IR 05000269/1985006
| ML20128L020 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 06/07/1985 |
| From: | Walker R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| References | |
| NUDOCS 8507110197 | |
| Download: ML20128L020 (1) | |
Text
y-if Y &
an 71985 Duke Power Company ATTN: Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte', NC 28242 Gentlemen:
SUBJECT:
REPORT NOS. 50-269/85-06, 50-270/85-06 AND 50-287/85-06 Thank you for your response of May 23, 1985, to our Notice of Violation issued on April 19, 1985, concerning tctivities conducted at your Oconee facility. We have evaluated your response and found that it meets the requirements of 10 CFR 2.201.
We will examine the implementation.of your corrective actions during future inspections.
We appreciate your cooperation in this matter.
Sincerely, Original Signed by R.D. Walker Roger D. Walker, Director Division of Reactor Projects cc:
M. S. Tuckman, Station Manager bec: NRC Resident Inspector Document Control Desk State of South Carolina hl h
RI g RII RII Eco Sos:dr
e AHe PB s
VB wnlee
!4/
-
6/g/85 6/f/85 6/&/85 6/ /85 8507110197 850607 I0
,
PDR ADOCK 05000269 i
G PDR ZEol l