56-3S sp 3sr 1
Thomas J. Martin Public Service Electric and Gas Company 80 Park Plaza Newarx, N.J. 07101 201/4304316 Vice President Engineering and Construction July 29, 1982 Mr. Ronald C. Haynes, Administrator U. S.
Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 j
Dear Mr. Haynes:
1 HPCI/RCIC EXHAUST CHECK VALVES SIGNIFICANT CONSTRUCTION DEFICIENCY HOPE CREEK GENERATING STATION On November 17, 1981, a verbal report was made to Region I, Office of Inspection and Enforcement representative, Mr. W. H.
Bateman, advising of a potential significant deficiency.
On i
December 15, 1981, a written report was submitted to your office.
The following interim information is provided in accordance with the requirements of 10CFR50.55(e).
1.
Bechtel has completed their analysis of the safety implica-tions postulating valve failure.
The results indicate _the potential for:
a) reverse water flow from the torus and b) soort term loss of containment isolation.
Bechtel's Project Engineering has determined that, had the condition gone undetected the valves might have failed, and that such a failure could adversely affect plant safety.
The condition is, therefore, reportable as defined by 10CFR50.55(e).
2.
In addition to the manufacturer's proposal to modify the existing swing check valves, PSE&G is evaluating the option of replacing the swing check valves with lift-type check valves.
To date, both methods have been employed by various facilities with HPCI/RCIC system designs similar to Hope Creek's.
~~
8208090145 820729 PDR ADOCK 05000354 S
R. C. Ilaynes 2
7/29/82 A written report will be submitted to your office by September 15, 1982, advising you of the specific course of action and the projected completion date.
Very truly yours, cc: