Final Deficiency Rept,Originally Reported on 800328,re Nonspecific Certificates of Compliance for Weld Filler Matl Chemical & Physical Heat Values.Util Nonconformance Repts Closed & Found Acceptable by ASME Inspector
ML20003A334
Person / Time
Site: Marble Hill
Issue date: 01/28/1981
From: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, S80-12, NUDOCS 8102030509
Download: ML20003A334 (2)


Text

'

0129814004 W

g .

M PUBLIC SERVICE INDIANA S. W. Shields Senior Vice Presdent .

Nuclear Division January 28, 1981 S80-12 Mr. James G. Keppler, Director Docket Nos.: STN 50-546 U. S. Nuclear Regulatory Commission STN 50-547 Region III Construction Permit Nos.:

799 Roosevelt Road CPPR - 170 Glen Ellyn, Illinois 60137 CPPR - 171 Marble Hill Nuclear Generating Station - Units 1 and 2

Dear Mr. Keppler:

On March 28, 1980, Mr. T. D. Geib of Public Service Company of Indiana, Inc., (PSI) notified your office of a potentially reportable incident as required by 10 CFR 50.55 (e) . While performing surveillance at a piping fabricator's facilities, PSI Quality Assurance auditors noted that Certi-ficates of Compliance which furnished typical chemical and physical values had been supplied for several heats of weld filler material used and on pipe manufactured in accordance with ASME B&PV Code,Section III, Sub-section ND, 1974 Edition, Winter 75 Addendum. It was the PSI auditors' opinion that the ASME Code required Certified Material Test Reports (CWfR"S) to be supplied for each heat of weld filler material which would include a statement of the actual chemical and physical properties. Some of the heats of weld filler material in question had been used in pipe which had been delivered to the site.

As discussed in the September 29, 1980, interim report, PSI received an ASME Code Interpretation which stated that for material manufactured under ASME Section III, Subsection ND, 1974 Edition, Winter 75 Addendum a Certi-ficate of Compliance which provides typical chemical and physical properties of weld filler material was all that was required.

Other questions relative to the typical CMTR's were the sub]ect of a visit.

to vendor facilities on September 18, 1980. At that meeting, PSI requested copies of all related receiving and release documentation relative to the filler materials in question. The vendor has subsequently supplied all pertinent information. 0O 10 P.O. Box 190, New Washington, Indiana 47162 812. 293. 4441 D 1 O L O L OM g

,,, 0129814004

. .:../

PUBUC SERVCE INDIANA Letter: Janes G. Keppler January 28, 1981 S80-12 All PSI nonconformance reports related to this incident have now been closed and have been found acceptable by the Project's ASME Authorized Nuclear Inspector. All of the related documentation and hardware has subsequently been " accepted-as-is." As a result, we feel that the potential for a reportable incident under 10 CFR 50.55(e) no longer exists.

Sincer .

- M

/ S. W. Shields RPK/TDG/mjg cc: Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 E. R. Schweibins, P. E.

I J. J. Harrison bec: W. M. Petro T. R. Burns L. O. Ramsett J. R. Pope l G. A. Troxell J. U. Bott

, S. J. Brewer C. G. Beckham R. H. Porter -

C. S..Togni l K. Hinkle

.R. P. Keele

'P. W. Wattelet File: 4.01.29 1