= Thomas J. Martin Public Service Electric and Gas Company 80 Park Plaza Newark, N.J. 07101 201/4304316 VicD Pradet Engineering and Construction June 1, 1984 Dr. Thomas E. Murley, Administrator U. S. Nuclear Regulatory Commission Office of-Inspection and Enforcement Region I 631 Park Avenue
, King of Prussia, Pennsylvania 19406
Dear Dr. Murley:
POTENTIAL CONSTRUCTION DEFICIENCY GENERAL ELECTRIC "HEA" RELAYS HOPE CREEK GENERATING STATION On May 2, 1984, a verbal report was made to Region I, Office of Inspection and Enforcement representative, Mr. E. C. McCabe, advising of a potentially significant construction deficiency regarding thirteen (13) defective HEA relays supplied by General Electric.
The following interim report is provided in accordance with 10CFR50.55(e).
-General Electric indicated in a service advice letter, that HEA relays manufactured between September, 1980 and August, 1983 may exhibit trip force values which could cause mis-operation.
This malfunction is related to a minor design change that was implemented during the above time frame.
Our Architect / Engineer and Constructor, Bechtel, advised us that testing of HEA relays in accordance with GE's instructions identified thirteen (13) relays installed in safety related. systems that failed to meet the specified
' trip force values.
8406120497 840601 PDR ADOCK 05000354 8
PDR-D E
ac a ?
7
'T
'llt. T. E. Murley 2
6/1/84 Bechtel has issued Nonconformance Report No. 3108 to document
.and control the hardware.
Receipt of replacement relays from General Electric is scheduled for August, 1984.
A report conveying the requisite safety analysis is expected to be completed and submitted to your office by September 21, 1984.
Very truly yours, f
$Y s
C Office of Inspection and Enforcement Division of Reactor Construction Inspection Washington, D.
C.
20555 NRC Resident Inspector - Hope Creek
'P.
O. Box 241 Hancocks Bridge, NJ 08038 Records Center Institute of Nuclear Power Operations
-1100 Circle 75 Parkway, Suite 1500
-Atlanta,_-GA-30339