Letter Sequence Withholding Request Acceptance |
---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Administration
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: ML070370281, ML073100027, ML073510180, ML080360067, ML080430700, ML080500171, ML080530256, ML081010450, ML081010451, ML081120502, ML081700294, ML081720078, ML081760295, ML082040065, ML082050462, ML082100425, ML082810470, ML083120308, ML083240224, ML083250083, ML090130718, ML090340528, ML090720951, ML090760630, ML091320366, ML092020345, ML092430520, ML092440518, ML092460495, ML092460496, ML092460497, ML092460498, ML092460500, ML092540483, ML092680057, ML12319A076, ML13044A498
|
MONTHYEARML0711503712007-04-24024 April 2007 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Steam Dryer Evaluations Project stage: Request ML0712905652007-05-16016 May 2007 Withholding Information from Public Disclosure, Response to Nuclear Regulatory Commission (NRC) Request for Additional Information - Round 12 for Browns Ferry EPU: Supplemental to SBWB-64 Project stage: RAI ML0716303492007-06-15015 June 2007 Meeting with the Tennessee Valley Authority Concerning the Status of Browns Ferry Nuclear Plant, Units 1, 2 and 3, Steam Dryer Review Project stage: Meeting ML0718700242007-07-0303 July 2007 Technical Specifications (TS) Change TS-461 - Modification of Restart Large Transient Testing License Condition 2. (G) 2 - Supplement 1 Project stage: Request ML0717801902007-07-0505 July 2007 Request for Additional Information for Extended Power Uprate - Round 13 (TS-431 and TS-418 (TAC Nos. MD5262, MD5263, and MD5264) Project stage: RAI ML0719004762007-07-10010 July 2007 Meeting with the Tennessee Valley Authority (TVA) Concerning the Pending ACRS Meeting on the Browns Ferry Extended Power Uprate Project stage: Meeting ML0721501562007-07-18018 July 2007 Slides from Meeting with Tennessee Valley Authority on the Browns Ferry Power Uprate ACRS Presentation Project stage: Meeting ML0721303712007-07-27027 July 2007 Technical Specifications Changes TS-431 and TS-418, Extended Power Uprate - Steam Dryer Evaluations Project stage: Request ML0721400442007-08-0808 August 2007 Summary of Meeting with Tennessee Valley Authority on the Browns Ferry Power Uprate ACRS Presentation Project stage: Meeting ML0724805472007-08-31031 August 2007 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Round 13 Request for Additional Information (RAI) - Containment Overpressure Project stage: Request ML0727606602007-10-0909 October 2007 Request for Additional Information for Extended Power Uprate - Round 14 (TS-418) Project stage: RAI ML0728902372007-10-18018 October 2007 Request for Withholding Information from Public Disclosure Concerning Round 13 Request for Additional Information for Browns Ferry Nuclear Plant (Tac Nos. MD5262, MD5263 and MD5264) Project stage: RAI ML0729603112007-10-22022 October 2007 Technical Specification (TS) Changes TS-431 & TS-418, Extended Power Uprate - EPU Large Transient Testing Project stage: Request ML0731000272007-11-0909 November 2007 Request for Schedule Regarding Analysis for Steam Dryers on Extended Power Uprate Amendment Requests (TAC Nos. MD5262, MD5263, and MD5264) (TS-431 and TS-418-S) Project stage: Other ML0732303482007-11-15015 November 2007 Units 1, 2, and 3 - Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Round 13 Request for Additional Information (RAI) - Containment Overpressure APLA-35/37 Project stage: Request ML0733304832007-11-21021 November 2007 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Preliminary Findings on Steam Dryer Stress Analysis Project stage: Request ML0735101802007-12-14014 December 2007 Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Schedule Regarding Analysis for Steam Dryers Project stage: Other ML0734607572007-12-19019 December 2007 Request for Withholding Information from Public Disclosure for Browns Ferry Nuclear Plant (Tac No. MD5262, MD5263 and MD5264) Project stage: Withholding Request Acceptance ML0735400102008-01-25025 January 2008 Summary of Meeting with Tennessee Valley Authority on Steam Dryer Portion of the Extended Power Uprate Review (TAC Nos. MD5262, MD5263, and MD5264), Browns Ferry Units 1, 2, and 3 Project stage: Meeting ML0801504182008-01-25025 January 2008 Plants, Units 1, 2, and 3 - (Public Version) - Summary of December 10, 2007 Meeting with TVA on Steam Dryer Portion of the Extended Power Uprate Review Project stage: Meeting ML0803205212008-01-25025 January 2008 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) Response to Round 15 Request for Additional Information (RAI) - APLA-38/40, SRXB-71, and SRXB-72 Project stage: Request ML0803600672008-01-25025 January 2008 Steam Dryer RAI 15 Status, Slides Project stage: Other ML0802501652008-01-30030 January 2008 Request for Withholding Information from Public Disclosure for Browns Ferry Nuclear Plant (Tac Nos. MD5262, MD5263, and MD5264) Project stage: Withholding Request Acceptance ML0803805602008-01-31031 January 2008 Technical Specifications (TS) Change TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Round 15 Request for Additional Information (RAI) Regarding Steam Dryer Analyses Project stage: Request ML0804307002008-02-11011 February 2008 Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Schedule Regarding EPU Project stage: Other ML0803503812008-02-14014 February 2008 Summary of Meeting with Tennessee Valley Authority - on Extended Power Uprate Review Project stage: Meeting ML0805302562008-02-21021 February 2008 Unit 1 - Technical Specifications (TS) Change TS-431 - Extended Power Uprate (EPU) - Fuels Methods Commitments Project stage: Other ML0806501012008-02-21021 February 2008 Response to Round 16 Request for Additional Information SRXB-73 Project stage: Request ML0804506472008-02-27027 February 2008 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML0803506982008-02-29029 February 2008 Request for Additional Information for Extended Power Uprate - Round 16 (TS-431 and TS-418) (TACs MD5262, MD5263, MD5264) Project stage: RAI ML0807104982008-03-0606 March 2008 (BFN) - Units 1, 2, and 3 - Technical Specifications (TS) Change TS-418 and TS-431 - Extended Power Uprate (EPU) - Response to Round 16 Request for Additional Information (RAI) - SRXB-74/86 and SRXB-87 Through SRXB-90 Project stage: Request ML0811205102008-03-20020 March 2008 Summary of March 20, 2008, Meeting with Tennessee Valley Authority Regarding Steam Dryer Portion of the Extended Power Uprate Review (TAC Nos. MD5262, MD5263, and MD5264) - Slides Project stage: Meeting ML0810104512008-04-0404 April 2008 Technical Specifications (TS) Changes TS-431 and TS-418 Extended Power Uprate (EPU) BFN Steam Monitoring Plan Project stage: Other ML0810104502008-04-0404 April 2008 (BFN) - Units 1, 2, and 3 - Technical Specifications (TS) Changes TS-431 and TS-418 - Extended Power Uprate (EPU) - Response to Round 15 and Round 16 Requests for Additional Information (RAI) Regarding Steam Dryer Analyses Project stage: Other ML0817602952008-04-0909 April 2008 Units 1, 2, & 3 - Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Confirmation of Commitment Completions Project stage: Other ML0811205022008-04-16016 April 2008 CDI Incoming Letter Dated April 16, 2008 Regarding NRC Presentation Entitled, Tennessee Valley Authority Browns Ferry Nuclear Plant - Extended Power Uprate Steam Dryers. Project stage: Other ML0811302312008-04-17017 April 2008 Public Slides - Summary of April 17, 2008, Meeting Regarding Steam Dryer Portion of the Extended Power Uprate Review, Project stage: Meeting ML0811200332008-04-30030 April 2008 Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Withholding Information from Public Disclosure for Round 15 Fuels Responses Project stage: Withholding Request Acceptance ML0812806272008-05-0101 May 2008 Technical Specifications Change TS-418, Extended Power Uprate Supplemental Response to Round 16 Request for Additional Information - SRXB-87 & SRXB-89 Project stage: Supplement ML0813502222008-05-0202 May 2008 Request for Additional Information for Extended Power Uprate - Round 17 (TS-431 and TS-410) Project stage: RAI ML0805001712008-05-0202 May 2008 - Schedule Regarding Analysis for Steam Dryers on Extended Power Uprate Amendment Requests (TAC Nos. MD5262, MD5263, and MD5264) (TS-431 and TS-418) Project stage: Other ML0812804712008-05-0202 May 2008 Request for Additional Information for Extended Power Uprate - Round 17 Project stage: RAI ML0813602912008-05-22022 May 2008 Summary of April 17, 2008, Meeting Regarding Steam Dryer Portion of the Extended Power Uprate Review Project stage: Meeting ML0815805532008-05-22022 May 2008 Summary of 5/22/08 Meeting Regarding Containment Overpressure Portion of the Extended Power Uprate Review - Browns Ferry - Handouts Project stage: Meeting ML0810604452008-06-0202 June 2008 Request for Withholding Information from Public Disclosure for Partial Round 13 Responses (Tacs. MD5262, MD5263 and MD5264) Project stage: Withholding Request Acceptance ML0810606162008-06-0202 June 2008 Request for Withholding Information from Public Disclosure for Browns Ferry Nuclear Plant Project stage: Withholding Request Acceptance ML0810607222008-06-0202 June 2008 Request for Withholding Information from Public Disclosure for Partial Response to Round 13 Project stage: Withholding Request Acceptance ML0816403252008-06-0303 June 2008 Units 2 & 3 - Technical Specifications Change TS-418 - Extended Power Uprate - Supplemental Response to Round 16 Request for Additional Information - SRXB-88 Project stage: Supplement ML0812607122008-06-0505 June 2008 Summary of Meeting with TVA Steam Dryer Portion of the Extended Power Uprate Review Project stage: Meeting ML0817002942008-06-12012 June 2008 Technical Specifications Changes TS-431 and TS-418 - Extended Power Uprate - Response to ACRS Conclusions and Recommendations Regarding Containment Overpressure Credit Project stage: Other 2008-01-30
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000259/20240102024-11-12012 November 2024 Design Basis Assurance Inspection Program Inspection Report 05000259/2024010 and 05000260/2024010 and 05000296/2024010 IR 05000259/20240032024-11-0404 November 2024 Integrated Inspection Report 05000259/2024003 and 05000260/2024003 and 05000296/2024003 CNL-24-043, Application for Subsequent Renewed Operating Licenses, Second Safety Supplement2024-11-0101 November 2024 Application for Subsequent Renewed Operating Licenses, Second Safety Supplement ML24305A1692024-10-31031 October 2024 Site Emergency Plan Implementing Procedure Revision 05000259/LER-2024-003, Valid Specified System Actuation Caused the Automatic Start of Emergency Diesel Generators2024-10-29029 October 2024 Valid Specified System Actuation Caused the Automatic Start of Emergency Diesel Generators 05000259/LER-2024-001-02, Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure2024-10-28028 October 2024 Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure ML24299A2632024-10-25025 October 2024 Response to Apparent Violation in NRC Inspection Report 05000260/2024090, EA-24-075 ML24289A1232024-10-24024 October 2024 Letter to James Barstow Re Environmental Scoping Summary Report for Browns Ferry CNL-24-074, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-10-23023 October 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24308A0042024-10-16016 October 2024 Ahc 24-1578 Environmental Review of the Browns Ferry Nuclear Plant, Units 1, 2 and 3 Subsequent License Renewal Application Limestone County CNL-24-077, Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 12024-10-0909 October 2024 Application for Subsequent Renewed Operating Licenses, Response to Request for Additional Information, Set 1 ML24270A2162024-09-27027 September 2024 Notice of Intentions Regarding Preliminary Finding from NRC Inspection Report 05000260/2024090, EA-24-075 ML24262A1502024-09-24024 September 2024 Requalification Program Inspection - Browns Ferry Nuclear Plant CNL-24-060, Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description2024-09-24024 September 2024 Supplement to Request for Approval of the Tennessee Valley Authority Nuclear Quality Assurance Program Description ML24262A0602024-09-23023 September 2024 Summary of August 19, 2024, Meeting with Tennessee Valley Authority Regarding a Proposed Supplement to the Tennessee Valley Authority Nuclear Quality Assurance Plan ML24263A2952024-09-19019 September 2024 Site Emergency Plan Implementing Procedure Revision CNL-24-065, Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-09-18018 September 2024 Tennessee Valley Authority – Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000260/20240902024-09-17017 September 2024 NRC Inspection Report 05000260/2024090 and Preliminary White Finding and Apparent Violation - 1 CNL-24-062, Cycle 16 Reload Analysis Report2024-09-16016 September 2024 Cycle 16 Reload Analysis Report ML24255A8862024-09-10010 September 2024 Core Operating Limits Report for Cycle 16 Operation, Revision 0 IR 05000259/20244042024-09-0303 September 2024 Cyber Security Inspection Report 05000259/2024404 and 05000260-2024404 and 05000296/2024404-Cover Letter ML24239A3332024-09-0303 September 2024 Full Audit Plan IR 05000259/20240052024-08-26026 August 2024 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2024005, 05000260/2024005 and 05000296/2024005 ML24225A1682024-08-16016 August 2024 – Notification of Inspection and Request ML24219A0272024-08-0606 August 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000259/20244022024-08-0606 August 2024 Security Baseline Inspection Report 05000259/2024402 and 05000260/2024402 and 05000296/2024402 IR 05000259/20240022024-08-0202 August 2024 Brown Ferry Nuclear Plant – Integrated Inspection Report05000259/2024002 and 05000260/2024002 and 05000296/2024002 ML24199A0012024-07-22022 July 2024 Clarification and Correction to Exemption from Requirement of 10 CFR 37.11(c)(2) ML24172A1342024-07-15015 July 2024 Exemptions from 10 CFR 37.11(C)(2) (EPID L-2023-LLE-0024) - Letter ML24183A4142024-07-10010 July 2024 – License Renewal Regulatory Limited Scope Audit Regarding the Environmental Review of the License Renewal Application (EPID Number: L-2024-SLE-0000) (Docket Numbers: 50-259, 50-260, and 50-296) 05000296/LER-2024-003, Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints2024-07-0808 July 2024 Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints 05000259/LER-2024-001-01, Inoperability of Unit 3 Diesel Generator Due to Relay Failure2024-07-0303 July 2024 Inoperability of Unit 3 Diesel Generator Due to Relay Failure ML24184A1142024-07-0202 July 2024 Site Emergency Plan Implementing Procedure Revision ML24183A3842024-07-0101 July 2024 Registration of Use of Cask to Store Spent Fuel (MPC-364, -365) ML24179A0282024-06-26026 June 2024 Evaluation of Effects of Out-of-Limits Condition as Described in IWB-3720(a) 05000259/LER-2024-002, Reactor Scram Due to Generator Step-Up Transformer Failure2024-06-24024 June 2024 Reactor Scram Due to Generator Step-Up Transformer Failure ML24175A0042024-06-23023 June 2024 Interim Report of a Deviation or Failure to Comply Associated with a Valve in the Unit 3 High Pressure Coolant Injection System ML24176A1132024-06-23023 June 2024 American Society of Mechanical Engineers, Section XI, Fourth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owner’S Activity Report Cycle 21 Oper ML24089A1152024-06-21021 June 2024 Transmittal Letter, Environmental Assessments and Findings of No Significant Impact Related to Exemption Requests from 10 CFR 37.11(c)(2) ML24155A0042024-06-18018 June 2024 Proposed Alternative to the Requirements of the ASME Code (Revised Alternative Request 0-ISI-47) ML24158A5312024-06-0606 June 2024 Registration of Use of Cask to Store Spent Fuel (MPC-361, -362, -363) ML24071A0292024-06-0505 June 2024 Subsequent License Renewal Application Enclosure 3 - Proprietary Determination Letter ML24068A2612024-06-0505 June 2024 SLRA Fluence Methodology Report - Proprietary Determination Letter ML24151A6322024-05-30030 May 2024 Independent Spent Fuel Storage Installation Annual Radioactive Effluent Release Report IR 05000259/20244032024-05-22022 May 2024 – Security Baseline Report 05000259/2024403 and 05000260/2024403 and 05000296/2024403 05000260/LER-2024-002, High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation2024-05-20020 May 2024 High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A0702024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report IR 05000259/20240012024-05-14014 May 2024 Integrated Inspection Report 05000259/2024001, 05000260/2024001, and 05000296/2024001 CNL-24-040, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-05-0808 May 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revisions 2024-09-03
[Table view] Category:Proprietary Information Review
MONTHYEARML24071A0292024-06-0505 June 2024 Subsequent License Renewal Application Enclosure 3 - Proprietary Determination Letter ML24068A2612024-06-0505 June 2024 SLRA Fluence Methodology Report - Proprietary Determination Letter ML23045A1192023-02-15015 February 2023 Proprietary Determination Letter Enclosure - Browns Ferry Atrium 11 LAR Supp. 6 ML23009B7502023-02-15015 February 2023 Request for Withholding Information from Public Disclosure for Supplement 6 to Browns Ferry License Amendment Request to Transition to Atrium 11 Fuel ML23010A0932023-02-13013 February 2023 Request for Withholding Information from Public Disclosure for Supplement 7 to Browns Ferry License Amendment Request Transition to Atrium 11 Fuel ML22297A2352023-01-10010 January 2023 Request for Withholding Information from Public Disclosure Regarding Use of Atrium 11 Fuel ML22276A1012022-10-25025 October 2022 Request for Withholding Information from Public Disclosure for Supplement 4 to Browns Ferry License Amendment Request to Transition to Atrium 11 Fuel ML22276A1002022-10-0404 October 2022 Request for Withholding Information from Public Disclosure for Supplement 3 to Browns Ferry License Amendment Request to Transition to Atrium 11 Fuel ML22157A3272022-06-13013 June 2022 Request for Withholding Information from Public Disclosure ML22154A1292022-06-13013 June 2022 Request for Withholding Information from Public Disclosure ML22125A2632022-06-0101 June 2022 Request for Withholding Information from Public Disclosure for Criticality Safety Analysis of Spent Fuel Pool Storage of Atrium 11 Fuel ML19136A2782019-08-26026 August 2019 Request for Withholding Information from Public Disclosure ML19136A2542019-08-26026 August 2019 Request for Withholding Information from Public Disclosure ML19133A1192019-08-26026 August 2019 Request for Withholding Information from Public Disclosure ML19136A0582019-08-26026 August 2019 Request for Withholding Information from Public Disclosure ML19163A1652019-08-0505 August 2019 Request for Withholding Information from Public Disclosure ML19163A0802019-07-22022 July 2019 Request for Withholding Information from Public Disclosure ML19136A3282019-07-22022 July 2019 Request for Withholding Information from Public Disclosure ML19136A1342019-07-22022 July 2019 Request for Additional Information from Public Disclosure ML19008A1752019-01-15015 January 2019 Request for Withholding Information from Public Disclosure ML16305A2142016-10-31031 October 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request For Withholding Information From Public Disclosure (CAC Nos. MF6741, MF6742, MF6743) ML16292A7222016-10-26026 October 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Withholding Information from Public Disclosure (CAC Nos. MF6741, MF6742, and MF6743) ML16270A3662016-10-26026 October 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - EPU LAR GE-Hitachi Proprietary Approval Letter (CAC Nos. MF6741, MF6742, and MF6743) ML16224A1202016-09-26026 September 2016 Browns Ferry Nuclear Plant Units 1, 2, and 3 - Request For Withholding Information From Public Disclosure (CAC. Nos. MF6741, MF6742, And MF6743) ML16209A3992016-08-16016 August 2016 Request for Withholding Information from Public Disclosure ML16211A4352016-08-16016 August 2016 Request for Withholding Information from Public Disclosure ML16217A4432016-08-16016 August 2016 Request for Withholding Information from Public Disclosure ML16125A0842016-07-0707 July 2016 Approval for Request for Withholding Information from Public Disclosure ML16144A2982016-07-0707 July 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Withholding Information from Public Disclosure (CAC Nos. MF6741 and MF6742, and MF6743) ML16173A0262016-07-0707 July 2016 Approval for Request for Withholding Information from Public Disclosure ML16130A6002016-07-0707 July 2016 Request for Withholding Information from Public Disclosure ML16127A6092016-07-0606 July 2016 NRC Letter Request for Withholding Information from Public Disclosure ML16125A4062016-07-0606 July 2016 Request for Withholding Information from Public Disclosure ML16124B0062016-05-19019 May 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Withholding Information from Public Disclosure (CAC Nos. MF6741, MF6742, and MF6743) ML16123A3352016-05-16016 May 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Withholding Information from Public Disclosure (CAC Nos. MF6741, MF6742, and MF6743) ML16124B1062016-05-12012 May 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Withholding Information from Public Disclosure (CAC Nos. MF6741, MF6742, and MF6743) ML16120A0722016-05-12012 May 2016 Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Request for Withholding Information from Public Disclosure (CAC Nos. MF6741, MF6742, and MF6743) ML16124A9322016-05-12012 May 2016 Request for Withholding Information from Public Disclosure ML16027A1612016-02-0202 February 2016 Request for Withholding of Proprietary Information from Public Disclosure for Browns Ferry Nuclear Plant, Unit 1 ML16027A2312016-02-0202 February 2016 Request for Withholding of Proprietary Information from Public Disclosure for Browns Ferry Nuclear Plant, Unit 1 ML15345A0102015-12-22022 December 2015 Request for Withholding of Proprietary Information from Public Disclosure ML15289A5392015-11-0909 November 2015 Request for Withholding of Proprietary Information from Public Disclosure for Browns Ferry Nuclear Plant, Unit 3 ML15289A5822015-11-0909 November 2015 Request for Withholding of Proprietary Information from Public Disclosure for Browns Ferry Plant, Unit 3 ML15281A1682015-11-0505 November 2015 Request for Withholding of Proprietary Information from Public Disclosure for Browns Ferry Nuclear Plant, Unit 3 ML15170A3162015-09-0404 September 2015 Request for Withholding of Proprietary Information from Public Disclosure ML15044A4802015-03-16016 March 2015 Request for Withholding of Proprietary Information from Public Disclosure ML15006A3602015-01-26026 January 2015 Request for Withholding of Proprietary Information from Public Disclosure ML14352A2872015-01-0808 January 2015 Request for Withholding Information from Public Disclosure Regarding Tennessee Valley Authority Compensatory Measures That Revise the Pressure and Temperature Limits Curves ML14099A1032014-04-30030 April 2014 Request for Withholding Information from Public Disclosure for Tennessee Valley Authority Addition of Analytical Methodologies to Technical Specification 5.6.5 and Revision of Technical Specifications 2.1.1.2 in Support. ML14099A0842014-04-30030 April 2014 Request for Withholding Information from Public Disclosure for Response to Request for Additional Information on Technical Specification Change TS-478 2024-06-05
[Table view] |
Text
September 14, 2009
Mr. Preston D. Swafford
Chief Nuclear Officer and
Executive Vice President Tennessee Valley Authority
3R Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
SUBJECT:
BROWNS FERRY NUCLEAR PLANT, UNITS 1, 2 AND 3 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR BROWNS
FERRY NUCLEAR PLANT (TAC NOS. MD5262, MD5263, AND MD5264)
Dear Mr. Swafford:
By letters dated September 2 and December 8, 2008, January 16, January 23, and
February 18, 2009, the Tennessee Valley Authority (TVA) submitted affidavits dated August 29
and December 2, 2008, January 15, January 22, and February 5, 2009, respectively, executed
on behalf of Continuum Dynamics, Incorporated (CDI), requesting that information contained in
the following documents be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390:
Enclosure 1 to a letter dated September 2, 2008 -
Response to Round 19 Request for Additional Information (RAI);
Enclosure 1 to a letter dated December 8, 2008 - CDI Report No.07-11P, Dynamics of BWR Steam Dryer Components; Enclosure 1 to a letter dated January 16, 2009 -
Response to Round 23 Request for Additional Information (RAI) Regarding Steam Dryer Analysis Submodeling; Enclosure 1 to a letter dated January 23, 2009 -
Response to Round 23 Request for Additional Information (RAI) EMCB.203/164 Regarding Steam Dryer Signal Processing
- to a letter dated February 18, 2009 -
Response to Round 23 Request for Additional Information (RAI) EMCB.204/168 Regarding Steam Dryer Analyses;
N on-proprietary copies of these documents have been placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the Agencywide Documents Access and Management System Pub lic Electronic Reading Room.
Affidavits dated August 29, 2008, and January 15, January 22 and February 5, 2009, stated that
the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
(a) Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by CDI
=s competitors without license from CDI constitutes a competitive economic advantage over other companies.
(b) Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a
similar product.
(c) Information which discloses patentable subject matter for which it may be desirable to obtain patent protection.
The affidavit dated December 2, 2008, stated that the submitted information should be
considered exempt from mandatory public disclosure for reasons (a) and (b) above.
We have reviewed your applications and the material in accordance with the requirements of
10 CFR 2.390 and, on the basis of your statements, have determined that the submitted
information sought to be withheld contains proprietary commercial information and should be
withheld from public disclosure.
Therefore, the versions of the submitted information marked as proprietary will be withheld from
public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act
of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and
directly concerned to inspect the documents. If the need arises, we may send copies of this
information to our consultants working in this area. We will, of course, ensure that the
consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future, such that the information could then be made available for public inspection, you should
promptly notify the NRC. You also should understand that the NRC may have cause to review
this determination in the future, for example, if the scope of a Freedom of Information Act
request includes your information. In all review situations, if the NRC makes a determination
adverse to the above, you will be notified in adv ance of any public disclosure. If you have any questions regarding this matter, I may be reached at 301-415-2315.
Sincerely,
/RA/
Eva A. Brown, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Docket Nos. 50-259, 50-260, and 50-296
cc: Milton E. Teske and Barbara A. Agans Continuum Dynamics, Inc.
34 Lexington Avenue Ewing, NJ 08618-2302
Additional Distribution via Listserv P. Swafford adverse to the above, you will be notified in adv ance of any public disclosure. If you have any questions regarding this matter, I may be reached at 301-415-2315.
Sincerely,
/RA/
Eva A. Brown, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Docket Nos. 50-259, 50-260, and 50-296
cc: Milton E. Teske and Barbara A. Agans Continuum Dynamics, Inc.
34 Lexington Avenue Ewing, NJ 08618-2302
Additional Distribution via Listserv
DISTRIBUTION
- Public RidsOgcMailCenter LPL2-2 R/F RidsAcrsAcnw_MailCTR RidsNrrLABClayton (Hard Copy) RidsNrrPMEBrown (Hard Copy)
RidsRgn2MailCenter (EGuthrie) RidsNrrDorlLpl2-2 (TBoyce)
JVera, NMSS
ADAMS Accession Number: ML092430207 NRR-084 OFFICE NMSS LPL2-2/PM LPL_WB/LA LPL-2-2/BC NAME JVera EBrown BClayton FSaba for TBoyce DATE 09/08/09 09/04/09 09/02/09 09/14/09 OFFICIAL RECORD COPY