05000368/LER-1983-014, Forwards LER 83-014/01T-0

From kanterella
Revision as of 18:30, 30 December 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards LER 83-014/01T-0
ML20204G166
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/25/1983
From: John Marshall
ARKANSAS POWER & LIGHT CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20204G168 List:
References
2CAN048310, 2CAN48310, NUDOCS 8305020373
Download: ML20204G166 (1)


LER-2083-014, Forwards LER 83-014/01T-0
Event date:
Report date:
3682083014R00 - NRC Website

text

a l

  • ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 LITTLE ROCK ARKANSAS 72203 (501)371-4000 April 25, 1983 2CAN048310 Mr. W. C. Seidle, Chief M@ 3[lM3[S ~'

. I Reactor Project Branch #2 s i !

U. S. Nuclear Regulatory Commission APR 2 8 883 -

Region IV 611 Pyan Plaza Drive, Suite 1000 -

Arlington, Texas 76011 ~

Subject:

Arkansas fluclear One - Unit 2 Docket No. 50-368 License No. NPF-6 Licensee Event Report No. 83-014/01T-0 Centlemen:

In accordance with Arkansas Nuclear One - Unit 2 Technical Specification 6.9.1.8.b, attached is the subject report concerning the degradation of two Reactor Coolant Systen Resistance Temperature Detectors.

ry 1 curs, ohn R. Marshall Manager, Licensing JRM:RJS:sl Attachnent x{-M

--)

cc: Mr. Richard C. DeYoung Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. Norman M. Haller, Director Office of Management & Program Analysis U. S. Nuclear Regulatory Comission Washington, D. C. 20555 8305020373 830425 PDR ADOCK 05000368 S PDR MEMBER MiOOLE SOUTH UTIUTIES SYSTEM