05000313/LER-1983-008, Forwards LER 83-008/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 83-008/03L-0
ML20069L415
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/20/1983
From: John Marshall
ARKANSAS POWER & LIGHT CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20069L417 List:
References
1CAN048312, 1CAN48312, NUDOCS 8304280196
Download: ML20069L415 (1)


LER-2083-008, Forwards LER 83-008/03L-0
Event date:
Report date:
3132083008R00 - NRC Website

text

_ _ _ _ _ _ _ _ _ _

b ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 UTTLE ROCK, ARKANSAS 72203 (501) 371-4000 April 20, 1983 1CAN048312 Mr. W. C. Seidle, Chief -,;- ~' ~ 'l Reactor Project Branch #2 W'O U. S. Nuclear Regulatory Commission P '~ ~ 2. 1 L -  ;\

Region IV

^

611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 ((

(

300 N"2SG83

'3t i

Subject:

Arkansas Nuclear One - Unit 1 Docket No. 50-313 License No. DPR-51 Licensee Event Report No. 83-008/03L-0 Gentlemen:

In accordance with Arkansas Nuclear One - Unit 1 Technical Specification 6.12.3.2.b, attached is the subject report concerning failure of the pressure control valve PCV-7447 to function properly in the hydrogen purge system.

V ry uly yours, (ohn_R./fMarsh 1 anager, Licensing JRM:RJS:sl Attachment cc: Mr. Richard C. DeYoung Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Mr. Norman M. Haller, Director Office of Management & Program Analysis U. S. Nuclear Regulatory Commission f h

Washington, D. C. 20555 9 v -

8304280196 830420 PDR ADOCK 05000313 S PDR MEMBER MIDOLE SOUTH UTILITIES SYSTEM