Public Service Electric and Gas Company Salem Nuclear Generating Station P.O. Box #168 Hancocks Bridge, New Jersey 08038 so-~1~
Director Off ice of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 MONTHLY OPERATING REPORT SALEM GENERATING STATION September 9, 1977
,,*(\\5'*;~0~r~~?2);**...
- ",**1*.:--
lrEc'[.1':~,o......
':~\\
v,
'-.\\
,....,f. 'I Sr.*1-; I
\\~-* \\
.. :~*-~
U.s, :t ~ 19J7 \\~:J UqE.4 I
- ". l\\
CoM R REGu
- --1
...._:'\\
trto;_1 ~:s~10,f4roR"1 ;~;-: /
... 1
- .. <.lto!J I, '/
'\\:~*c>z:;*>* --~-<(~2~))
....,,f../// I((~\\_\\/.
In compliance with Section 6.9, Reporting Requiremeri-ts---f'or the Salem Technical Specifications, the following Monthly Operating Reports for the month of August, 1977 are being sent to you.
(Original plus 10 copiesI Appendix B - Average Daily Unit Power Level Appendix C -
Operating Data Report Appendix D - Unit Shutdowns and Power Reductions Additional copies of the Monthly Operating Reports are being sent to:
- 1.
Mr. James P. O'Reilly Director of US NRC Off ice of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, PA 19406
- 2.
Director, Office of Management Information and Program Control US Nuclear Regulatory Commission Washington, DC 20555 (1 Copy)
(2 Copd:es)
Prior to August, 1977 the maximum dependable capability of Sale~ #1 Unit was based upon a circulating water inlet temperature of 70 F.
The revised M.D.C. for this unit will be 1079 (MWe - NetI.
The ba~is for this value is a circulating water inlet temperature of 77 F. which is the summer rating basis dictated by the P.J.M.
interconnection.
)/ q #~'1#~?
Manager ~~lem Generating Station Enc.
The Energy People
APPENDIX B J
AVERAGE DAILY UNIT POWER LEVEL MONTH August, 1977 DAY AVERAGE DAILY POWER LEVEL 1
2 3
4*
5 6
7 8
9 10 11 12 13 14 15 16.
Pg. 2-4 8.1-7.RL-(MWe-NET) 813 1,076 545 527 1,070 583 900 981 938 1,.076 910 723 257 418 1,069 1,070 DOCKET NO.
50-272 UNIT,
Salem #1 DATE Sept. 8, 1977 COMPLETED BY J.M. Zupko, Jr.
TELEPHONE 609-365-7000 X507 DAY AVERAGE DAILY POWER LEVEL (MWE-NET) 17 773 18 869 19 950 20 901 21 819 22 985 23 793 24 1,.031 25 1,072 26 1,011 27 533 28 934 29 902 30 816 31 841
- u-::b
- r.;.
Pg. :3-4 8-1-7.Rl-APPENDIX C OPERA'.llNG DATA REPOroe
~
~Tn 50-272
~*
IV* -----------
UNIT Salem No. 1 DATE 9-8-77 COOLE!'ED BY J.M. Zupko, Jr.
OPERATING STA'IUS TELEPHJNE
- 609-365-7000 X507
- 1. REPORI'ING PERIOD:August, 1977 GROSS HOURS IN REPORTING PERIOD:
744
- 2.
OJRRENl'LY AUllIDRIZED POWER LEVEL (MWt): 3338MAX.DEPEND.CAPACITY(MWe-NET):
1079 DESIGN ELECTRICAL RATING(MWe-Net):
1090
- 3.
roiiER LEVEL TO WHICli RESTRICTED (IF ANY) ()!We-Net) : __ N_o_n_e ____ _
- 4.
REASONS FOR RESI'RICTION (IF ANY) :.
THIS MJNI'H YR TO DATE CtMJLATIVE 4,789.3 S.
NteER OF HJURS REACTOR WAS CRITICAL *
- 6.
REACl'OR RESERVE SHDTOOWN HOURS * * * * *
- 1.
HOURS GENERATOR ON LINE * * *.......
- 8. UNIT RESERVE SHt1I'OOWN HOURS * * * * * * *
- 726. 7.
o.o 718.6 o.o 4,487.7
. o.o 4,090~5 o.o o.o 4,130.8 o.o
- 9.
GROSS mERrvJAL ENERGY GENERATED(}ll'YH). * *
- 2,040,089 9.,202~949
- 9,251,646
- 10.
GROSS ELECTRICAL ENERGY' GENERATED(}n'iH). *
- 661,150 ll. NET ELECTRICAL ENERGY GENERATED (MMi) * * *
- 628, 9.9.6
- 12.
REACTOR SERVICE FACTOR * * * * * * * * **
9.7.7 9.7.7
- 13.
REACTOR AVAILABILIT'f FACI'OR *........ ----
- 14.
UNIT SERVICE FACTOR * * * * *
- 15.
UNIT AVAILABILIT'f FACTOR
- I
- 16. UNIT CAPACITY' FACTOR(Using MDC)*
- 96.6 96.7 78.4
- 17.
UNIT CAPACITf FACI'OR(Using Design MW'e) * *
- 77.6
- 18.
UNIT FORCED OUI'AGE RATE I
I I
I I
3
- 4 2,944,090 2,947,320 2,722,594 2,722,594 89.6 89.6 89..6 89..6 87.7 87.7 87.7 67.9 67.9 67.2 67.2
- 12. 7.
12.7
- 19.
SHUl'OOWNS SamootED OVEl NEXT 6 MJNIRS(TYPE,DATE,.AND DURATJ;ON OF EAQ1):
9-17-77 Modification of IDil Pressure Turbine. Scheduled cight week outage.
- 20.
IF SHCIT OOl'IN AT END OF REPORI' PERIOD, ESTIMATED DATE OF ST6.\\RTUP:
N/A
_..;;.;:~----
- 21.
UNITS IN 'l'E.:l""T ST.ATUS(PRIOR TO CCMifERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITf 9-30-76 12-11-76 INITIAL ELECTRICITY
<Df.1ERCIAL OPERATION 11-01-76 12-20-76 12-25-76 6-30':""77
APPENDIX D DOCKET NO.
50.,-272 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Salem No. 1 DATE September 8, 1977 COMPLETED BY J.M. Zupko, Jr.
TELEPHONE 609-365-7000 X507 REPORT MONTH August, 1977 METHOD OF TYPE OUTAGE SHUTTING DOWN F: FORCED DURATION Tiffi REACTOR OR NO.
DATE S: SCHEDULED (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS/COMMENTS Clean Condensate Pump 77-82 7-31-77 F
o.o H
4 Strainers 77-83 8...-1-77 F
o*o.o H
4 Clean llA Circulator Traveling Screens 77.,..94 9.,..1.,...77 F
o.o H
4 Clean llB Circulator Traveling Screens 77-85 8.,-3-77 F
o.o H
4 Clean Condensate Pump Strainers 77-86 9.,...3.,...77 F
o.o H
4 Clean 13A Circulator Traveling Screens 77-87 8-3-77 F
- 9. 7 G
-3 Personnel error during routine testing of S.S.P.S., Train A 77":"'88 9.,...s.,...77 F
0.0 H
4 Clean 11, 12 S.G. Feed Pump Strainers.
77.,..99 8.,-6-77 F
o.o H
4 Clean 12A & 13A Circulator Traveling Screens 77-90 8-9-77 F
o.o H
4 Clean 13 Condensate Pump Strainers P
SUMMARY
g.4-4 8.1-7.R 1
- LOAD REDUCTION.
TYPE F: FORCED NO.
DATE S: SCHEDULED
- 77-91 8-9-77 F
- 77-92 B-11-77 F
- 77-93 8-11-77 F
- 77-94 B-13-77 F
77-95 8.-13-77 F
77-96 8-13-77 F
- 77-97 8-17-77 F
- 77-98 B-17-77 F
- 77-99 8.,.-18-77 F
- 77-100 8-18-77 F
P 4
SUMM.'\\RY:
- g. -4
- LOAD REDUCTION.
8.1-7.R 1 APPENDIX D DOCKET NO.
50-272 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME
~alernNo.l DATE August 8, 1977 COMPLETED BY J.M. Zupko, Jr.
TELEPHONE 609-365-7000 X507 REPORT MONTH August, 19 77 METHdD OF OUTAGE SHUTTING DOWN DURATION THE REACTOR OR (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS/COMMENTS o.o A
4 llB Circulator Traveling Screen Spray Header Repair 0.0 A
4 13 Condensate Pump Upper Bearing Cooler Repair 0.0 A
. 4.
11 Condensate Pump Upper Bearing Replacement o.o H
4 Clean 13 Condensate Pump Strainer 8.4 A
3 12 S.G. Hi Fl011/lD Level Trip -
12 S.G. Feed Pump Auto/Manual Station Failure.
7.3 A
3 IDose Cover to Turbine Trip Plate Mechanism Causing Turbine to Unlatch.
o.o H
4 Clean Condensate Pump Strainers o.o H
4 Clean 12 S.G. Feed Pump Strainer 0.0 H
4 Clean 11 S.G. Feed Pump Strainer o.o H
4 Clean Condensate Pump Strainers
NO.
- 77-101
- 77-102
- 77-103
- 77*.-104
- 77-105
- 77-106
- 77-107
SUMMARY
Pg.4-4 8.1-7.R 1 TYPE F: FORCED DATE S: SCHEDULED 8-20-77 F
8-21-77 F
8-21-77 F
8-23-77 F
8-23-77 F
8-27-77 F
8-28-77 F
- LOAD REDUCTION.
1 APPENDIX D DOCKET NO.
50-272 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME (3alern No. 1 DATE August 8, 1977 COMPLETED BY J.M. Zupko, Jr.
TELEPHONE 609-365-7000 X507 REPORT MONTH August, 1977 METHOD OF OUTAGE SHUTTING DOWN DURATION THE REACTOR OR (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS/COMMENTS o.o H
4 Clean 12 S.G. Feed Pump Strainers 0.0 H
4 Clean 11 S.G. Feed Pump Strainers o.o H
4 Clean 13A Circulator Traveling Screens o.o H
4 Clean 12, 13 Condensate PUmp Strainers 0.0 A
4 13 Condensate Pump Upper Bearing Cooler Repair o.o D
4 Quandrant Paver Tilt Ratio Exceed' Tech. Spec. Lirni ts 0.0 H
4 Clean 12, 13 Condensate Pump Strainers