ML20054J332

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Diesel Generator Bolt Torquing, Initially Reported on 820514.Verification of Requisite Torque Valves on Generator S/N 700510R1 Pending Availability of Manufacturer Representatives
ML20054J332
Person / Time
Site: Hope Creek, 05000355  PSEG icon.png
Issue date: 06/10/1982
From: Martin T
Public Service Enterprise Group
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8206280504
Download: ML20054J332 (2)


Text

- . . . . . .

T Thomas J. Martin Public Service Electnc and Gas Company 80 Park Plaza Nrmark, N.J. 07101 201/430B316 Vice Prewient E rgrwrsrw] arv1 Construction June 10, 1982 Mr. R. C. Haynes, Administrator U.S. Nuclear Regulatory Commission , ,3 Office of Inspection and Enforcement , ,

Region I "N , O 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. Haynes:

SIGNIFICANT CONSTRUCTION DEFICIENCY DIESEL GENERATOR BOLT TORQUING llOPE CREEK GENERATING STATION On May 14, 1982, a verbal report was made to Region I, Office of Inspection and Enforcement representative, Mr. R.

Keimig, advising of a potential significant construction deficiency concerning the torque values of stud to nut com-binations securing the shaft spider assembly in one diesel generator received at ilope Creek.

The following information is submitted as an interim report in accordance with the requirements of 10CFR50.55(e).

Beloit Power Systems, subsupplier to Colt Industries, has notified the NRC of a bolt torquing problem on diesel gen-erators supplied to Colt Industries. Since the condition was detected on the second of four generators being fabricated for flope Creek, the condition of the generator previously shipped to the site is indeterminate (S/N 700510Rl). The stud / nut combination holding the BPS generator spider to the Colt generator shaft on BPS generator S/N 750010R2 was found to be under torqued.

Bechtel Power Corporation, PSE&G's constructor at the flope Creek site, has requested a report from Colt Industries which describes the corrective actions to be taken to ensure correct torque on the stud / nut combinations for the three remaining diesel generators at the manufacturer's location.

A Bechtel Supplier Quality Representative will be on hand to witness the torquing operation.

8206280504 820610 PDR ADOCK 03000354 S PDR Sq

e e 8 Mr. R. C. Haynes 6/10/82 Verification of achievement of the requisite torque values on generator S/N 700510R1 at the Hope Creek site is pending availability of manufacturer representatives. We will l advise you when this activity is scheduled to take place.

Very truly yours,

'h i

l RBD:srd CC: Office of Inspection and Enforcement Division of Reactor Construction Inspection Washington, DC NRC Resident Inspector - Hope Creek P.O. Box 241 Hancocks Bridge, NJ 08038 FN03 1/2