ML19030A349

From kanterella
Jump to navigation Jump to search
Submit Monthly Operating Report for the Month of September 1977 for Salem No. 1
ML19030A349
Person / Time
Site: Salem  PSEG icon.png
Issue date: 10/05/1977
From: Heller H
Public Service Electric & Gas Co
To:
NRC/IE, Office of Nuclear Reactor Regulation
References
Download: ML19030A349 (5)


Text

...

PS~G*

Public Service Electric and Gas Company Salem Generating Station P. 0. Box #168 Hancocks Bridge, New Jersey 08038 October 5, 1977 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

MONTHLY OPERATING REPORT SALEM NO. 1 DOCKET NO. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, 10 copies of the following monthly operating reports for the month of September 1977 are being sent to you.

Appendix B -

Average Daily Unit Power Level Appendix C -

Operating Data Report Appendix D -

Unit Shutdowns and Power Reductions Sincerely yours, H. J. Heller Manager -

Salem Generating Station JMZ:dmh CC:

Mr. Boyce H. Grier Director of U.S. NRC Off ice of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pa.

19406 Director, Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, D.C.

20555

( 1 Copy)

(2 Copies) 95-2189 (2M) 10-76

APPENDIX B AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-272 UNIT,

Salem #1 DATE October 5, 1977 COMPLETED BY J.M. Zupko, Jr.

TELEPHONE 609-365-7000 X507 MONTH September DAY AVER.t\\GE DAILY POWER LEVEL DAY AVER.t\\GE DAILY POWER LEVEL 1

2 3

4 5

6 7

8 9

10 11 12 13 14

15.

16 Pg. 2-4 8.1-7.Rr..

(MWe-NET) 914 1047 1077 1069 1080 1070 1083 1059 1056

.*756 926 1061 953 752 801 728 (MWE-NET) 17 0

18 0

19 0

20 0

21 0

22 0

23 0

24 0

25 0

26 0

27 0

28 0

29 0

30 0

31 0

~

J.*

Pg, 3-4 8-1-7.Rt

.APPENDIX C OPERA'IlNG DATA REPO.

DOCKEl' NO.

50..-272 UNIT Salem #1 DATE 10/5/77 C04PLEI'ED BY J.M. Zupko, Jr.

OPERATING sr.A'IUS TELEPHJNE

  • 609-365-7000 X507
1.

REPORTING PERIOD: September, 1977 GROSS HOURS IN REPORTING PERIOD:_.-7-=2~0 ___

2.

CURRENTLY AU'IHORIZED POWER LEVEL (MWt) :3338 MAX.DEPEMJ.CAPACI'I"f(MWe-NET):

1079 DFSIGN ELECTRICAL BATING(.MWe-Net):

1090

3.

PCWER. LEVEL TO WHICi RESTRICTED (IF.ANY)(MWe-Net) : __

N_o_ne _____

4.

REASONS FOR RES'l'RIC'l'ION (IF ANY) :.

THIS MJNnI YR TO DATE CUMULATIVE S.

NtM3ER OF muRS REACTOR WAS CRITICAL *

6.

REACTOR RF.5ERVE SHll'I'IXJWN HOURS * * * *

... 383.4 1,738.6 1,738.6 o.o o.o o.o 383.4 1,709.3 1,709.3

  • 1.

HOURS GENERATOR ON LINE * * *

8.

UNIT RESERVE SWI'OOWN HOURS

  • 0.0 o.o 0.0
9.

GROSS THERMAL ENERGY GENERA.TED(}B'IH). * *

  • 1,175, 789
  • 4,810,903 4,810,903
10.

GROSS ELECTRICAL ENERGY GENERATED(Ml'JH). *

  • 387,410 1,558,940 1,558,940
11.

NET ELECI'RICAL ENERGY GENERA.TED(Ml'IH). * *

  • 367,446 1,475,577 1,475,577
12.

REACTOR SERVICE FACTOR * * * * * *****

53.3 53.3

13.

REACTOR AVAILABILITI FACTOR

  • 53.3
14.

UNIT SERVICE F.ACI'OR * * * * * * *.... **--------

lS.

UNIT AVArl>>>Il.IT'f FACTOR * ****

16.= UNIT CAPACITY' FACIOR(Using MDC). *

53. 3
47. 3
17.

tlN1T CAPACITY' FACTOR(Using Design MWe)

  • 46.8
18.

UNIT FORCED cur.AGE RATE * * * * * * * * *

  • 0 77.9 77.9 77.9 77.9 76.6 76.6 76.6 76.6 61.3 61.3 60.7 60~7 8.79 8.79
19.

SHUTOOWNS SQiEDULED OVER NEcr 6 MJNI'HS(TYPE,DATE,.AND DURATJ;ON OF EACE):

ZO.

IF SHtrr DOi~N AT END OF REPORI' PERIOD, ESTIMATED DATE OF ST.~: Nov. 12, 1977 Zl.

UNITS IN TES! STAroS (PRIOR TO CGMERCIAL OPERATION) :

FORECAST INITIAL CRITICALITf 9-30-76 INITIAL ELEC'I1UCl'I"f 11-01-7 6 CCMERCIAL OPERATION 12-20-76

.ACHIEVED 12-11-76 12-25-76 6-30-77

NO.77-108 77-109 77-110 77-111 77-112 77-113 77-114 77-115 77-116 Pg.4-4 8.1-7.R 1 DATE 9-1-77 9-9-77 9-10-77 9-13-77 9-14.,...77 9-14-77 9-15-77 9-15-77 9-15-77 TYPE F: FORCED S: SCHEDULED F

s F

F F

F F

F F

APPENDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH September, 1977 METHOD OF OUTAGE SHUTTING DOWN DURATION THE REACTOR OR (HOURS)

REASON REDUCING POWER o.o A

4 0.0 H

4 0.0 H

4 0.0 H

4 o.o H

4 0.0 H

4 0.0 H

4 0.0 H

4 0.0 H

4 DOCKET NO.

50-272

~

UNIT NAME Salem #1 October 6, 1977

'~

DATE COMPLETED BY J. M. Zupko, Jr.

TELEPHONE 609-365-7000 X507 CORRECTIVE ACTIONS/COMMENTS Repair #13 Condensate Upper Motor Bearing Reservoir Gasket.

Cleaned #11 & #12 Condensate Pump Strainer.

Cleaned #12 S.G. Feed Pump Strainei Cleaned #11 & #12 S.G. Feed Pump Strainer.

Cleaned #13 Condensate Pump Strainer.

Cleaned #12 Condensate Pump Strainer and changed oil in Upper Motor Bearing.

Cleaned #12 Condensate and 12 S.G.

Feed Pump Strainers.

Cleaned #13 Condensate Strainer.

Cleaned #12 S.G. Feed Pump Strainer.

NO.77-117 77-118 Pg.4-4 8.1-7.R 1 DATE 9..-16-77 9-16-77 TYPE F: FORCED S: SCHEDULED F

s APPENDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH September, 1977 METHOD OF OUTAGE SHUTTING DOWN DURATION THE REACTOR OR (HOURS)

REASON REDUCING POWER 0.0 H',

4 336.3 B

1 DOCKET NO.

50-272 UNIT NAME Salem #1 l

DATE October 6, 1977

  • COMPLETED BY J. M. Zupko, Jr.

1 TELEPHONE 609-365-7000 X507 CORRECTIVE ACTIONS/COMMENTS Cleaned #13 Condensate Pump Strainer.

Planned OUtage.