Interim Significant Const Deficiency Rept Re Limitorque Valve Operators.Initially Reported on 810619.Instructions for Operator Insp & Rework Will Be Included in Cable Termination Work Procedure Scheduled for Issuance by 821231
ML20065S316
Person / Time
Site: Hope Creek, 05000355  PSEG icon.png
Issue date: 10/21/1982
From: Martin T
Public Service Enterprise Group
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8211010181
Download: ML20065S316 (2)


Text

., ..

b Thomes J. Martin Public Service Electric and Gas Company 80 Park Plaza Newark, N.J. 07101 201/4304316 Vice President Engineering and Construction October 21, 1982 Mr. Ronald C. Ilaynes, Administrator U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. Ilaynes:

LIMITORQUE VALVE OPERATORS SIGNIFICANT CONSTRUCTION DEFICIENCY IIOPE CREEK GENERATING STATION On June 19, 1981, a verbal report was made to Region I, Office of Inspection and Enforcement representative, Mr. R. Gallo, advising of a significant deficiency concerning limitorque valve operators. On July 17 and November 19, 1981, written reports were submitted to your office. The following informa-tion is provided to update the above reports in accordance with the requirements of 10CFR50.55 (e) .

i l 1. Based on the results of a sample inspection of limitorque i operators on-site, we conclude that the scope of rework involved is less than originally anticipated. Consequently, inspection and rework as required of the limitorque opera-tors is scheduled to be done during the cable pulling and termination phase of installation.

2. Instructions governing this inspection and rework will be included in the cable termination work procedure scheduled for issuance by December 31, 1982.
3. Quality Control inspection and verification of rework for safety related limitorque operators will be documented on Inspection Reports provided for this purpose.

C211010181 821021 1 PDR ADOCK 05000354 PDR g

$6d

Mr. R. C. Ilaynes 2 10/21/82

4. The NRC Resident Inspector will be informed when the limitorque inspection / rework activities commence.

Very truly yours, cc: Office of Inspection and Enforcement Division of Reactor Construction - Inspection Washington, D. C.

NRC Resident Inspector - llope Creek P. O. Box 241 liancocks Bridge, NJ 08038

.