ML19294B857

From kanterella
Revision as of 01:41, 15 November 2019 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Interim Deficiency Rept Re Surface Indication on Reactor Pressure Vessel.Ge Will Investigate Indications.Next Rept Will Be Submitted by 800211
ML19294B857
Person / Time
Site: 05000355
Issue date: 01/21/1980
From: Martin T
Public Service Enterprise Group
To:
Shared Package
ML19294B855 List:
References
NUDOCS 8003060207
Download: ML19294B857 (2)


Text

': -

Thomas J. Martin Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 201/430-8316 Vice President Engineenng and Construction January 21, 1980 Mr. Boyce H. Grier, Director U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. Crier:

SURFACE INDICATION - RPV NO. 2 10CFR50.55(e), "SIGNIFICANT DEFICIENCY" NO. 2 UNIT HOPE CREEK GENERATING STATION On December 13, 1979 a verbal report was made to Region 1, Office of Inspection and Enforcement representative, Mr. R. McGaughy, advising of a potential significal:t item regarding a s.rface indication on Reactor Pressure Vessel No. 2.

The following supplemental information is hereby submitted pursuant to our initial report and in accordance with the require-ments of 10CFR50.55(e).

A surface indication was found on the Unit 2 RPV approximately one inch in diameter. The indication has several porous cavities, approximately 1/64" - 1/32" deep and four tiny linear indications.

General Electric issued a Field Deviation Disposition Report (FDDR) on January 11, 1980 directing investigation of the indication.

.

800806 Q {

ess.:: ;r

1 ~.

Mr. B. H. Grier 1/21/80 The investigation will be accomplished by grinding, in .020 inch increments, with PT examination between each increment until the indication is removed. The investigation will be performed by General Electric. A subsequent FDDR will be issued should any repair be required. General Electric will provide our Architect /

Engineer, Bechtel Power Corporation with the results of this investigation. After our review and acceptance of Bechtel's evaluation, a more definitive report shall be sent to you by February ll, 1980.

Very truly yours,

/

Y CC: Office of Inspection and Enforcement Division of Reactor Construction Inspection Washington, D. C.

.