Notice of Violation from Insp on 850629-0726
ML20134H443
Person / Time
Site: Hatch, 05000629  Southern Nuclear icon.png
Issue date: 08/14/1985
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20134H439 List:
References
50-321-85-22, 50-366-85-22, NUDOCS 8508280417
Download: ML20134H443 (2)


See also: IR 05000629/2007026

Text

.

.

'

.

ENCLOSURE 1

NOTICE OF VIOLATION

Georgia Power Company " Docket Nos. 50-321 and 50-366

Hatch 1 and 2 License Nos. DPR-57 and NPF-5 ,

The following violations were identified during an inspection conducted on

June 29 - JJ1y 26, 1985. The. Severity Levels were assigned in accordance with

the NRC Enforcement Policy (10 CFR Part 2, Appendix C).

1. 10 CFR 50, Appendix B, Criterion X, as implemented by Section A.33 of the

Hatch Unit 2 FSAR, requires the licensee to comply with ANSI N18.7-1976.

Section 5.2.7 of ANSI N18.7-1976 specifies that maintenance and modifi-

cations which may affect functioning of safety-related systems be performed

in a manner to ensure quality at least equivalent to that specified in

original design bases and requirements. It also specifies that a suitable

level of confidence in systems on which maintenance or modifications have

been performed shall be attained by appropriate inspection.

Contrary to the above, the bypass valve (2E11-F1228) for the residual heat

removal system check valve (2E11-F0508) was found not to contain all of its

internal parts when opened on April 10, 1985. This bypass valve had been

disassembled during the 1984 Unit 2 outage and no documented work had been

performed on 2E11-F122B since that outage and prior to April 10, 1985.

This is a Severity Level IV violation (Supplement I) for Unit 2 only.

2. Technical Specification 6.8.1.C requires that written procedures .be

implemented and maintained covering surveillance and test activities of

safety-related equipment.

Contrary to the above, the following safety-related calibration procedures

incorrectly referenced the filing codes, which are used to locate vendor

technical manuals in the site document room:

a. HNP-1-5251, Revision 11, and HNP-2-5251, Revision 5, General Electric

Type 547 Self Synchronizing Manual / Automatic Transfer Station.

b. HNP-2-5255, Revision 2, GE 562 Limiter Calibration.

c. HNP-2-5273, Revision 6, Model 195-4 Mercoid Level Switch,

d. HNP-1-5261, Revision 16, Agastat Timing Relay Calibration.

This is a Severity Level V violation (Supplement I) for Units 1 and 2.

C508280417 850814

PDR ADOCK 05000321

0 PDR

___ _

t .-

t -

.

Georgia Power Company 2 Docket Nos. 50-321 and 50-366

Hatch 1 and 2 License Nos. DPR-57 and NPF-5

Pursuant to 10 CFR 2.201, you are required to submit to this office within 30

days of the date of this Nott'ce, a written statement or explanation in reply,

including: (1) admission or denial of the alleged violations; (2) the reasons

for the violations if admitted; (3) the corrective steps which have been taken

and the results achieved; (4) corrective steps which will be taken to avoid ,

'

further violations; and (5) the date when full compliance will be achieved.

Security or. safeguards information should be submitted as an enclosure to

facilitate withholding it from public disclosure as required by 10 CFR 2.790(d)

or 10 CFR 73.21.