MONTHYEARIR 05000272/20240032024-10-30030 October 2024 Integrated Inspection Report 05000272/2024003 and 05000311/2024003 ML24296B1932024-10-23023 October 2024 Project Manager Assignment LR-N24-0068, Core Operating Limits Report - Cycle 282024-10-21021 October 2024 Core Operating Limits Report - Cycle 28 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) ML24267A1082024-09-23023 September 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report IR 05000272/20240052024-08-29029 August 2024 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2024005 and 05000311/2024005) IR 05000272/20240022024-07-30030 July 2024 Integrated Inspection Report 05000272/2024002 and 05000311/2024002 LR-N24-0012, Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding2024-07-24024 July 2024 Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding ML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24099A1572024-05-29029 May 2024 Issuance of Amendment Nos. 348 and 330 Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response IR 05000272/20240102024-05-16016 May 2024 Fire Protection Team Inspection Report 05000272/2024010 and 05000311/2024010 05000272/LER-2024-001, Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger2024-05-0909 May 2024 Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger IR 05000272/20240012024-05-0707 May 2024 Integrated Inspection Report 05000272/2024001 and 05000311/2024001 LR-N24-0039, Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage2024-05-0606 May 2024 Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 ML24071A2132024-03-12012 March 2024 Senior Reactor and Reactor Operator Initial License Examinations LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report LR-N24-0022, Spent Fuel Cask Registration2024-02-29029 February 2024 Spent Fuel Cask Registration IR 05000272/20230062024-02-28028 February 2024 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023006 and 05000311/2023006 IR 05000272/20244012024-02-26026 February 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0009, In-Service Inspection Activities2024-02-0505 February 2024 In-Service Inspection Activities IR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24250A0582023-11-14014 November 2023 PSEG to Marine Mammal Stranding Center, Salem Sea Turtle Stranding Response Services IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 LR-N23-0072, Core Operating Limits Report – Cycle 302023-11-0101 November 2023 Core Operating Limits Report – Cycle 30 IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20234022023-10-12012 October 2023 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0045, And Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 And Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) ML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23192A8212023-08-14014 August 2023 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location 2024-09-23
[Table view] Category:Operating Report
MONTHYEARLR-N23-0016, And Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 And Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N21-0055, Corrected Report of Changes, Tests, and Experiments2021-07-20020 July 2021 Corrected Report of Changes, Tests, and Experiments LR-N18-0136, Report of 10 CFR 72.48 Changes, Tests, and Experiments2018-12-0505 December 2018 Report of 10 CFR 72.48 Changes, Tests, and Experiments LR-N06-0046, PSEG Metrics for Improving Work Environment, Salem and Hope Creek, Quarterly Report2006-01-31031 January 2006 PSEG Metrics for Improving Work Environment, Salem and Hope Creek, Quarterly Report LR-N05-0196, Report of Changes, Tests and Experiments2005-03-31031 March 2005 Report of Changes, Tests and Experiments ML0402908812004-01-22022 January 2004 New Jersey Pollutant Discharge Elimination System Discharge Monitoring Reports Salem Generating Station Permit No. NJ0005622 LR-N04-0013, December 2003 Monthly Operating Report Salem Generating Station Unit 22004-01-15015 January 2004 December 2003 Monthly Operating Report Salem Generating Station Unit 2 ML19031A3521978-10-10010 October 1978 Submit Operating Report for Month of September 1978 ML19030A3241978-09-12012 September 1978 Submit Monthly Operating Report for the Month of August 1978 for Salem No. 1 ML19030A3261978-08-10010 August 1978 Submit Monthly Operating Report for the Month of July 1978 for Salem No. 1 ML19030A3291978-07-12012 July 1978 Submit Monthly Operating Report for the Month of June 1978 for Salem No. 1 ML19030A3281978-07-10010 July 1978 Attached Monthly Operating Report of Industrial Waste Treatment Plant for the Month of June 1978 ML19030A3311978-06-0909 June 1978 Submit Monthly Operating Report for the Month of May 1978 for Salem No. 1 ML19030A3321978-06-0909 June 1978 Submit Monthly Operating Report for the Month of May 1978 for Salem No. 1 ML19030A3341978-05-10010 May 1978 Submit Monthly Operating Report for the Month of April 1978 for Salem No. 1 ML19030A3351978-04-10010 April 1978 Submit Monthly Operating Report for the Month of March 1978 for Salem No. 1 ML19030A3371978-04-10010 April 1978 Submit Monthly Operating Report for the Month of March 1978 for Salem No. 1 ML19030A3381978-03-0707 March 1978 Submit Monthly Operating Report for the Month of February 1978 for Salem No. 1 ML19030A3401978-02-15015 February 1978 Submit Monthly Operating Report for the Month of January 1978 for Salem No. 1 ML19030A3411978-01-0909 January 1978 Submit Monthly Operating Report for the Month of December 1977 for Salem No. 1 ML19030A3431977-12-0909 December 1977 Submit Monthly Operating Report for the Month of November 1977 for Salem No. 1 ML19030A3471977-11-0404 November 1977 Submit Monthly Operating Report for the Month of November 1977 for Salem No. 1 ML19030A3491977-10-0505 October 1977 Submit Monthly Operating Report for the Month of September 1977 for Salem No. 1 ML19030A3511977-09-0909 September 1977 Submit Monthly Operating Report for the Month of August 1977 for Salem No. 1 ML19030A3531977-08-10010 August 1977 Submit Monthly Operating Report for the Month of July 1977 for Salem No. 1 ML19030A3561977-07-0808 July 1977 Submit Monthly Operating Report for the Month of June 1977 for Salem No. 1 ML19030A3591977-06-0606 June 1977 Submit Monthly Operating Report for the Month of May 1977 for Salem No. 1 ML19030A3601977-05-0909 May 1977 Submit Monthly Operating Report for the Month of April 1977 for Salem No. 1 ML19030A3611977-05-0909 May 1977 Submit Monthly Operating Report for the Month of April 1977 for Salem No. 1 ML19030A3621977-04-0606 April 1977 Submit Monthly Operating Report for the Month of March 1977 for Salem No. 1 ML19030A3641977-03-0303 March 1977 Submit Monthly Operating Report for the Month of February 1977 for Salem No. 1 ML19030A3661977-02-0707 February 1977 Submit Monthly Operating Report for the Month of January 1977 for Salem No. 1 ML19030A3681977-01-28028 January 1977 Submit Monthly Operating Report for the Month of December 1976 for Salem No. 1 ML19030A3691977-01-12012 January 1977 Submit Monthly Operating Report for the Month of December 1976 for Salem No. 1 ML19030A3711976-12-0101 December 1976 Submit Monthly Operating Report for the Month of November 1976 for Salem No. 1 ML19030A3721976-12-0101 December 1976 Submit Monthly Operating Report for the Month of November 1976 for Salem No. 1 ML19030A3741976-11-0101 November 1976 Submit Monthly Operating Report for the Month of October 1976 for Salem No. 1 ML19030A3761976-10-18018 October 1976 Submit Monthly Operating Report for the Month of September 1976 for Salem No. 1 ML19030A3771976-09-14014 September 1976 Submit Monthly Operating Report for the Month of August 1976 for Salem No. 1 2023-02-28
[Table view] Category:Monthly
MONTHYEARLR-N04-0013, December 2003 Monthly Operating Report Salem Generating Station Unit 22004-01-15015 January 2004 December 2003 Monthly Operating Report Salem Generating Station Unit 2 ML19031A3521978-10-10010 October 1978 Submit Operating Report for Month of September 1978 ML19030A3241978-09-12012 September 1978 Submit Monthly Operating Report for the Month of August 1978 for Salem No. 1 ML19030A3261978-08-10010 August 1978 Submit Monthly Operating Report for the Month of July 1978 for Salem No. 1 ML19030A3291978-07-12012 July 1978 Submit Monthly Operating Report for the Month of June 1978 for Salem No. 1 ML19030A3281978-07-10010 July 1978 Attached Monthly Operating Report of Industrial Waste Treatment Plant for the Month of June 1978 ML19030A3311978-06-0909 June 1978 Submit Monthly Operating Report for the Month of May 1978 for Salem No. 1 ML19030A3321978-06-0909 June 1978 Submit Monthly Operating Report for the Month of May 1978 for Salem No. 1 ML19030A3341978-05-10010 May 1978 Submit Monthly Operating Report for the Month of April 1978 for Salem No. 1 ML19030A3351978-04-10010 April 1978 Submit Monthly Operating Report for the Month of March 1978 for Salem No. 1 ML19030A3371978-04-10010 April 1978 Submit Monthly Operating Report for the Month of March 1978 for Salem No. 1 ML19030A3381978-03-0707 March 1978 Submit Monthly Operating Report for the Month of February 1978 for Salem No. 1 ML19030A3401978-02-15015 February 1978 Submit Monthly Operating Report for the Month of January 1978 for Salem No. 1 ML19030A3411978-01-0909 January 1978 Submit Monthly Operating Report for the Month of December 1977 for Salem No. 1 ML19030A3431977-12-0909 December 1977 Submit Monthly Operating Report for the Month of November 1977 for Salem No. 1 ML19030A3471977-11-0404 November 1977 Submit Monthly Operating Report for the Month of November 1977 for Salem No. 1 ML19030A3491977-10-0505 October 1977 Submit Monthly Operating Report for the Month of September 1977 for Salem No. 1 ML19030A3511977-09-0909 September 1977 Submit Monthly Operating Report for the Month of August 1977 for Salem No. 1 ML19030A3531977-08-10010 August 1977 Submit Monthly Operating Report for the Month of July 1977 for Salem No. 1 ML19030A3561977-07-0808 July 1977 Submit Monthly Operating Report for the Month of June 1977 for Salem No. 1 ML19030A3591977-06-0606 June 1977 Submit Monthly Operating Report for the Month of May 1977 for Salem No. 1 ML19030A3601977-05-0909 May 1977 Submit Monthly Operating Report for the Month of April 1977 for Salem No. 1 ML19030A3611977-05-0909 May 1977 Submit Monthly Operating Report for the Month of April 1977 for Salem No. 1 ML19030A3621977-04-0606 April 1977 Submit Monthly Operating Report for the Month of March 1977 for Salem No. 1 ML19030A3641977-03-0303 March 1977 Submit Monthly Operating Report for the Month of February 1977 for Salem No. 1 ML19030A3661977-02-0707 February 1977 Submit Monthly Operating Report for the Month of January 1977 for Salem No. 1 ML19030A3681977-01-28028 January 1977 Submit Monthly Operating Report for the Month of December 1976 for Salem No. 1 ML19030A3691977-01-12012 January 1977 Submit Monthly Operating Report for the Month of December 1976 for Salem No. 1 ML19030A3711976-12-0101 December 1976 Submit Monthly Operating Report for the Month of November 1976 for Salem No. 1 ML19030A3721976-12-0101 December 1976 Submit Monthly Operating Report for the Month of November 1976 for Salem No. 1 ML19030A3741976-11-0101 November 1976 Submit Monthly Operating Report for the Month of October 1976 for Salem No. 1 ML19030A3761976-10-18018 October 1976 Submit Monthly Operating Report for the Month of September 1976 for Salem No. 1 ML19030A3771976-09-14014 September 1976 Submit Monthly Operating Report for the Month of August 1976 for Salem No. 1 2004-01-15
[Table view] |
Text
.'
PS~G e RESUl.ATORY DOCKH n!I !IY Public Service Electric and Gas Company P.O. Box 168 Hancocks Bridge, New Jersey 08038 Salem Nuclear Generating Station September 12, 1978 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Dear Sir:
MONTHLY OPERATING REPORT
\.:.-**,
SALEM NO. 1 DOCKET NO. 50-272 In compliance with section 6.9, Reporting Requirements for the Salem Technical Specifications 1 10 copies of the following monthly operating reports for the month of August, 1978 are being sent to you.
Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Major Plant Modification Summary of Safety Related Maintenance Operating Summary Refueling Information Sincerely yours, 11fr'~,
H. J. Midura Manager - Salem Generating Station LKM: jcm cc: Mr. Boyce H. Grier Director of U. s. NRC Off ice of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pa. 19406 Director, Office of Management Information and Program Control moa-T:P:srs-:f Nuclear Regulatory Ccrmnission
~ington, D.C. 20555 Enc W1mn*1rn Page l of 8-l-7.R4 95-2189 (4M) 3-78
AVERA.GE DAILY lI'ffT PC'iE~ LEVEL DJCKET i\0.50-2 72
~~-'---~~~~~
UNIT Salem No. 1 DATE.September 12, 1978 CG*lPLETED BYL. K. Miller TELEPHON.t 609-365-7000, X507 MONTH August 1978 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL a.iwe-NET) (Mlvc-NET) 1 743 17 1073 2 1069 18 1092 3 1053 19 1076 4 1062 20 11 2 5 1038 21 _:373 6 948 22 7 925 23 313 8 496' 24 783 9 1022 25 9 10 1066 26 1002 11 1053 27 535 12 1092 28 0 13 1077 29 117 14 1071 30 968 15' 1045 31 1060 16 959 Pg. 2 of 15 8.1-7.Rl
.e IXX::XEr ro. :_5_0....-......
2....1...2_ _ _ _ __
~: Seotern.be.r 12:,_ 19}8 a::M?LEm) BY: L.. K. Mi lier TEU:PB:m:: 609-365-7000, X507
- i. Onit Nana:.* Salem* No. 1 .
Notes *. -
- 2. Repc:rrt:i.nq* Peric:d:_A_u ....g.._u.-.s~t....;;;;1~9-.7.-8__.;._ _ _ _ __
- 3. Licensed 'lllema.l Pc7.er* (mt) : _ _ _ _3_3_3_8 _ _ __
- 4. Ncmep.late Ratinq (Gross. !fie): _ _ _ _'!:"'1~1~3~5_ _ __
- s. Design Electrical. Ratinq (Net !fie): _ _1_0_9_0_ _ __
6 *. Maximum Dependable capac:ity (Gz:css:,~): 112 4
- 7. Maxilllllm: lJet'endable capacity* (Net~): _1_0_7_9_ _ __
- a. If. Changes Occur in capacity Ratings. (Items Nul!Cer 3 Thl:co;h 7) S.ince Last P.eport, Give Reason:.
None 9.
lO.**
J?ower I.eveJ. To Which* PSstricted, If Reasons For P.estrictions ;. I f Arr:!~
Arr:f* (Net .i.tiel :.*_._N
__.;.;.;;..;;.
None
....n;.;..;;.e_ _ _ _ _ _~-----------
....o
~-
. '!bis M:lnth Year to Date Cumulative 744 5,831 10,272 lL. - Hours' In P.e!;Crtinq Peric:d
- 12. Nlll!i::er. Of HCtJrs . .Reactor Was Critic:al 656.3 3,257.8 5, 801. 0
- u. Reactor Reser.le Shuteewn Hours . 0 0 0 l4. Hou.rs. Generator On-Line, 648.8 3,069.0 5,499.6
- 15. Oriit P.eserve Shutdown Hours 0 0 0 l6. GJ:CSs. 'Ibmnal. Ene?:gy* Generated (Mora) 1,989,124.8 9,157,994.2 15,853,214.2 l7 *. GJ:CSs El.ectr.i.cal. . Ecergy Generated(Kola) . .657,860 3,084;350. 5,270,660 lS. Net Elect:rical. Energy Generated (Mta) 626,775 2.,919 ,291 4,977,509 l9. Unit Service Factor 87.2 52.6 53.5 20., Unit AvaiJahility_Factcr . 87.2 52.6. 53. 5 2l. Unit capacity Factcr (Us.inq *MOC Net) 78.l 46.4 44.9 22~ Unit capacity Factor. (Using DER Net)_. 77.3 45.9 44.5 23 *. Unit Forced Ol.It:age Rate 12.8 47.4 36.2
- ShiltdcwriS Scheduled over Next 6 ~ *(Type, Date, and Duration o£ Each.> :
- 25. If Shut. Down At End of Report Peri.Odr Estimated Dii.te of* Startup: ._ _ _ ___.;._ _ _ _ _ _ _ _ _ __
- 26. Onits* In Test Status (Prior**tc camerc:ial <:peraticn): *
- Forecast. Achieved 9/30/76 *12/11/76 11/01/76 12/25/76 8-l-7.R2 Pg. 3 of 15 12/20/76 6/30/77
UNIT SI IU'l'IU'INS mID 1'F.R REOOCfIONS DOCK~~T NO. : 50-272 REPORT MJ1'm1 August, 19 7 8 UNIT:Ni\ME: Salem #1 D/\TE: September 12,' 1~78 COMPJ,ETED DY: L. K. Miller TELEPHONE: 609-365-7000 X507 MlITIDD OF OOFJ\TION SHlJITING LICENSE SYSTEM cx:t1I'CWENT CJ\USE J\ND rnrmocrIVE NO. D/\TE TIP El (HOURS) RE1\9'.JN2 IXMN EVEN!' rnoE'1 CODES J\CTIOO TO RFJ\CTOR REPOin' I PREVENI' RFilJRP.ENCE 78-100 8-1-78 F 0 B 4 --- HH FILTER Clean Steam Generator Feed Pump and Condensate Pump Suction Strainers.78-108 8:::5....:78 F 0 A 4 --- ;
HH FILTER Clean Condensate Pump Suction Strainers.78-115 8-7-78 F 0 A 4 --- HH FILTER Clean Steam Generator Feed Pump Suction Strainers and repair,
- 11 Recirc. Valve.78-116 8-8-78 F 0 A 4 --- HH TURBIN Turbine vibration caused by Governor Valve going open (due to blown 0-ring on EH,Oil Line) .78-129 8-15-78 F 0 A 4 --- HC HTEXCH 12A Condenser leak.
l 2 3 4 5 F: Forced Peason: M3thod: Exhibit G - Instructions F.x.hibi t 1-Sane Si Scheduled 1\-Equiprent Failure (Explain) !-Manual for Preparation of Data Source B-Maintenance or Test 2-Manuai Scram. Entry Sheets for Licensee C-Refueling 3-Autanatic Scram. Event lleport (LER) File D-Regulatory nestriction 4-0ther (Explain) (NIJREX}-0161)
E--operator Training & License Examination F-1\dmlnistrative 8-l-7.R2 ~rational Error(Explain) Load Reduction II-Other (P..xplain)
Pg. 4 - 15
l UNIT smmx:mNS 1\ND PCMER IlEOUCTIONS DOCKET NO.: 50-272 REPORI' IDHI'H August' 19 7 8 UNIT NAME: Salem #1 DATE: S*eptember 12, 1978 COMPLETED BY: L.K. Miller TEIJEPllONE: 609-365-7000 X507 METHOD OF DURATION SHUITING LICENSE SYSTEM COMPONENT CAUSE AND CORRECTIVE DATE 1 2
<XlDE4 NO. TYPE (HOURS) IlEASON IXMN EVEN!' CODES ACfION 'ID REI\C'IDR REPORT II PRE\IENI' REOJRRENCE 78-137 8-21-78 F 45.75 G 1 --- IA PUMP XX Reactor trip due to loss of Reactor Coolant Pump.
- 12 Reactor Coolant Pump breaker was manually opened.78-138 8-23-78 F 0 A 4 --- HH FILTER Clean #11 and #13 Condensate Pump Suction Strainers.78-141 8-24-78 F 0 A 4 --- HC HTEXCH #llA Condenser leak.78-142 8-24-78 F 0 A 4 --- HC HTEXCH #llA Condenser leak.78-145 8-25-78 F 0 A 4 --- HC HTEXCH #12A Condenser leak.78-154 8-27-78 F 49.43 H 3 --- HA TURBIN Reactor trip due to a Maintenance error on the part o*f outside contractor causing turbine trip Page 5 of 15 ll'-1-'7.Rl
. MAJOR PLANT MODIFICA'9Ns UNIT -~1E: Salem I REPORT MONTH August 1978 Septei:nber 12, 1978 DATE:
COMPLETED BY: L. K. Miller TELEPHONE: 609-365-7000, X507
- DCR NO. PRINCIPLE SYSTEM SUBJECT l-ED-0364 Service Water Install Modified No. 14 s .w.
Pump l-ET-0400 4 kv Bus u.v. Relays Install Temporary D. c. Feed l-EX-0402 Circulating Water Determine Reduced c.w. Flow by Throttling Discharge V~lve l-OD-0048 Waste Liquid Replace Saunders Valves with Full Flow Plug Valves I,
- DESIGN CHANGE REQUEST Page 6 of 15 l_ 8-1-7.Rl
DOCKET NO.: 50-272
.=.,:._....-...-....~~~~~~-
MAJOR PLANT MODIFICAT~S Salem I UNIT,~:
IU:'PoRT MONTH August 1"'8 ATE: *September. 12, 1978 COMPLETED BY: L. K. Miller TELEPHONE: 609-365-7000, X507
- DCR NO. 10CFRSO. 59. SAFETY EVALUATION l-ED-0364 Setpoint change required to comply with new s.w. Pump performance curves. The change does not degrade system performance.
l-ET-0400 Addition of noise suppressor will not affect safety function of the relay. Safety analysis are not affected.
l-EX-0402 The implementation of this experiment does not affect any presently performed safety analysis nor does it create any new hazards. The basis of the Technical Specifications are not affected.
l-OD-0048 This DCR requests the substitution of plug-type valves for diaphragm-type valves. This change does not increase the probability or consequences of an accident, create a possibility for an accident or malfunction or reduce the margin of safety as previously defined.
- nESIGN CRAJ.'1GE .RF.QUEST Pa e 7 of ls
DOCKET NO.: 50-272
~~~~~~~~~~~~-
SUMMARY
OF SAFETY RELATED 'INTENANCE UN IT N~:~_s_a_l_e_m~#_l~~~~~~~-
Maintenance DATE: September 12, 1978 COMPLETED BY: L.K. Miller REPORT MONTH August, 1978 TELEPHONE: 609-365-7000 ( X507)
WORK ORDER EQUIPMENT FAILURE DESCRIPTION CORRECTIVE ACTION NO.
MD-2939 11RC17 Valve Packing leak. Tightened packing.
- 14 Service MD-2918 Water Auto Breaking shear keys. Replaced bottom wear Strainer shears and keys.
OD-10033 #12 Service Broken shear keys. Replaced shear keys.
Water Strainer MD-2781 Cask Handling Worn cable. Replaced cable.
Crane OD-8878 lDDC #27 Check for ground. Replaced limit switch.
Breaker MD-2916 Containment Failed leak test. Adjusted locking device.
Air Lock Inner Door -- - --
OD-9481 Service Water Pipe leak. Installed temporary Piping patch.
c OP-9431 Service Water Pipe leak. Installed temporary Piping patch.
OD-9527 #16 Service Broken shear key. Replaced distributor barrel Water Pump 0-ring and shear key.
Strainer --
OD-9909 13MS168 Valve Packing leak. Packing tightened.
OD-9474 #11 Chiller Leak. Replaced tubing reducer to Unit condenser.
OP-9885 12SW23 Valve Valve leak. Applied temporary patch and clamp.
OD-9535 #11 Service Housing leak. Temporary patch installed.
Water Pump
~ -- - Strainer 8-1-7.Rl Page 8 of 15
DOCKET NO.: 50-272
~~~~~~~~~~~~~
UNIT N~: Salem #1 sriMMA.RY. OF SAFETY RELATED .lrNTENANCE DATE: September 12, 1978 Performance COMPLETED BY: L. K. Miller REPORT MONTH August, 1978 TELEPHONE: 609-3£5-7000 (X507)
WORK ORDER EQUIPMENT FAILURE DESCRIPTION CORRECTIVE ACTION NO.
PD-4930 13RC431C Verify setpoint. Adjusted calibration of Tavg.
PD-4934 1PM505B Summa tor failed low. Replaced summator.
PD-4937 1PC526C Verify setpoints. Adjusted trip and reset points.
PD-4939 1PT536A/B Trips 8rnv high. Adjusted output #2 setpoint, PD-4944 1LC461A/B Verify setpoints. Adjusted setpoints.
PD-4902 11 Steam Stearn flow failed low. Repaired faulty Generator Steam connections on-the PCB Flow Channel II - - - ---* - - *-- - --Elco connector.
PD-4904 1TM441E High trip point. Adjusted trip points. - -
PD-4917 1FC511A/B Low setpoint. Adjusted setpoint.
PD-4920 14 Steam Out of calibration. Installed and calibrated Generator -* -* new PCB transmitter.
1LT549 11 Boric Acid PD-4926 Low setpoint. Calibrated.
Tank level 1LT106~
PD-4927 12 Batt. Level High transmitter Calibrated.
1LT102. output.
OD-9388 A.F.D. Recorder Out of calibration. Recalibrated recorder.
XA-8740 .
OD-9384 #13 Steam Verify stable operation .Recalibrated transmitter.
Generator Level .. *- --.
Page 10 of rt:;
8-1-7.Rl
DOCKET NO.: 50-272 SU~Y OF SAFETY RELATED IINTENANCE UNIT N~:~~-S-a_l_e_m~#-1~~~~~~
DEPARTMENT Maintenance DATE: SEi.ptember 12, 1978
~~~---~~~~--"-~~~-
REPORT MONTH August, 1978 C0 MP LET ED BY: L.K. Miller
~~~~~~~~~~~~-
TELEPHONE: 609-365-7000(X507)
~~~~~~~~~~~~-
WORK ORDER EQUIPMENT FAILURE DESCRIPTION CORRECTIVE ACTION NO.
OD-10051 #16 Service Strainer trips. Replaced moter, seals, Water Pump and fittings.
Strainer MD-8956 1CC190 Motor malfunctioning. Replaced motor.
OD-10124 13RC26 Valve Packing leak. Tightened packing nut.
MD-2951 Airlock Door Door leaks repacking Replaced two cam followers needed. and two inner door gaskets MD-2851 4kV Group UF Relays causing trips. Replaced relays.
Relays lH and lF OD-10077 11MS169 Valve Valve leaks through. Replaced stem and seat disc.
MD-2892 lA Diesel Spike on D.C. feed. Replaced power supply.
Controls" OD-9569 :#.T2 RHR Room ..
Cooler MD-2846 13CV78 Valve Bonnet leak. Furmanited valve.
OD-10099 13MS168 Valve Packing leak. Furmari+/-ted*~ackirig *gland.
OP-0311 #14 Service Replace pump. Removed and installed Water Pump rebuilt pump.
MD-2944 1CC190 Valve motor operator Replaced operator.
malfunctioning.
OD-10068 #13 Service Inch pushbutton not Cleaned threads and hole Water Screen working. on shaft.
8-1-7.Rl
DOCKET NO.: 50-272 SUMMA'RY OF SAFETY RELATED IINTENANCE UNIT N~: Salem #1 DATE: September 12, 1978 DEPARTMENT Performance COMPLETED BY: L.K. Miller REPORT MONTH August, 1978 TELEPHONE: 609-365-7000 (X507)
WORK ORDER EQUIPMENT FAILURE DESCRIPTION CORRECTIVE ACTION NO.
OD-9377 # 11 Steam Gen. Verify stable Replaced comparator and Low Low Level operation. calibrated 1LC518A/B.
OD-9337 #12 Boric Acid Hi-Low Temp. Alarm is Inserted fuse.
Tank, illuminated.
OD-9117 Safety Inject. Calibrate 11 and 12 Recalibrated-LT-934A, Accumulator Accumulator level. :Gf.r.,...9 35A ,_LT-9 35B, LT-9 34B.
OD-9260 Safety Inj-ectior Channel A shows Repaired sticking 11 .. Accum.Ch.A increase while Channel indicatoL~eplaced strain B is constant. gauge.
OD-9291 Safety Injection Channel A erratic. Repaired and -recalibrated
- 11 Accum. indicator.
Page 11 of 15 8-1-7. Rl
SALEM I OPERATING
SUMMARY
AUGUST 1978 8-1 Unit load was reduced to 50% to clean feed pump suction strainers. At 0900 a load increase was started and the unit reached full output at 2200. The unit remained at full load until 8-5.
8-5 At 2124 a load reduction to 70% was initiated in order to clean condensate pump suction strainers.
8-6 The unit returned to full load at 1200 and operated there the remainder of the day.
8-7 At 1455 a load reduction was initiated in order to clean feed pump suction strainers. At 2400 the unit was at 45%
load.
8-8 At 0030 the unit was at 40% load. At 0400 unit load reached 52%. This level was held while repairs were made to a feed pump recirculation valve. A load increase was started at 1200 but was terminated at 1448 due to turbine vibration.
Load was decreased from 62%-to 55% while the problem was analyzed. The vibration was caused by the failure of a turbine governor valve to open. The cause was a blown 0-ring in the E-H oil line. Repairs were made and a load increase was started at 1900.
8-9 The unit reached full load at 0642. The unit remained at full power until 8-15.
8-15 At 2045 a load reduction at 15%/HR. was initiated because of condenser tube leaks. Load was stabilized at 70%.
Page 12 of 15 i_
8-16 At 0330 a load increase was initiated at 5%/HR. The unit reached £ull load at 1000. The unit remained at £ull load until 8-21.
8-21 At 0312 load was decreased to 97% due to condenser tube leaks. At 0915 a Reactor/Turbine Trip occurred £rom £ull load. The trip was caused by a loss 0£ reactor coolant flow when a reactor coolant pump breaker opened.
8-23 The unit was taken critical at 0355. The delay in going critical was caused by repairs that had to be made to an inoperable £an coil unit. The unit was synchronized at 0700. A load increase was initiated and the unit reached 70% at 2000. The unit was held at this level while condensate suction strainers were cleaned. The load increase was continued at 2230.
8-24 The unit reached £ull load at 0600. At 0713 a load decrease was initiated due to high condenser backpressure.
Load was reduced to 78%. At 1155 load was £urther reduced to 70% when a circulator was removed from service. A load increase was initiated 2040.
8-25 The unit reached full load at 0300. At 0424 load was reduced to 90% due to condenser tube leaks. At 1022 power was increased to £ull load. At 1648 load was reduced to 91% in .order to remove a circulator from service.
8-26 At 1050 power was increased to full load and the unit operated at this level all day.
8-27 At 1257 a reactor/turbine trip occurred £rom £ull load when an outside contractor dropped an air horn on the turbine trip block.
Page 13 of 15
~
8-29 The unit was taken critical at 1000.
The delay in going critical was due to repairs to a containment fan coil unit, contai~ment air lock door, lA Vital Bus Instrument Inverter and the rod control system. The unit was synchronized at 1425 and at 2400 load had increased to 63%.
8-30 The unit reached full load at 0800 and remained at full load for the day.
8-31 The unit was at full load for the day.
Page 14 of 15
- DOCKET NO.: 50-272 UNIT: Salem No. 1 DATE: Septeinl5er 12 ~.1978 COMPLETED. BY: L.K. Miller TELEPHONE: 609-365-7000 X507 MONTH: August, 1978
- l. Refueling information has cha."'lged from last month:
YES X NO
- 2. Scheduled date of next refueling: March 31, 1979
- 3. Scheduled date for restart following refueling: May 26, 1979
~---------~
4 .. A. Will Technical Specification changes or other license
- amendments be required? YES NO _ __
NOT DETERMINED TO-DATE August, 1978 B. Has the reload fuel design. been reviewed by the Station Operating Review Cammi ttee'? YES NO X If no, when is i t scheduled?
- 5. Scheduled date(s) for submitting proposed licensing action:
February. 1979 if reg:ujred, 6.*
- Importan.t licensing considerations .associated with refueling:
None
- 7. Number of Fuel Assemblies:
A. In-Core 193 B. In Spent Ftiel Storage
- 8. Present licen~ed spent fuel storage capacity: 264
~-----------~
Future spent fuel storage capacity: 1 170
--~-=-:~------~
- 9. Da.te *of last refueling that can* be discharged to the spent. fuel pool assuming the present licensed capacity:. i:\pril, 1982
Page 15 of 15 8-l-7.R4