Interim Part 21 & Deficiency Rept Re Installation of Four Generator Potential Transformer & Basler Electric Exciter Control Panels.Initially Reported on 840503.Problem Subj of Part 21 Rept Submitted to Region III by Basler Electric
ML20091N876
Person / Time
Site: Hope Creek, 05000355  PSEG icon.png
Issue date: 06/01/1984
From: Martin T
Public Service Enterprise Group
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
REF-PT21-84-296-000 PT21-84-296, PT21-84-296-000, NUDOCS 8406120490
Download: ML20091N876 (2)


Text

'

x

_ 50 Co Thomas J. Martin Public Service Electric and Gas Company 80 Park Plaza Newark, N.J. 07101 201/430B316 Vice President Engineering and Construction Y JUN PV Dr. Thomas E. Murley, Administrator U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Dr. Murley:

POTENTIAL CONSTRUCTION DEFICIENCY SILICON CONTROLLED RECTIFIERS - EDG HOPE CREEK GENERATING STATION On May 3, 1984, a verbal report was made to Region I, Office of Inspection and Enforcement representative, Mr. E. C.

McCabe, advising of a potentially significant construction deficiency regarding Silicon Controlled Rectifiers (SCR's) that may have been incorrectly installed in our Emergency Diesel Generator Exciters. The following interim report is provided in accordance with 10CFR50.55(e).

The problem concerns four (4) generator potential trans-former and exciter control panels. The SCR's may have been damaged as a result of excessive mounting pressure. This potential problem is the subject of a Part 21 Report submitted to Region III by Basler Electric, the manufacturer of the exciters.

Our Architect / Engineer and Constructor, Bechtel, is coordinating with Basler Electric to have the affected equipment inspected and repaired if required. Bechtel has issued Nonconformance Report No. 4009 to document and control the hardware. Inspec-tion activities and any necessary repairs are scheduled for completion by August 24, 1984.

t l

8406120490 840601 PDR ADOCK 05000354 S PDR 1

f IO th al

c~

7=..,.. .

Dr.1T.'E. Murley 2 6/1/84 A. final report is expected to be submitted to your offico

'by September 14, 1984.

Very truly yours, t

I f flfl*WA C Office of Inspection and Enforcement-Division of Reactor Construction Inspection

. Washington, D. C. 20555 NRC Resident Inspector - Hope Creek P. O.. Box 241 Hancocks Bridge, NJ 08038 Records Center Institute of Nuclear Power Operations

~

1100 circle 75 Parkway, Suite 1500

-Atlanta, GA 30339 d'