SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT Turkey Point Unit No. 3 DATE June 15, 1982 COMPLETED BY Paul L. Pace TELEPHONE (305) 552-3654 REPORT MONTH May 1982 Unit 3 operated at essentially full power except for outages on 5/15, 5/19 and 5/20. See the " Unit Shutdown Report" and Power Reduction for details.

Major Safety-related maintenance activities performed during the month included:

Steam Generator Blowdown line snubber, and pipe hangers were rebaired.

Diesel Generator auto start compressor was repaired.

Inspections and requirements of IE Bulletins and NUREG-0737 are continuing.

Florida Power & Light Company commitments for NUREG-0737 Implementation are continuing. Refer to correspondence between FPL and NRC for additional information.

l l

t .

l l

i t

S

{

8207090260 820615

l. PDR ADOCK 05000250 R PDR L -_.

t I o I

t l

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-251 UNIT Turkey Point Unit No. 4 DATE June 15, 1982 COMPLETED BY P.L. Pace TELEPHONE (305) 552-3654 REPORT MONTH May 1982 Unit 4 operated at essentially full power for the entire month, except for an outage on May 5. See the " Unit Shutdowns and Power Reductions" Report for details. Major maintenance activities performed during the month included:

Diesel Generator auto start compressor was repaired.

Inspections and requirements of IE Bulletins and NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.

See the " Unit Shutdowns and Power Reductions" Report for additional maintenance activities.

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-335 UNIT St. Lucie Unit No. 1 DATE June 15, 1982 COMPLETED BY P.L. Pace TELEPHONE (305) 552-3654 IEPORT MONTII May 1982 Unit 1 operated at essentially full power except for the scheduled outage for steam generator tube inspector.

Major Safety-related maintenance activities performed during the month included:

Steam genergtor tube eddy current testing.

Reactor coolant pump seal repair.

Code pressurizer safety valve replacement Inspections and requirements of IE Bullentins and NUREG 0737 in progress.

Florida Power & Light Company commitments for NUREG-0737 implementation are continuing. Refer to correspondence between FPL and NRC for additional information.