05000368/LER-1983-002, Forwards LER 83-002/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 83-002/03L-0
ML20079L814
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 02/14/1983
From: John Marshall
ARKANSAS POWER & LIGHT CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20079L816 List:
References
2CAN028301, 2CAN28301, NUDOCS 8302230456
Download: ML20079L814 (1)


LER-1983-002, Forwards LER 83-002/03L-0
Event date:
Report date:
3681983002R00 - NRC Website

text

ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 UTTLE ROCK. ARKANSAS 72203 (501) 371-4000 February 14, 1983 2CAN028301 s

Mr. W. C. Seidle, Chief F8 i T E Reactor Project Branch #2 U

U. S. Nuclear Regulatory Commission lL:9 Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 Subject.

Arkansas Nuclear One - Unit 2 Docket No. 50-368 l

License No. NPF-6 Licensee Event Report No. 83-002/03L-0 Gentlemen:

In accordance with Arkansas Nuclear One - Unit 2 Technical Specification 6.9.1.9.b, attached is the subject report concerning loss of an intake structure exhaust fan (2VEF-258).

Due to an unfortunate handling error, this letter was not released to the NRC when completed February 1, 1983.

Although the error is not considered serious, we have increased our efforts to prevent any further such l

incidents.

ry trul our,

John R. Marshall Manager, Licensing JRM:CHT: s1 Attachment cc: Mr. Richard C. DeYoung Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission h

Washington, D. C.

20555 Mr. Norman M. Haller, Director Office of Management & Program Analysis U. S. Nuclear Regulatory Commission Washington, D. C.

20555 830223045$ gg

{DRADOCK0500$3s PDR MEMBER MIODLE SOUTH UTILITIES SYSTEM

)