Valve Alignment Which Caused Overfilling.No Personnel Injured IR 05000269/19900061990-03-19019 March 1990 Partially Withheld Insp Repts 50-269/90-06 & 50-270/90-06 & 50-287/90-06 on 900212-16 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors,Specifically Mgt & Barriers IR 05000269/19890391990-02-22022 February 1990 Insp Repts 50-269/89-39,50-270/89-39 & 50-287/89-39 on 891212-15 & 18-20.No Violations or Deviations Noted.Major Areas inspected:post-refueling Startup Tests of Unit 3 & Core Performance Surveillances on Units 1 & 2 IR 05000269/19890321989-11-20020 November 1989 Partially Withheld Insp Repts 50-269/89-32,50-270/89-32 & 50-287/89-32 on 891002-04 (Ref 10CFR2.790 & 73.21).Major Areas Inspected:Physical Security Program for Power Reactors IR 05000269/19890331989-11-15015 November 1989 Insp Repts 50-269/89-33,50-270/89-33 & 50-287/89-33 on 890930.No Violations or Deviations Noted.Major Areas Inspected:Physical Protection of Shipment of Irradiated Reactor Fuel IR 05000269/19890301989-11-0707 November 1989 Partially Withheld Insp Repts 50-269/89-30,50-270/89-30 & 50-287/89-30 on 890918-22 (Ref 10CFR2.790 & 73.21).One non- Cited Violation Noted.Major Areas Inspected:Physical Security Program for Power Reactors & Mgt Effectiveness IR 05000269/19890201989-07-25025 July 1989 Partially Withheld Insp Repts 50-269/89-20,50-270/89-20 & 50-287/89-20 on 890626-30 (Ref 10CFR2.790.(d) & 73.21). Violations Noted.Major Areas Inspected:Physical Security Program for Power Reactors & Security Audit IR 05000269/19890101989-05-19019 May 1989 Partially Withheld Insp Repts 50-269/89-10,50-270/89-10 & 50-287/89-10 on 890410-14 (Ref 10CFR2.790 & 73.21). Violations Noted.Major Areas Inspected:Mgt Support,Security Program Plans & Audits & Protected & Vital Area Barriers IR 05000269/19890091989-04-10010 April 1989 Insp Repts 50-269/89-09,50-270/89-09 & 50-287/89-09 on 890306-10.No Violations Noted.Weaknesses Noted Re Data Base Used to Prepare computer-generated Work Requests.Major Areas Inspected:Design Control,Mods & Open Items IR 05000269/19890071989-03-10010 March 1989 Insp Repts 50-269/89-07,50-270/89-07 & 50-287/89-07 on 890213-17.Deviation Noted.Major Areas Inspected:Conformance to Reg Guide 1.97 Re Instrumentation for light-water-cooled Plants to Assess Conditions During & Following Accident IR 05000269/19880051988-03-21021 March 1988 Insp Repts 50-269/88-05,50-270/88-05 & 50-287/88-05 on 880217-0316.No Violations Noted.Major Areas Inspected:Maint, Operations,Surveillance,Physical Security & Design Changes PNO-II-88-013, on 880211,two Workers Slightly Contaminated W/ Radioactive Water.Caused by Approx 1,000 Gallon Leak of Radioactive Water Occurring During Maint on Valve.Workers Showered to Remove Contamination1988-02-12012 February 1988 PNO-II-88-013:on 880211,two Workers Slightly Contaminated W/ Radioactive Water.Caused by Approx 1,000 Gallon Leak of Radioactive Water Occurring During Maint on Valve.Workers Showered to Remove Contamination ML20237B2261987-12-15015 December 1987 EN-87-017A:informs That 870309 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $25,000 Withdrawn Due to Determination That Violation Did Not Occur. Violation Based on Failure of Emergency Feedwater Pumps ML20235T5821987-09-18018 September 1987 Exam Rept 50-269/OL-87-02 on 870713-23.Exam Results:Seven of Ten Reactor Operator (RO) & Eight of Nine Senior Reactor Operator (SRO) Candidates Passed Written Exam.All RO & SRO Candidates Passed Operating Exam ML20238F7081987-09-0909 September 1987 Exam Rept 50-269/OL-87-01 for Units 1,2 & 3 on 870713-17. Exam results:7 of 10 Reactor Operators & 3 of 6 Senior Reactor Operators Passed ML20236E5111987-07-14014 July 1987 EN-86-056:on 870717,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $25,000 Will Be Issued to Licensee.Action Based on Failure to Properly Implement Startup Procedure Causing Trains to Fail IR 05000269/19870101987-03-17017 March 1987 Insp Repts 50-269/87-10,50-270/87-10 & 50-287/87-10 on 870210-0309.No Violations or Deviations Noted.Major Areas Inspected:Areas of Operations,Surveillance,Maint,Followup of Events & Verification of ESF Lineups IR 05000269/19870091987-03-17017 March 1987 Insp Repts 50-269/87-09,50-270/87-09 & 50-287/87-09 on 870209-13.No Violations Noted.Major Areas Inspected:Onsite Review of Liquid & Gaseous Radwaste Programs & Review of TMI Action Items II.B.3 & II.F.1.2 ML20207T5431987-03-12012 March 1987 Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $25,000.Noncompliance Noted:Measures Not Established to Assure That Regulatory Requirements & Design Bases Correctly Translated Into Specs,Drawings & Procedures ML20207R4851987-03-0909 March 1987 EN-87-017:on 870312,notice of Violation & Proposed Imposition of Civil Penalty in Amount of $25,000 Will Be Issued to Util Based on Failure to Provide Adequate Design Control to Ensure Emergency Feedwater Pump Operability IR 05000269/19870061987-03-0909 March 1987 Insp Repts 50-269/87-06,50-270/87-06 & 50-287/87-06 on 870126-30.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp,Ongoing Repairs in Reactor Coolant Pumps & Maint & Welding Activities IR 05000269/19870041987-02-17017 February 1987 Insp Repts 50-269/87-04,50-270/87-04 & 50-287/87-04 on 870113-0209.No Violation or Deviation Noted.Major Areas Inspected:Operations,Surveillance,Maint,Verification of ESF Linups,Followup of Events & Shutdown Work in Progress ML20211A4991987-02-11011 February 1987 Notice of Violation from Insps on 870112-16 IR 05000269/19870021987-02-11011 February 1987 Partially Withheld Insp Repts 50-269/87-02,50-270/87-02 & 50-287/87-02 on 870126-30 (Ref 10CFR2.790).Violation Noted Re Inadequate App R Circuit Analysis IR 05000269/19870031987-02-10010 February 1987 Insp Repts 50-269/87-03,50-270/87-03 & 50-287/87-03 on 870112-16.Violation Noted:Failure to Adequately Evaluate Radiological Hazards 1997-09-26
[Table view] |
Inspection Report - Oconee - 1985015 |
---|
|
|
Text
.
[A F. tog %
UNITED STATES NUCLEAR REGULATORY COMMISSION
y REGloN ll n
g
,j 101 MARIETTA STREET, N.W.
ATLANTA. GEORGI A 30323
e,,,,**
M 99 MS Report Nos.:
50-269/85-15, 50-270/85-15, and 50-287/85-15 Licensee: Duke Power Company 422 South Church Street Charlotte, NC 28242 Docket Nos.: 50-269, 50-270, and 50-287 License Nos.:
DPR-38, DPR-47, and DPR-55 Facility Name: Oconee 1, 2, and 3
.,
Inspection Conducte
.une,17-20, 1985 Inspectors:
'e ewe.
<sd
/7/.#
4"
,
A. L.' un j ghaig
~
0afe SM ned AE A
Af
.
i
/ g W. M~.'S r
~
Dit4 Sigtfed -
h'M. R.~ Poston-Bro ~wn V n
.
'/dH
/W W d9Y'
'Da'tf Sigfied Accompanying Personnel:
E. A. King T. P. Lynch D. B. Stockton Approved by:
Ze/
W E. Cline,T ction Chief
' D' ate' S fgned-Division of Radiation Safety and Safeguards SUMMARY Scope: This routine, announced inspection entailed 168 inspector-hours on site in the area of emergency preparedness exercise.
>Q Results: No violations or deviations were identified.
/
8500010578 850709 PDR ADOCK 05000269 PDR
_
.
.
REPORT DETAILS 1.
Persons Contacted Licensee Employees
- M. Tuckman, Station Manager
- T. Barr, Superintendent of Technical Services
- R. Band, Compliance Engineer
- R. E. Harris, System Emergency Planner
- C. C. Jennings, Site Emergency Coordinator
- C. Young, Radiation Protection Coordinator
- R. Bowser, Shift Supervisor (HP)
- J. E. Owens, Health Physicist
- M. D. Wright, I&E Supervisor
- D. Robinson, Shift Supervior (HP)
- M. Bolch, Catawba Emergency Preparedness Coordinator Other licensee employees contacted included construction craftsmen, engineers, technicians, operators, mechanics, security force members, and office personnel.
NRC Resident Inspector
- Attended exit interview 2.
Exit Interview The inspection scope and findings were summarized on June 20, 1985, with those persons indicated in paragraph 1 above.
The inspector described the areas inspected and discussed in detail the inspection findings listed below.
No dissenting comments were received from the licensee.
The licensee did not identify as proprietary any of the material provided to or reviewed by the inspectors during this exercise.
3.
Licensee Action on Previous Enforcement Matters No previous enforcement matters regarding emergency preparedness remained outstanding.
4.
Unresolved Items Unresolved items were not identified during the inspectio.
.
(
)
i I
I 5.
Exercise Scenario (82301)
The scenario for the emergency exercise was reviewed to assure that provisions were made to test the integrated capability and a major portion of the basic elements defined in the licensee's emergency plan and organization pursuant to 10 CFR 50.47(b)(14), paragraph IV.F of Appendix E to 10 CFR 50, and specific criteria defined in Section II.N of NUREG 0654, Revision 1.
The scenario was reviewed in advance of the scheduled exercise date and was discussed in detail with licensee representatives on June 18, 1985. While no major problems with the scenario were identified, some inconsistencies became apparent during the exercise.
The inconsistencies, however, failed to detract from the overall performance of the licensee's emergency organization.
The scenario developed for this exercise was detailed, and fully exercised the onsite emergency organizations.
The scenario also provided sufficient information to the State and local government agencies consistent with the scope of their participation in the exercise.
The licensee made a significant commitment to training and personnel through use of controllers, evaluators, and other required specialists participating in the exercise.
The controllers appeared to provide adequate guidance throughout the exercise; however, prompting and frequent dialogue between controllers and players was observed by the inspectors and licensee observers.
This finding was identified by the licensee during their controller / evaluator critique.
The item was fully discussed by the group, and additional training regarding required interaction, and limits thereof, between controllers and players was assigned corrective action.
This matter will be reviewed during a future exercise (85-15-01).
No violations or deviations were identified.
6.
Drill Scenario (82301)
Scenarios for the fire and medical emergency drills were reviewed to assure that provisions were made to test specific functions in the licensee's emergency plan pursuant to 10 CFR 50.47(b)(14), paragraph IV.F of Appendix E to 10 CFR 50, and specific criteria defined in Section II.N of NUREG 0654.
The scenarios developed for the drills were detailed and adequately exercised the participating licensee organization and offsite local emergency agencies.
The scenarios provided sufficient information to local support agencies consistent with the scope of their participation in the drills.
The licensee and offsite support agencies made a significant commitment to training and personnel by use of controllers, evaluators, and specialists participating in the drills.
The controllers provided adequate guidance L
-
.
.
throughout the drills.
No significant problems were disclosed regarding the scenarios for the subject drills.
No violations or deviations were identified.
7.
Assignment of Responsibility (82301)
This area was observed to assure that primary responsibilities for emergency response by the licensee were specifically established, and that adequate staff was available to respond to an emergency pursuant to 10 CFR 50.47(b)(1), paragraph IV. A of Appendix E to 10 CFR 50, and specific criteria defined in Section II.A of NUREG 0654, Revision 1.
The inspectors observed that specific emergency assignments were made for the licensee's emergency response or0anization, and that adequate staff was available to respond to the simulated emergency.
The initial response organization was augmented by designated licensee representatives; however, because of the scenario scope and conditions, long term or continuous staffing of the emergency response organization was not required.
Discussions with licensee representatives indicated that sufficient technical staff was available to provide for continuous staffing of the
-
augmented emergency organization if needed.
The inspectors also observed the activation, staffing, and operation of the emergency organization in the TSC and OSC.
At each response center, the required staffing and assignment of responsibility appeared to be consistent with the licensee's approved procedures.
No violations or deviations were identified.
8.
Onsite Emergency Organization (82301)
The licensee's onsite emergency organization was observed to assure that the following requirements were implemented pursuant to 10 CFR 50.47(b)(2),
paragraph IV.A of Appendix E to 10 CFR 50, and specific criteria promulgated in Section II.B of NUREG 0654, Revision 1:
(1) responsibilities for emergency response were unambiguously defined; (2) adequate staffing was provided to assure initial facility accident response in key functional areas at all times; (3) onsite and offsite support organizational interactions were specified.
The inspectors observed that the initial onsite emergency organization was adequately defined and that staff was available to fill key functional positions within the emergency organization.
Augmentation of the initial emergency response organization was accomplished through mobilization of off-shift personnel.
The on-duty Shift Supervisor assumed the duties of Emergency Coordinator promptly upon initiation of the simulated emergency and directed the response until relieved by the Station Manager.
.
.
__.
.
-_
--
_
.
.
Required interactions between the licensee's emergency response organization and State and local support agencies were adequate and consistent with the scope of the exercise.
No violations or deviations were identified.
9.
Emergency R.sponse Support and Resources (82301)
This area was observed to assure that the following arrangements for requesting and effectively using assistance resources were made pursuant to 10 CFR 50.47(b)(3), paragraph IV. A of Appendix. E to 10 CFR 50, and Section II.C of NUREG 0654, Revision 1, namely:
(1) accommodation of State and-local staff at the licensee's near-site Emergency Operations Facility; (2)
organizations capable of augmenting the planned response were identified.
Licensee contact with offsite organizations was conducted in accordance with approved p*ocedures and was consistent with the scope of the exercise.
Assistance resources from State and local agencies were available to the licensee.
No violati9ns or deviations were identified.
10.
Emergency Classification System (83201)
This area was observed to assuce that a standard emergency classification and action level scheme was in use by the licensee pursuant to 10 CFR 50.47(b)(4), paragraph IV.C of Appendix E to 10 CFR 50, and specific criterie promulgated in Section II.D of NUREG 0654, Revision 1.
An emergency action level matrix was used to promptly identify and properly classify the emergency and escalate to more severe emergency classifications as the simulated emergency prog ~ressed.
Licensee actions in this area were considered adequate.
An inspector observed that the emergency classification system used was consistent with the Radiological Emergency Plan and Implementing Procedures.
The system appeared to be adequate for classification of the simulated accident.
The respective emergency procedures provided for initial and continuing mitigating actions during the simulated emergency.
i No violations or deviations were identified.
11.
Notification Methods and Procedures (82301)
This area was observed to assure that procedures were established for notification of State and local response organizations and emergency personnel by the licensee, and that the content of initial and followup messages to response organizations were established.
This area was further observed to assure that means to provide early notification to the populace within the plume exposure pathway were established pursuant to
,-
,
,. _ -
, - _.
_ -
_.
-
..
-.. -
- _._ ___
.
m
.
10 CFR 50.47(b)(5), paragraph IV.D of Appendix E to 10 CFR 50, and specific criteria defined in Section II.E of NUREG 0654, Revision 1.
An inspector observed that notification methods and procedures were established and available for use in providing information concerning the simulated emergency conditions to Federal, State, and local response organizations, and to alert the licensee's augmented emergency response organizations.
Notification of the State of South Carolina and local offsite organizations was completed within 15 minutes following declaration of each emergency classification.
The NRC was notified within one hour following declaration of each emergency classification.
Telephone notification of State and local response organizations was promptly followed by transmission of hard copies of the notification to those organizations.
The copies included the recommended protective actions when necessary.
The prompt notification system (PNS) for alerting the public within the plume exposure pathway was in place; however, consistent with the scope of the exercise, this system was not actuated.
The licensee is planning a full cycle test of the system in conjunction with State and local authorities later this summer.
No violations or deviations were identified.
12.
Emergency Communications (82301)
This area was observed to assure that provisions existed for prompt communications among principal response organizations and emergency personnel pursuant to 10 CFR 50.47(b)(6), paragraph IV.E of Appendix E to 10 CFR 50, and specific criteria promulgated in Section II.F of NUREG 0654, Revision 1.
The inspector observed communications within and between the licensee's emergency response facilities (control room, TSC, OSC), between the licensee and offsite agencies, and between the offsite environmental monitoring teams and the TSC.
The inspectors also observed information flow among various groups within the licensee's emergency organization.
Emergency communica-tions were adequate and consistent with the scope of the exercise.
No violations or deviations were identified.
13.
Emergency Facilities and Equipment (82301)
This area was observed to assure that adequate emergency facilities and equipment to support an emergency response were provided and maintained pursuant to 10 CFR 50.47(b)(8), paragraph IV.E of Appendix E to 10 CFR 50, and specific criteria defined in Section II.H of NUREG 0654, Revision 1.
The inspectors observed the activation, staffing, and operation of the emergency response facilities, and evaluated the equipment provided for
-
.
emergency use during the' exercise.
Emergency response facilities activated during the exercise included the control room, technical support center (TSC), and operations support center (OSC).
!a.
Control Room - The inspector observed that reactor control room operations personnel acted promptly to initiate required responses to the simulated emergency.
Emergency procedures were readily available, routinely followed, and factored into accident assessment and
. mitigation exercises.
Control Room personnel involvement was essentially limited to those personnel assigned routine and special operational duties.
It was noted, however, that-the number of controllers, evaluators and observers resulted in periodic overcrowding of the facility and significant. increases in ambient noise level.
This finding was identified by NRC and licensee - observers.
During the licensee controller / evaluator critique, the licensee recommended that the number of controllers and evaluators be reduced to preclude overcrowding and attending elevated ambient noise level.
The shift supervisor and control room operators were cognizant of their duties, responsibilities, and authorities.
These personnel demon-strated an understanding of the emergency classification system and the proficient use of specific procedures to determine and declare the proper classification.
b.
Technical Support Center (TSC) - The TSC was activated and promptly staffed following - notification by the Coordinator of the simulated emergency conditions leading to the Alert classification.
The facility staff appeared to be knowledgeable concerning their emergency duties, authorities, and responsibilities, and the required operation appeared acceptable.
This facility was provided with adequate equipment for support of the assigned' staff. TSC security was promptly established.
Status boards were strategically located to facilitate viewing by the TSC staff.
Status boards were updated as required to chronicle changes in plant status, accident assessment and mitigation throughout the exercise.
The inspectors noted that a status board dedicated to trending of simulated plant systems and engineering data was maintained and updated during the accident sequence.
Security personnel were posted to limit and control access to the
'
facility and preclude overcrowding.
It was noted that the ambient l
noise level within the facility was very high.
This conditions was further aggravated by -routine radio communications conducted between
!;
the.TSC dose assessment group and the offsite monitoring teams. This l
item was identified and discussed during the licensee controller /
l evaluator critique and the presentation of findings during the exit critique.
It was also noted, however, that high ambient noise level posed no impediment-to normal conduct of TSC operation.
The licensee p
!
.
.
planned to review methods of ambient noise reduction within the facility.
c.
Operations Support Center (OSC)
The OSC was promptly staffed
-
following activation of the emergency plan by the Emergency Coordina-tor.
An inspector obseWed that teams were promptly assembled, briefed, and prepared for deployment.
The OSC Supervisor appeared to be cognizant of his duties and responsibilities.
The NRC inspectors and licensee observers noted, however, that improvements in the following areas were indicated, namely:
routine briefing of OSC staff of plant status during the exercise; logging of status and location of OSC teams; frequency of updating OSC status boards; and location of OSC dose assessment group status boards.
These items were discussed during the licensee controller / evaluator and exit critiques.
14.
Accident Assessment (82301)
This area was observed to assure that adequate methods, systems, and equipment for assessing and monitoring actual or potential offsite consequences of a radiological emergency condition were in use as required by 10 CFR 50.47(b)(9), paragraph IV.B of Appendix E to 10 CFR 50, and specific criteria promulgated in Section II.I of NUREG 0654, Revision 1.
The accident assessment program included an engineering assessment of plant status, and an assessment of radiological hazards to onsite and offsite personnel resulting from the accident.
During the exercise, the engineering accident assessment team functioned adequately in analyzing the plant status to provide recommendations to the Site Emergency Manager concerning mitigating actions required to reduce damage to plant equipment, prevent releases of radioactive materials, and terminate the emergency condition.
Radiological assessnent activities involved several groups.
An inplant group was effective in estimating the radiological impact within the plant based on inplant monitoring and onsite measurements.
Offsite radiological monitoring teams were dispatched to determine the level of radioactivity in those areas within the path of the plume.
Radiological effluent data was received in the TSC.
The offsite dose assessment and protection calculations were consistent with scenario values.
It was observed however, that monitoring of the plume was inadequate.
Offsite monitoring teams failed to define the plume centerline and determine plume dimensions.
This item will be reviewed during future exercises (85-15-02).
Routine inventory and verification of the contents of monitoring kits issued to offsite radiation monitoring team personnel was conducted by each team member prior to deployment.
Listing of required contents of each kit was
,
l provided.
It was also noted that current procedures provided for quarterly
!
inspection, inventory and operational check of equipment and instruments in each kit.
I l
L
r
.
.
Use of the post-accident sample system (PASS) was not included in the scope of the exercise.
Health physics coverage was provided for all aspects of the exercise and ALARA practices were employed.
No violations or deviations were identified.
15.
Protective Response This area was observed to determine that guidelines for protective actions, consistent with federal guidance, were developed and in place, and protective actions for emergency workers, including evacuation of non essential personnel, were implemented promptly as required by 10 CFR 50.47(b)(10) and specific criteria promulgated in Section II.J of NUREG 0654, Revision 1.
The inspector observed the licensee's program for personnel accountability.
The inspector noted that upon sounding of the site evacuation alarm, personnel appeared to proceed promptly to designated assembly points.
Initial accountability appeared to be completed in about 20 minutes.
Accountability was continued, however, until all personnel were accounted for.
This test was completed approximately 30 minutes after initial accountability check.
The protective measures decision making process was observed by the inspectors.
Recommendations implemented by the Control Room and TSC were timely, adequate and consistent with the above criteria.
Protective measures recommendations were provided by the licensee to the State of South Carolina and local offsite organizations consistent with the scope of the exercise scenario.
No violations or deviations were identified.
16.
Radiological Exposure Control (82301)
.
This area was observed to determine that methods for controlling radio-
'
logical exposures in an emergency were established and implemented for emergency workers, and that such methods included exposure guidelines
'
consistent with EPA recommendations as required by 10 CFR 50.47(b)(11), and specific criteria defined in Section II.K of NUREG 0654 Revision 1.
An inspector noted that the radiological exposures were controlled throughout the exercise by issuing supplemental dosimeters to emergency workers and by conducting periodic radiological surveys in the emergency response facilities.
Exposure guidelines were in place for various categories of emergency actions, and adequate protective clothing and respiratory protection were available for use as required.
Health Physics control of radiation exposure, contamination control, and radiation area access appeared adequate.
Health Physics supervisors were l
observed to brief survey teams adequately.
Dosimetry was available and was used.
High range dosimeters were available if needed.
A communicator and l
L
I
,
.
data logger were established at the health physics access point and appeared to function in a satisfactory manner.
No violations or deviations were identified.
17.
Exercise Critique (82301)
The licensee's critique of the emergency exercise was observed to assure that shortcomings identified as part of the exercise were brought to the
attention of management for corrective action, as required by 10 CFR 50.47(b)(14),
10 CFR 50, Appendix E, paragraph IV.F, and the specific criteria in NUREG 0654,Section II.N.
A formal critique was held on June 20, 1985, with exercise controllers and observers, licensee management, and NRC representatives.
Weaknesses identified during the exercise and plans for corrective action were discussed.
Licensee action on weaknesses identified will be reviewed during a subsequent inspection.
Observat. ion of the licensee controller / evaluator i
critique, held prior to the exit critique, was included as part of the exercise evaluation.
Observation disclosed that the licensee conducted a detailed critique of the exercise and operation of the emergency response facilities.
The critique included identification and discussion of weaknesses and required improvements, documentation thereof, and required
corrective actions.
All finding were summarized during the exit critique.
<
No violations or deviations were identified.
18.
Inspector Followup (92701)
a.
(Closed) Inspector Followup Item (IFI) 50-269, 270, 287/82-08-04:
<
Correct weaknesses identified in emergency communications.
Observation of radio-communications between the OSC and offsite monitoring teams were adequate both in content and signal strength, b.
(Closed) Inspector Followup Item (IFI) 50-269, 270, 287/82-08-08:
Develop methods for estimating concentrations in containment or to relate containment activity to potential offsite exposure rates.
Inspection confirmed that procedures were developed for offsite dose calculations and projections (AP/0/8/1000/07), and factoring of such results into the protective action decision making process.
c.
(Closed) Inspector Followup Item (IFI) 50-269, 270, 287/83-10-04:
Maintaling a valid estimate of plant conditions during an emergency.
d.
(Closed) Inspection Followup Item (IFI) 50-269, 270, 287/83-10-06:
Provide additional training for health physicists who do offsite monitoring.
Inspection of training records confirmed that additional training of offsite monitoring personnel was completed to assure correct usage of monitoring equipment, retrival of environmental samples, and attention to required monitoring of personnel dosimetr t-
.
O
.
e.
(Closed) Inspector Followup Item (IFI) 50-269, 270, 287/83-27-02:
Control room operator training on dose code.
Inspection of respective training records confirmed that suggested training was implemented.
f.
(Closed) Inspector Followup Item IFI 50-269, 270, 287/83-27-03:
Protective Action Guide Lifesaving dose changed to 75 rem.
Review of procedures confirmed that the cited change was implemented (RP/0/8/1000/11).
g.
(Closed) Inspector Followup Item (IFI) 50-269/84-14-01, 50-270/84-16-01, 287/84-16-01.
Planning for emergency worker protection.
Procedural review confirmed that required planning was implemented.
h.
(Closed) Inspector Followup Item (IFI) 50-269, 270, 287/84-21-02:
Recommend instead of " consider" in RP/0/8/1000/06.
Inspection confirmed that above change was implemented and approved on April 30, 1985.
i.
(Closed) Inspector Followup Item (IFI) 50-269, 270, 287/84-21-03:
Scope of audit of interfaces with State and local agencies.
This item was reviwed and found to be adequate.
j.
(Closed) Inspector Followup Item (IFI) 50-269, 270, 287/84-21-01:
Training emphasis on procedural formulation of protective action recommendations.
Inspector reviewed licensee training packages.
Review confirmed that required training was implemented.
K.
(Closed) IE Bulletin 80-BU-15; 50-270, 50-287:
Loss of emergency notification system with loss of offsite power.
The inspector reviewed licensee action on this matter.
The inspector determined that the licensee had adequate provisions for dealing with this potential problem.
.