Submit Monthly Operating Report for the Month of December 1976 for Salem No. 1
ML19030A369
Person / Time
Site: Salem  PSEG icon.png
Issue date: 01/12/1977
From: Heller H
Public Service Electric & Gas Co
To:
NRC/IE, Office of Nuclear Reactor Regulation
References
Download: ML19030A369 (4)


Text

.\ _,/

Public Service Electric and Gas Company Salem Generating Station P. 0. Box #168 Hancocks Bridge, New Jersey 08038 January 12, 1977 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

MONTHLY OPERATING REPORT SALEM NO. 1 DOCKET NO. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, and USNRC Regulatory Guide 1.16, 10 copies of the following monthly operating reports for the month of December 1976 are hereby submitted:

Appendix B - Average Daily Unit Power Level Appendix C - Operating Data Report Appendix D - Unit Shutdowns and Power Reductions Sincerely yours, H.

JJ1~

J. fe{1~r Manager - Salem Generating Station CC: Mr. James P. O'Reilly '*ll{;.Copy)

Director of U.S. NRC ~~.

  • Off ice of Inspection and Enforcement ~
  • Region I ~~

631 Park Avenue ~\:l ,

King of Prussia, PA 19406 ,?Y-~~1 --~-

~ "~~rn, Director, Office of Management~~Q6't;\)7* (2 Information and Program Control ) '

U.S. Nuclear Regulatory Commissio ~~

Washington, D.C. 20555 ~

The Energy People 95-2189 (2M) 12-74

e.* I~

APPENDIX D DOCKET NO. 5 o- 272 UNIT SHUTDOWNS AND POWER 'REDUCTIONS UNIT NAl\*fE SALEM NO .1 PATE COMPLETED BY G.S. Daves Jr.

REPORT MONTH DECEMBER TELEPHONE 609-365-7000 Ext. 659 I METHOD OF TYPE SHUTTING DOWN F**, FORCED DURATION THE REAC,TOR OR NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER (2) CORRECTIVE ACTIONS/COMMENTS I - - ------------- - ---., **---------- -*-- --- --------- - - - - - - -- - - - -

~----

  • * *
  • 1*

~

. Salem No. 1 - Undergoing power ascension testing. Unit has not been declared commercial.

I

SUMMARY

, \

(

\.._)

(]*.::::;\:y

_,; U '
  • , .f APPENDIX C OPERATING DATA REPORT DOCKET NO. __5_o_-_2_7_2_ _ _ 0 UNIT _S_A_L_E_M_N_O_._l_ __

.. 1-12-77,

. DATE----------

COMPLETED BY G* S. DAVES TELEPHONE 609-365-7000 X659 I OPERATING STATUS

1. REPORTING PERIOD: December 1976 GROSS HOURS IN REPORTJNG PERIOD: _ _7_4_4_____

TO* Be .

2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3 3 3 8 MAX. DEPEND. CAPACITY (MWe-Nctl: Determined DESIGN ELECTRICAL RATING (MWe-Net): 1090
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Nct): __S_E_E_I_T_E_M--'#'--4______

. 4. REASONS FOR RESTRICTION (IF ANY); 20% of rated' core power until the ECCS Performance is reevaluated by modeling the uooer head temperature as the hot leg temperature. . THIS"MONTH YR TO DATE CUMULATIVE

5. 301.6 Nu MB ER OF H0 URS REACT OR WAS CRITICAL . . . . . ; . * . . * . * .
  • _;___;,_..:._;;,_ 30~.6 301.6

~* 0 0 0

6. REACTORRESERVESHUTDOWNHOURS . . * . * * * * . . * * * * . . * * * - - - - -----
t. HOURS GENERATOR ON LINE . * * . . * * . . * * * * . . * . * * * . * * . * .

4 0. 3 4 0. 3 40.3

8. UNIT RESERVE SHUTDOWN HOURS **********..**.*.**.**. 0 0 0 J~
9. GROSS THERMAL ENERGY GENERATED (MWH) * * . . . . * . . : *...

48697 48697 4869~3

10. GROSS ELECTRICAL ENERGY GENERATED (MWH) . . * . . . . * . . * *
  • 3230 3230 3230
11. NET ELECTRICAL ENERGY GENERATED (MWHl .*********..**

0 0 0

12. REACTOR SERVICE FACTOR * * . * * * * * . . . * * . .,* * * * . . * . * * * * .

N/A N/A N/A

13. REACTOR AVAILABILITY FACTOR ***.******************.. N/A N/A N/A 14.' UNIT SERVICE FACTOR ******* , *.*.***** , *******.******

N/A N/A N/A

15. UNIT AVAILABILITY FACTOR **** , ********.************ N/A N/A N/A Max. Dependable Capability N/A N/A N/A
16. 'UNIT CAf>ACITY FACTOR (Using MDC) .**.******** , *********
17. UNIT CAPACITY FACTOR (Using Design MWc) .****** , ** , ***** **

N/A N/A N/A

18. UNIT FORCED OUTAGE RATE ..*****.***.** , *********** N/A N/A NLA
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): 3-18-77 Modification of low pressure turbine blading, 8 weeks. '
20. IF SHUT DOWN AT'END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 1-7-77
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 9-30-76 12-11-76 INITIAL ELECTRICITY 11-01-76 12-25-76 12-20-76 COMMERCIAL OPERATION 1.16*9

J

'.,[

APPENDIX B AVERAGE DAILY UNIT- POWER LEVEL

.. DOCKET NO . 50-272 UNIT Salem No. 1 DATEl-- 7 7 COMPLETED BY G.S. Daves TELEPHONE 6 og-3 6 5-7 OO q Ext. 659 MONTH DECEMBER DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1

(MWe-Nct) (i\fWe-Nct) l 0 0 1 17 0 0 2 18 3 0 19 0 e 4 5

0 0

20 21 0

0

-(w 6 0 22 0 0 *O 7 23 8 0 24 0 0 0 9 25 10 26 0 11 0 27 0 12 0 28 24 13 0 29 0 14 30 a*

15 0 31 0

16 0

INSTRUCTIONS -')

On this form, list the average duily unit power lcwl in MWc-Ncl for each day in the reporting mouth. Compute to frr{

nearest whole nwgawatt.

111csc figures will be used lo plot a graph for ead1 rrpo1ling month. Note that when maximum dcpl'llll:1bll' L'apadty is used for the m'I elcl~trical rating or the unit, there may be lll'l"asions when the daily average pllwcr k*\*d L'XCci..*ds the l OO'ii* line (or the n~strkled. powL~r k\'el line). In sudi L~;iscs, the avc1:agl~ llaily unit power output shl'L'l slam Id he

~u~notcd to explain lilt.: app:.m:nl arw11_1:_ilY_.._ _ __