Submit Monthly Operating Report for the Month of August 1977 for Salem No. 1
ML19030A351
Person / Time
Site: Salem  PSEG icon.png
Issue date: 09/09/1977
From: Heller H
Public Service Electric & Gas Co
To:
NRC/IE, Office of Nuclear Reactor Regulation
References
Download: ML19030A351 (6)


Text

Public Service Electric and Gas Company Salem Nuclear Generating Station P.O. Box #168 Hancocks Bridge, New Jersey 08038 so-~1~

September 9, 1977

,,*(\5'*;~0~r~~?2);**. .

Director *",**1*.:-- lrEc'[.1':~,o. . . .':~\

Off ice of Inspection and Enforcement " Sr.*1-; I v,* '-.\

U.S. Nuclear Regulatory Commission Washington, D.C. 20555

,....,f.'I

.. :~*-~ U.s,

  • ". l\
t UqE.4 CoM R REGu

~ 19J7 \~:J

\~-* \

I

--1

. . ._:'\ trto;_1 ~:s~10,f4roR"1 ;~;-: /

... 1 * ..<.lto!J I , '/

MONTHLY OPERATING REPORT SALEM GENERATING STATION

'\:~*c>z:;*>* --~-<(~2~))

....,,f../// I((~\_\/.

In compliance with Section 6.9, Reporting Requiremeri-ts---f'or the Salem Technical Specifications, the following Monthly Operating Reports for the month of August, 1977 are being sent to you.

(Original plus 10 copiesI Appendix B - Average Daily Unit Power Level Appendix C - Operating Data Report Appendix D - Unit Shutdowns and Power Reductions Additional copies of the Monthly Operating Reports are being sent to:

1. Mr. James P. O'Reilly (1 Copy)

Director of US NRC Off ice of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, PA 19406

2. Director, Office of Management Information (2 Copd:es) and Program Control US Nuclear Regulatory Commission Washington, DC 20555 Prior to August, 1977 the maximum dependable capability of Sale~ #1 Unit was based upon a circulating water inlet temperature of 70 F.

The revised M.D.C. for this unit will be 1079 (MWe - NetI. The ba~is for this value is a circulating water inlet temperature of 77 F. which is the summer rating basis dictated by the P.J.M.

interconnection.

Manager

)/~~lem q #~'1#~? Generating Station Enc.

The Energy People

APPENDIX B

,. J AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

- 272 UNIT , Salem #1 DATE Sept. 8, 1977 COMPLETED BY J.M. Zupko, Jr.

TELEPHONE 609-365-7000 X507 MONTH August, 1977 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NET) (MWE-NET) 1 813 17 773 1,076 869 2 18 3 545 19 950 527 901 4* 20 1,070 21 819 5

583 985 6 22 7 900 23 793 981 24 1,.031 8

9 938 25 1,072 10 1,.076 26 1,011 11 910 27 533 723 934 12 28 257 902 13 29 418 30 816 14 1,069 841 15 31 16 . 1,070 Pg. 2-4 8.1-7.RL-

APPENDIX C OPERA'.llNG DATA REPOroe

~ ~Tn 50-272

~* IV* - - - - - - - - - - -

UNIT Salem No. 1 DATE 9-8-77

            • ""*** COOLE!'ED BY J.M. Zupko, Jr.

OPERATING STA'IUS TELEPHJNE

  • 609-365-7000 X507
  • u-::b
  • 1. REPORI'ING PERIOD:August, 1977 GROSS HOURS IN REPORTING PERIOD:

744

2. OJRRENl'LY AUllIDRIZED POWER LEVEL (MWt): 3338MAX.DEPEND.CAPACITY(MWe-NET): 1079 DESIGN ELECTRICAL RATING(MWe-Net): 1090
3. roiiER LEVEL TO WHICli RESTRICTED (IF ANY) ()!We-Net) :__N_o_n_e_ _ _ __
4. REASONS FOR RESI'RICTION (IF ANY) : .

THIS MJNI'H YR TO DATE CtMJLATIVE S. NteER OF HJURS REACTOR WAS CRITICAL

  • 726. 7. 4,487.7 4,789.3
6. REACl'OR RESERVE SHDTOOWN HOURS * * * *
  • o.o . o.o o.o
  • 1. HOURS GENERATOR ON LINE * * * ....... 718.6 4,090~5 4,130.8 o.o o.o o.o 8.

9.

UNIT RESERVE SHt1I'OOWN HOURS * * * * * * *

  • GROSS mERrvJAL ENERGY GENERATED(}ll'YH). * *
  • 2,040,089 9.,202~949
  • 9,251,646
10. GROSS ELECTRICAL ENERGY' GENERATED(}n'iH). *
  • 661,150 2,944,090 2,947,320 ll. NET ELECTRICAL ENERGY GENERATED (MMi) * * *
  • 628, 9.9.6 2,722,594 2,722,594
12. REACTOR SERVICE FACTOR * * * * * * * * ** 9.7.7 89.6 89.6
13. REACTOR AVAILABILIT'f FACI'OR * . . . . . . .. ---- 9.7.7 89..6 89..6
14. UNIT SERVICE FACTOR * * * *
  • 96.6 87.7
15. UNIT AVAILABILIT'f FACTOR
  • I * * * . . 96.7
    • 87.7 87.7 UNIT CAPACITY' FACTOR(Using MDC)* * . . . . . 78.4 67.9 67.9 16.

67.2 67.2

17. UNIT CAPACITf FACI'OR(Using Design MW'e) * *
  • 77 .6
18. UNIT FORCED OUI'AGE RATE I I * *
  • I I I *
  • 3 *4 12. 7. 12.7
19. SHUl'OOWNS SamootED OVEl NEXT 6 MJNIRS(TYPE,DATE,.AND DURATJ;ON OF EAQ1): 9-17-77 Modification of IDil Pressure Turbine. Scheduled cight week outage.
  • r.;. 20. IF SHCIT OOl'IN AT END OF REPORI' PERIOD, ESTIMATED DATE OF ST6.\RTUP: _ N/A

_..;;.;:~----

21. UNITS IN 'l'E.:l""T ST.ATUS(PRIOR TO CCMifERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITf 9-30-76 12-11-76 INITIAL ELECTRICITY 11-01-76 12-25-76 Pg. :3-4

<Df.1ERCIAL OPERATION 12-20-76 6-30':""77 8-1-7.Rl-

APPENDIX D DOCKET NO. 50.,-272 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Salem No. 1 DATE September 8, 1977 COMPLETED BY J.M. Zupko, Jr.

TELEPHONE 609-365-7000 X507 REPORT MONTH August, 1977 METHOD OF TYPE OUTAGE SHUTTING DOWN F: FORCED DURATION Tiffi REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS/COMMENTS Clean Condensate Pump

  • 77-82 7-31-77 F o.o H 4 Strainers
  • 77-83 8...-1-77 F o*o.o H 4 Clean llA Circulator Traveling Screens
  • 77.,..94 9.,..1.,...77 F o.o H 4 Clean llB Circulator Traveling Screens
  • 77-85 8.,-3-77 F o.o H 4 Clean Condensate Pump Strainers
  • 77-86 9.,...3.,...77 F o.o H 4 Clean 13A Circulator Traveling Screens 77-87 8-3-77 F 9. 7 G -3 Personnel error during routine testing of S.S.P.S., Train A
  • 77":"'88 9.,...s.,...77 F 0.0 H 4 Clean 11, 12 S.G. Feed Pump Strainers.
  • 77.,..99 8.,-6-77 F o.o H 4 Clean 12A & 13A Circulator Traveling Screens
  • 77-90 8-9-77 F o.o H 4 Clean 13 Condensate Pump Strainers

SUMMARY

*LOAD REDUCTION.

Pg.4-4 8.1-7.R 1

APPENDIX D DOCKET NO. 50-272 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME ~alernNo.l DATE August 8, 1977 "

COMPLETED BY J.M. Zupko, Jr.

TELEPHONE 609-365-7000 X507 REPORT MONTH August, 19 77 METHdD OF TYPE OUTAGE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS/COMMENTS

  • 77-91 8-9-77 F o.o A 4 llB Circulator Traveling Screen Spray Header Repair 77-92 B-11-77 F 0.0 A 4 13 Condensate Pump Upper Bearing
  • Cooler Repair 77-93 8-11-77 F 0.0 A . 4. 11 Condensate Pump Upper Bearing
  • Replacement
  • 77-94 B-13-77 F o.o H 4 Clean 13 Condensate Pump Strainer 77-95 8.-13-77 F 8.4 A 3 12 S.G. Hi Fl011/lD Level Trip -

12 S.G. Feed Pump Auto/Manual Station Failure.

77-96 8-13-77 F 7.3 A 3 IDose Cover to Turbine Trip Plate Mechanism Causing Turbine to Unlatch.

  • 77-97 8-17-77 F o.o H 4 Clean Condensate Pump Strainers
  • 77-98 B-17-77 F o.o H 4 Clean 12 S.G. Feed Pump Strainer
  • 77-99 8.,.-18-77 F 0.0 H 4 Clean 11 S.G. Feed Pump Strainer
  • 77-100 8-18-77 F o.o H 4 Clean Condensate Pump Strainers SUMM.'\RY: *LOAD REDUCTION.

Pg. 4 -4 8.1-7.R 1

APPENDIX D DOCKET NO. 50-272 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME (3alern No. 1 DATE August 8, 1977 COMPLETED BY J.M. Zupko, Jr.

TELEPHONE 609-365-7000 X507 REPORT MONTH August, 1977 METHOD OF TYPE OUTAGE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS/COMMENTS

  • 77-101 8-20-77 F o.o H 4 Clean 12 S.G. Feed Pump Strainers
  • 77-102 8-21-77 F 0.0 H 4 Clean 11 S.G. Feed Pump Strainers
  • 77-103 8-21-77 F o.o H 4 Clean 13A Circulator Traveling Screens
  • 77*.-104 8-23-77 F o.o H 4 Clean 12, 13 Condensate PUmp Strainers
  • 77-105 8-23-77 F 0.0 A 4 13 Condensate Pump Upper Bearing Cooler Repair
  • 77-106 8-27-77 F o.o D 4 Quandrant Paver Tilt Ratio Exceed' Tech. Spec. Lirnits
  • 77-107 8-28-77 F 0.0 H 4 Clean 12, 13 Condensate Pump Strainers

SUMMARY

*LOAD REDUCTION.