Interim Deficiency Rept Re Damage to Bellows in Primary Containment,Initially Reported 811104.Damaged Bellows Will Be Replaced.Insp of Other Bellows & Investigation Will Be Completed in Early Jan 1982
ML20038C699
Person / Time
Site: Hope Creek 
Issue date: 12/02/1981
From: Martin T
Public Service Enterprise Group
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
10CFR-050.55E, 10CFR-50.55E, NUDOCS 8112140054
Download: ML20038C699 (2)


Text

CDsf f/ - c c - c f

~*

r, Th2 mas J. Martin Public Service Electric and Gas Company 80 Park Plaza Newark, N.J. 07101 201/4304316 Vice President Engineering and Construction December 2, 1981

,qn

.,s

[fQ)g

$6)

Mr. Ronald C.

Haynes, Director

[

U.S. Nuclear Regulatory Commission

(;99z DEC1019815-;T2 Office of Inspection and Enforcement Reglon 1

'd u C),

.s, nnsu sauten A**" P" 631 Park Avenue King of Prussia, Pennsylvania 19406 x()x

^f

\\$ /

_{

s, dy l

Dear Mr. Haynes:

s SIGNIFICANT CONSTRUCTION DEFICIENCY DAMAGED BELLOWS ASSEMBLY NO. 2 UNIT, 50-355 HOPE CREEK GENERATING STATION On November 4, 1981, a telephone report was made to Region I representative, Mr.

E. Greenman, advising him of damage to a bellows in the Unit #2 primary containment.

The following interim report is submitted in accordance with 10CFR50.55e.

Description of the Deficiency The Hope Creek containment is a " Mark I" drywell and torus with eight (8) vent lines connecting the drywell to the torus.

Each vent line contains two expansion bellows as-semblies.

During testing of the bellows by the installation contractor, Pittsburgh-Des Moines Steel Company (PDM), a hole was detected through both plies of the outer bellows in ventline 8A.

Safety Implications The perforation of both plies of a ventline bellows, if left uncorrected, would result in a breach of containment during accident conditions.

Corrective Action Our Architect Engineer, Bechtel Power Corporation, has in-structed PDM to perform the following:

1.

Inspect all other Unit #2 ventline bellows assemblies for similar damage.

r I

8112140054 811202 I h)\\0 PDR ADOCK 05000355 S

PDR

\\

=

s 1

Mr. Ronald C. Haynes 12/2/81 Corrective Action (Cont.)

2.

Repair or replace the damaged bellows.

3.

Determine the cause of the perforation and actions nec-essary to prevent recurrence.

We anticipate completion of the inspection and investigation (Items 1 and 3 above) in early January, 1982.

We will re-port the results to you at that time.

Very truly yours,

/ '&

/

i CC:

Of fice of Inspection and Enforcenant Division of Reactor Construction - Inspection Washington, D.C.

NRC Resident Inspector - Hope Creek P.O.

Box 241 Hancocks Bridge, New Jersey 08038 GJ4 1/2

_