Submit Monthly Operating Report for the Month of August 1977 for Salem No. 1
ML19030A351
Person / Time
Site: Salem  PSEG icon.png
Issue date: 09/09/1977
From: Heller H
Public Service Electric & Gas Co
To:
NRC/IE, Office of Nuclear Reactor Regulation
References
Download: ML19030A351 (6)


Text

Public Service Electric and Gas Company Salem Nuclear Generating Station P.O. Box #168 Hancocks Bridge, New Jersey 08038 so-~1~

Director Off ice of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555 MONTHLY OPERATING REPORT SALEM GENERATING STATION September 9, 1977

,,*(\\5'*;~0~r~~?2);**...

  • ",**1*.:--

lrEc'[.1':~,o......

':~\\

v,

'-.\\

,....,f. 'I Sr.*1-; I

\\~-* \\

.. :~*-~

U.s, :t ~ 19J7 \\~:J UqE.4 I

  • ". l\\

CoM R REGu

--1

...._:'\\

trto;_1 ~:s~10,f4roR"1 ;~;-: /

... 1

  • .. <.lto!J I, '/

'\\:~*c>z:;*>* --~-<(~2~))

....,,f../// I((~\\_\\/.

In compliance with Section 6.9, Reporting Requiremeri-ts---f'or the Salem Technical Specifications, the following Monthly Operating Reports for the month of August, 1977 are being sent to you.

(Original plus 10 copiesI Appendix B - Average Daily Unit Power Level Appendix C -

Operating Data Report Appendix D - Unit Shutdowns and Power Reductions Additional copies of the Monthly Operating Reports are being sent to:

1.

Mr. James P. O'Reilly Director of US NRC Off ice of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, PA 19406

2.

Director, Office of Management Information and Program Control US Nuclear Regulatory Commission Washington, DC 20555 (1 Copy)

(2 Copd:es)

Prior to August, 1977 the maximum dependable capability of Sale~ #1 Unit was based upon a circulating water inlet temperature of 70 F.

The revised M.D.C. for this unit will be 1079 (MWe - NetI.

The ba~is for this value is a circulating water inlet temperature of 77 F. which is the summer rating basis dictated by the P.J.M.

interconnection.

)/ q #~'1#~?

Manager ~~lem Generating Station Enc.

The Energy People

APPENDIX B J

AVERAGE DAILY UNIT POWER LEVEL MONTH August, 1977 DAY AVERAGE DAILY POWER LEVEL 1

2 3

4*

5 6

7 8

9 10 11 12 13 14 15 16.

Pg. 2-4 8.1-7.RL-(MWe-NET) 813 1,076 545 527 1,070 583 900 981 938 1,.076 910 723 257 418 1,069 1,070 DOCKET NO.

50-272 UNIT,

Salem #1 DATE Sept. 8, 1977 COMPLETED BY J.M. Zupko, Jr.

TELEPHONE 609-365-7000 X507 DAY AVERAGE DAILY POWER LEVEL (MWE-NET) 17 773 18 869 19 950 20 901 21 819 22 985 23 793 24 1,.031 25 1,072 26 1,011 27 533 28 934 29 902 30 816 31 841

  • u-::b
  • r.;.

Pg. :3-4 8-1-7.Rl-APPENDIX C OPERA'.llNG DATA REPOroe

~

~Tn 50-272

~*

IV* -----------

UNIT Salem No. 1 DATE 9-8-77 COOLE!'ED BY J.M. Zupko, Jr.

OPERATING STA'IUS TELEPHJNE

  • 609-365-7000 X507
1. REPORI'ING PERIOD:August, 1977 GROSS HOURS IN REPORTING PERIOD:

744

2.

OJRRENl'LY AUllIDRIZED POWER LEVEL (MWt): 3338MAX.DEPEND.CAPACITY(MWe-NET):

1079 DESIGN ELECTRICAL RATING(MWe-Net):

1090

3.

roiiER LEVEL TO WHICli RESTRICTED (IF ANY) ()!We-Net) : __ N_o_n_e ____ _

4.

REASONS FOR RESI'RICTION (IF ANY) :.

THIS MJNI'H YR TO DATE CtMJLATIVE 4,789.3 S.

NteER OF HJURS REACTOR WAS CRITICAL *

6.

REACl'OR RESERVE SHDTOOWN HOURS * * * * *

  • 1.

HOURS GENERATOR ON LINE * * *.......

8. UNIT RESERVE SHt1I'OOWN HOURS * * * * * * *
  • 726. 7.

o.o 718.6 o.o 4,487.7

. o.o 4,090~5 o.o o.o 4,130.8 o.o

9.

GROSS mERrvJAL ENERGY GENERATED(}ll'YH). * *

  • 2,040,089 9.,202~949
  • 9,251,646
10.

GROSS ELECTRICAL ENERGY' GENERATED(}n'iH). *

  • 661,150 ll. NET ELECTRICAL ENERGY GENERATED (MMi) * * *
  • 628, 9.9.6
12.

REACTOR SERVICE FACTOR * * * * * * * * **

9.7.7 9.7.7

13.

REACTOR AVAILABILIT'f FACI'OR *........ ----

14.

UNIT SERVICE FACTOR * * * * *

15.

UNIT AVAILABILIT'f FACTOR

  • I
16. UNIT CAPACITY' FACTOR(Using MDC)*
  • 96.6 96.7 78.4
17.

UNIT CAPACITf FACI'OR(Using Design MW'e) * *

  • 77.6
18.

UNIT FORCED OUI'AGE RATE I

I I

I I

3

  • 4 2,944,090 2,947,320 2,722,594 2,722,594 89.6 89.6 89..6 89..6 87.7 87.7 87.7 67.9 67.9 67.2 67.2
12. 7.

12.7

19.

SHUl'OOWNS SamootED OVEl NEXT 6 MJNIRS(TYPE,DATE,.AND DURATJ;ON OF EAQ1):

9-17-77 Modification of IDil Pressure Turbine. Scheduled cight week outage.

20.

IF SHCIT OOl'IN AT END OF REPORI' PERIOD, ESTIMATED DATE OF ST6.\\RTUP:

N/A

_..;;.;:~----

21.

UNITS IN 'l'E.:l""T ST.ATUS(PRIOR TO CCMifERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITf 9-30-76 12-11-76 INITIAL ELECTRICITY

<Df.1ERCIAL OPERATION 11-01-76 12-20-76 12-25-76 6-30':""77

APPENDIX D DOCKET NO.

50.,-272 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Salem No. 1 DATE September 8, 1977 COMPLETED BY J.M. Zupko, Jr.

TELEPHONE 609-365-7000 X507 REPORT MONTH August, 1977 METHOD OF TYPE OUTAGE SHUTTING DOWN F: FORCED DURATION Tiffi REACTOR OR NO.

DATE S: SCHEDULED (HOURS)

REASON REDUCING POWER CORRECTIVE ACTIONS/COMMENTS Clean Condensate Pump 77-82 7-31-77 F

o.o H

4 Strainers 77-83 8...-1-77 F

o*o.o H

4 Clean llA Circulator Traveling Screens 77.,..94 9.,..1.,...77 F

o.o H

4 Clean llB Circulator Traveling Screens 77-85 8.,-3-77 F

o.o H

4 Clean Condensate Pump Strainers 77-86 9.,...3.,...77 F

o.o H

4 Clean 13A Circulator Traveling Screens 77-87 8-3-77 F

9. 7 G

-3 Personnel error during routine testing of S.S.P.S., Train A 77":"'88 9.,...s.,...77 F

0.0 H

4 Clean 11, 12 S.G. Feed Pump Strainers.

77.,..99 8.,-6-77 F

o.o H

4 Clean 12A & 13A Circulator Traveling Screens 77-90 8-9-77 F

o.o H

4 Clean 13 Condensate Pump Strainers P

SUMMARY

g.4-4 8.1-7.R 1

  • LOAD REDUCTION.

TYPE F: FORCED NO.

DATE S: SCHEDULED

  • 77-91 8-9-77 F
  • 77-92 B-11-77 F
  • 77-93 8-11-77 F
  • 77-94 B-13-77 F

77-95 8.-13-77 F

77-96 8-13-77 F

  • 77-97 8-17-77 F
  • 77-98 B-17-77 F
  • 77-99 8.,.-18-77 F
  • 77-100 8-18-77 F

P 4

SUMM.'\\RY:

g. -4
  • LOAD REDUCTION.

8.1-7.R 1 APPENDIX D DOCKET NO.

50-272 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME

~alernNo.l DATE August 8, 1977 COMPLETED BY J.M. Zupko, Jr.

TELEPHONE 609-365-7000 X507 REPORT MONTH August, 19 77 METHdD OF OUTAGE SHUTTING DOWN DURATION THE REACTOR OR (HOURS)

REASON REDUCING POWER CORRECTIVE ACTIONS/COMMENTS o.o A

4 llB Circulator Traveling Screen Spray Header Repair 0.0 A

4 13 Condensate Pump Upper Bearing Cooler Repair 0.0 A

. 4.

11 Condensate Pump Upper Bearing Replacement o.o H

4 Clean 13 Condensate Pump Strainer 8.4 A

3 12 S.G. Hi Fl011/lD Level Trip -

12 S.G. Feed Pump Auto/Manual Station Failure.

7.3 A

3 IDose Cover to Turbine Trip Plate Mechanism Causing Turbine to Unlatch.

o.o H

4 Clean Condensate Pump Strainers o.o H

4 Clean 12 S.G. Feed Pump Strainer 0.0 H

4 Clean 11 S.G. Feed Pump Strainer o.o H

4 Clean Condensate Pump Strainers

NO.

  • 77-101
  • 77-102
  • 77-103
  • 77*.-104
  • 77-105
  • 77-106
  • 77-107

SUMMARY

Pg.4-4 8.1-7.R 1 TYPE F: FORCED DATE S: SCHEDULED 8-20-77 F

8-21-77 F

8-21-77 F

8-23-77 F

8-23-77 F

8-27-77 F

8-28-77 F

  • LOAD REDUCTION.

1 APPENDIX D DOCKET NO.

50-272 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME (3alern No. 1 DATE August 8, 1977 COMPLETED BY J.M. Zupko, Jr.

TELEPHONE 609-365-7000 X507 REPORT MONTH August, 1977 METHOD OF OUTAGE SHUTTING DOWN DURATION THE REACTOR OR (HOURS)

REASON REDUCING POWER CORRECTIVE ACTIONS/COMMENTS o.o H

4 Clean 12 S.G. Feed Pump Strainers 0.0 H

4 Clean 11 S.G. Feed Pump Strainers o.o H

4 Clean 13A Circulator Traveling Screens o.o H

4 Clean 12, 13 Condensate PUmp Strainers 0.0 A

4 13 Condensate Pump Upper Bearing Cooler Repair o.o D

4 Quandrant Paver Tilt Ratio Exceed' Tech. Spec. Lirni ts 0.0 H

4 Clean 12, 13 Condensate Pump Strainers