Final Deficiency Rept Re Damaged Bellows Assembly,Initially Reported 811104.Apparently Caused by Electrical Arcing.No Repair or Rework Contemplated Due to Facility Cancellation
ML20040B439
Person / Time
Site: 05000355
Issue date: 01/11/1982
From: Martin T
Public Service Enterprise Group
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8201260053
Download: ML20040B439 (2)


Text

..

l l

T homas J. Martm P A N 5 :r u f.'o ir. e i Go, O,n n e i 80 Para F aa V , A , N.J. 07101 201/430-E316 Va o Pre side-nf r ,,n,.r ay .,oa cwsuumon Mailing Address: P.O. Box 570, Newark, N.J. 07101 January 11, 1982

/

/;'-

TN  ;.Ns g_

Mr. Ronald C. Haynes, Director /

T U. S. Nuclear Regulatory Commission j }

Office of Inspection and Enforcement j ,

\

Region I l 631 Park Avenue { ,1 King of Pruss ia , Pennsylvania 19406 ( /

/

Dear Mr. Haynes:

SIGNIFICANT CONSTRUCTION DEFICIENCY DAMAGED BELLOWS ASSEMBLY NO. 2 UNIT, 50-355 HOPE CREEK GENERATING STATION On November 4, 1981, a telephone report was made to Region I representative, Mr. E. Greenman, advising him of damage to a bellows in the Unit #2 primary containment. On December 2, l981, an interim report was submitted which outlined in-vestigative and corrective steps initiated by PSE&G.

The following are the results of those actions:

1. I_n ve_s t i. g a t i o n All other Unit #2 ventline bellows assemblies were inspected for damage. No damage was evident. Addition-ally, " soap bubble" tests at 5 psi and 62 psi were suc-cessfully conducted providing supportive evidence that no similar damage to the remaining Unit #2 bellows as-semblies was substained.

Neither a review of available inspection records nor interviews with cognizant shop and field personnel permitted determination of either the precise cause of the damage or the exact point in time when it occurred.

l The Engineering assessment indicates that the perf ora- l tion was apparently produced thermally as a result of j electrical arcing (probably a we'.d electrode). '

8201260053 820111 PDR ADOCK 05000355 S PDR

/6'E'

' V/

Mr. R. C. Ilaynes 1/11/82

2. Corrective Action No repair or rework activities are planned for the dam-aged bellows assembly in light of PSE&G's cancellation of Unit #2.

All retta ' ning bellows assemblies for both units are equippeo with protective covers. Present sequencing of Unit #1 work activities calls for these protective covers to remain in place up to the start-up phase of plant. construction.

Should you have any further questions, please contact us.

Very truly yours,

/

/[/h W RI3D : s rd CC: Office of Insoection and Enforcement Division of Reactor Construction Inspection Washington, D. C.

NRC Resident Inspec'.or - Ilope Creek P.O. Box 241 Ilancocks Bridge, N.J. 08038 FEl 1/2