ML19030A340

From kanterella
Jump to navigation Jump to search
Submit Monthly Operating Report for the Month of January 1978 for Salem No. 1
ML19030A340
Person / Time
Site: Salem  PSEG icon.png
Issue date: 02/15/1978
From: Heller H
Public Service Electric & Gas Co
To:
NRC/IE, Office of Nuclear Reactor Regulation
References
Download: ML19030A340 (16)


Text

PsftG Public Service Electric and Gas Company Salem Generating Station P. 0. Box #168 Hancocks Bridge, New Jersey 08038 February 15, 1978 Director, Office of Inspection and Enforcement

u. S. Nuclear Regulatory Commission WashingtonF D.C. 20555

Dear Sir:

MONTHLY OPERATING REPORT SALEM NO. l DOCKET NO. 50-272 In compl.iance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, 10 copies of the following monthly operating reports for the month of January, 1978 are being sent to you.

Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Major Plant Modification Surnmary of Safety Related Maintenance Operating Suinmary Sincerely yours,

~1!~

H. J. Heller Manager - Salem Generating Station JMZ:jcm cc: Mr. Boyce H. Grier (1 Copy)

Director of u. s. NRC Off ice of Inspection and Enforcement Region I 631 Park A.venue King of Prussia, PA 19406 Director, Office of Management (2 Copies) ~

Information and Program Control U.S. Nuclear Regulatory Commission Aocl ~

Washington, DC 20555 I\ I (10

~~~J-hr EJ1fl6Y People 8-l-7.R3 95-2189 (2M) 10-76

AVERAGE DAILY UNIT PO,LEVEL .

OOCKET NO. *50-212

. UNIT,* Salem No. 1 DATE . February 15., 1978 COMPLETED. BY J.M. Zupko, Jr.

TELEPHONE 609-365-7000 X507 MONTH January, 1978 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE. DAILY POWER LEVEL

'(MWe-NET) (MWE-NET) 1 1050 17 119 2 1116 18 884

  • 3 1086 .19 1100 .

4 428 20 .. 1089 5 1066 21 1095

/:""'-.,

., 1C,;6*"

1009 22 1073 7 1082 23 410 8 1042 24 0 9 1066 25 0 (---- .........

I j

\

10 941 26 0 23 27 0 11 12 0 28 0 13 0 29 0.

0 30 783 14 0 31. 996 15 16 0

\ *

.,__.,*Pg. 2-16 .

. 8.1-7.Rl.

-1':

e .OPERATING DATA REPoRl'

    • . J:XX:RET N).:.

DA'.l'E :

50-272 .....,..

February is, 1978 CDMPIZrED BY: J.M. Zupko, JR. *

'TEt.EPHONE:609-365-7000 X507 OPERATING STATOS l *. unit Nana:.

  • Salem No. 1 . Notes:
2. Reporting Pericd:_J_an_...uary.....,_......,,,_*.-1~9~7~8~------
3. .Lic:e.nsed ~ PQwer (Kit) : 3338
4. Namapl.a.te Rating (GJ:oss Kiel: * --------------

.1135 Design Electrical Rating met -------.------~-

~): .

. 5.

6.

1090 Max:iJmD Dependable capac:iey (Grt;iSS .!fie) :_._11_2;;.;4;__ _

7. Max:iJmD Dependable i::apilcity (~t !fie) : .__.l....,0...7.-9_ __
8. If Changes Occur in capaciey Ratings (Items Nunter 3 ThrcUgh 7) Since Last Report, Gi'le ~:

one

9. Power Isvel To Which Restricted, If Acy .. (Net me>: __....

N""a""'n""e,_______________________ .

lo. Reascc.s For Bestrict::ions, If* Acy: _No__ n_e________________________,__,___

'!his M:lnth. . Year tO Date CUmulat:i.ve 744 744. 5185 ll. HciJrs In Reporting Period l2. NU!ICer Of Hears P.eact:cr' Was Critical . 496.5 496.5 3039.7 l3. Reaetor ReseJ:Ve ShutCcwn :Eburs Q 0

14. Hours Generator On-Line ~:35.S ~:35.5* 28fifi.l l5. unit Reserve Shutdcwn Hours 0 0 0
16. GJ:oss. 'lllemal Energy Generated(!Hl) 1286153 1286153 7981373
17. GJ:css El.ectr.i.cal Energy Generated (mB) 439000 439000 2625310 lS *. Net.Elect:l:i.cal Energy GeneratedCWli) 415482 415482 2470657 l9. unit .Se...""'iioe Factor 58.5 s0.s. 55.3
20. unit Availahiliey Factor 58.5 58.5 55.3 2l. unit capacity Factor (Osinq MOC Net) 51.8 51.8 . 44.2
22. unit capaci.ey Factor (Osi.nq DER Net) 51.2 51.2 43.7
23. Unit Forced Outage Rate ~l.5 41.,2. .18.9.
24. Shutcicwns Scheduled Qver* Next 6 M:::nths (Type, Date, am! Duration of Each) :

None

25. If Shut 0::7.ln At End of Report Period! .Estimated Date of Startup:* _ _ _ _N_/_A ______________
26. *Units In Test *Status (Prior to camercia.l Operation):

Forecast 'Achieved INITIAL CRI'l'ICALI'l" 9/30/76 12/11/76 INI'nAL~ 11/1/76 12/25/76 8-1-7.112 Pq. 3-il6 ~ Ol'ERM'ION 12/20/76 6/30/77

UNIT s11lmXJ'iNs J\ND JUomR REDUCTIONS DOCKET NO.: 50-272

~~~~~~~~~

REPORT IDNrH

  • January, 1978 UNIT :NAME: . Salem Unit #1 DATE: February 15, !978 COMPLETED BY: J~M. Zupko, Jr.

.TELEPHONE: 609-365-7000 X507-MimDD OF.

OORATION SHUITING LICENSE *sYsTJ:M a::<<I'mENr CAUSE AND OORREX:TIVE

00. DATE TYPE! (HOURS) RFJ\SON2 r.xMN EVEN!' cooE4. CXJDES ACTION 'ID
  • . REl\C'lUR ' REPORT I PREVfNI' REOJRREN::E 78-1 '

1-4-78 F 4.1 A 3 ------ HF Filter IDss of llB, 12A, 13A, ],3B CirculatorE due to high screen t::.P.

i i

78-2 1-5-78 I I F 0 A* 4 (A) ------ HH Filter Clean_ll, 12 Condensate Purrp Suction

Strainers.

78-3 1-7-78 s 0 A .4 (A) ----- HH Filter Clean 11, 12, 13 Condensate Purrp Suction Strainers.

78-4 1-8-78 .* F 0 A 4 (A) ------ HF Filter IDss of 13A, 13B Circulators due to

  • high screen liP.

78-5 1-9-78 F 0 A 4 (A) ----- HF Filter Frozen travel~g screens.

78-6 1-10-78 F 0 A 4 (A) ------ HF Filter Frozen traveling screens.

I 78-7 1-11-78 F *12.2 A 2 ----* HF Filter Freezing conditions and lCM tide Cimsed lCM suction conditions on circulators. Operator manually*

tripped turbine.

  • 1 2 3 4 5 F: Forced Reason: >>athod:. Exhibit G - Instructions Exhibit 1-Sane s: Scheduled A-Equi(m3.flt Failure (Explain)  !-Manual for Preparation of Data Source a-Maintenance. o.r Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Antanatic Scram. Event Report (µ:R) File D-Regulatory Restriction 4-0ther (Explain) (NUREG-0161)

E-Operator Training & License Examination F-1\dministrative NOI'ES:

8-1-7 .R2 G-<:perational Error(Explain) A. I.Dad Reduction H-Other (Explain)

.Pg. 4 16 B. Continuation of previous outage *

.. - - -* ------------------------------~

- UNIT smni:a-ms AND PCMER REOOCTIOOS 50-272 DOCKET. NO.: _ _ _ _ _ __

  • ) ..

REl'ORT IDNI'll January 1 1978 UNIT *NJ\ME: Salem Unit No .1 DATE: February 15, 19-=78

.j COMPLETED BY: J.M. Zupko, Jr.

TELEPHONE: 609-365-7000 X507 MErtJJD '. -

OF OORATIOO *. 2 Slll11TING LIC>>lSE SYSTEM CXMPmENl' CAUSE AND CDRREx:I'IVE NO. DATE TYPE1 (IWRS) RFJ\SON IXMN. - EVEN!' CDDE4 CooE5 ACTION ID .

RFJ\CIDR REPORT I PRIMM'~

78-8 1-11-78 F 66.0. A 4(B) ----- SF Valvex 11SJ56 .bonnet le~g.

78-9 1-14-78* F 38.6 A 4 (B) ----- SF Valvex 11SJ54 valve_ operator failure.

78-10 l.;...15,;,_79 F 15.4 .A 4(B) ------ HA Motone Main Turbine Turning Gear_rvbtor winding burned out.

78-11 1-16-78 F 8.1 A 4(B) ----- HF Filter Spurious losses of circulators.

78-12 1-17-78 . F- 0 A 4 (A) *----- HF Filter IDss of llB, 13B Circulators due to high screen*@.

78-13 1-17-78 F 6.4 A 3 ------ HH Valvex Feedwater flow transients due to a fault~ feedwater heater bypass valve.

78-14 i-18-78 F 0 A 4 (A)* ----- HH Filter Clean 11, 12, 13 Condensate Pump suction strainers~

78-15 1-18-:78 F 0 A *4 (A) ------ HH Filter Clean #13 Heater Drain Pump suction strainer.

\

78-17 1-23-78 F 114.8 A. 3 ------ HA Instru Electrical Fault in Electro-HydraUlic Control System causing false turbine overspeed protective action.

78-18 1-28-78 F 42.9 A 4(B) ------ HF Filter Circulating Water Trash Rack Ice

Accunmulation.

8-l-7.R2 Page 5* of. 16.

UNIT SHU'IDOONSAND PCMER IU!IU:TIONS DOCKET NO.: 50-272 UNIT *NAME: -Sa_l__em

__U_m_,,-t-."'""#-= REPORT MJNtH January, 1978

. DATE:. February 15 I i978 .

COMPLETED BY: J'~M. Zupko, Jr~.

TELEPHONE: 609-365-7000 X507 MimlJO

.. OF mRATION SIR11TIOO LICDISE sYsTEM cntPrnF.Nl' CAUSE AND CX>RROCTIVE oo. DATE TYPE! (IDJRS) ruW3oN2 COIN EVEN!' CXJDE4 CXJDES ACTION 'ID RFJIC'IDR REPORI' I PREVENI' REX:URRENCE 78-19 1-30:-78 F 0 A 4 (A) ----- HF Filter Frozen traveling screens.

78-20 1-30-78. F 0 A 4 (A)* ----- HH Filter Clean 11, 12, 13 Condensate Punp Suction.Strainers

  • 8-1-7 R2.

Page 6 of 16

DOCKET NO. : 50-272

~~--.~__,__,__,__,.__,.

MAJOR PLANT M't!JFICATIONS

  • UNIT NAME: : . Salem Unit #1 RE.PORT MONTH Januru:y, 1978 February 15, 1978 DATE:

COMPLETED

  • BY: J. M. Zupko, Jr.

TELEPHONE: 609-365-7000 X507

  • DCR NO. PRINCIPLE SYSTEM SUBJECT ED-0042, Service Water Modify intake enclosure to prevent travel:ing screen freeze-up.

ED-0211 SWitchgearVentilation* Relocate pressure taps.

ED-0093 115VAC Inverters Install blown fuse indicators.

DOCKET NO.: 50-272

SUMMARY

OF SAFETY -LATED MAINTENANCE -NIT NAME: Salem Unit #1

. . DATE: February 15' I 1978

-

  • DEPARTMENT MAINTENANCE.

REPORT MONTH January, 1978 -.-COMPLETED BY: J. M. Zupko,_ Jr.

TELEPHONE: 609-365-7000 X507 WORK ORDER EQUIPMENT FAILURE DESCRJ;PTION. CORRECTIVE ACTION NO.

RE-124 In Core.Flux Check Clutch Tension Map System. on "F" Drive Unit. Adjusted-clutch. -*

PD-4330 Control Room -Danpers Bind Oiled and adjusted d.anpers *.

Ventilation.

PD-4340 #11 B.A. Trans *.

Purrp Heat-tapes shorted. Repaired damaged heat tape.

OD-5260 Valve 11RH29 _ Packing leak. -Repacked.

OD-6760 Vital Heat Panels lHTGAl and 1HTGA2 Tracing~ . alanning. Replaeed.therrrostats. -...

OD-6826 Valve 13RC22 Packing leak. Repacked valve.

OD-6828* 11 R.C. Pump . Packing leak-retum loop Tighten valve packing.

  • OD-6832 Valve 11SJS6 Repack and repair. Seal welded bonnet seal.

. OD-6843 Valve 1CC136 Failed closure tine check

  • Adjusted stroke.

OD-6867 #12 SW Purrp Shear Pin.broken. Replaced Shear Pin.

Strainer.

OD-6868 #14 SW Purrp Shear.Pin broken. Replaced Shear Pin.

Strainer.

OD-6880 #14 SW Purrp Shear Pin broken. Replaced Shear Pin.

Strainer.

OD-7345 Valve'llSJ56 Valve cover* leaking. Replaced gasket.

OD-7790 Valve 1SJ68 Packing leak. Tightened packing.

Page8 of 16 - '

8-1-7.Rl

DOCKET NO.: ____,s~o~--2~72..________~--~

.NIT NAME: ___ Sal

__em

__Uni

__._t__

  1. l________~

SU~Y*OF SAFETY ~ATED MAINTENANCE.

.. *DEPARTMENT WUNTENANCE DATE: February 15, 1978 COMP LE 'i'ED BY:

J.M. Zupko, Jr.

REPORT MONTH January,

  • 1978 TELEPHONE.:

609~365-7000 X507 WORK ORDER EQUIPMENT FAILURE . DESCRIPTION . CORRECTIVE ACTION

.'* NO

  • OD-7845 125 voc Grotind on *system. Ground in R.M.S~ cabinet.

renoved.

OD-7853 #12 COnponent

' Cooling Pump. . Vent line .leaking. Rethreaded and reinstalled vent line.

' OD-7872 .#12 SW Pump Strainer packing leaking * . Repacked strainer.

Pump - Strainer.

OD-7882 Valve 12RH29 Motor trips- on -overload. .

  • Replaced*valve operator. _ ..

OD-7889 #14 SW Pump Transfo:rner burnt.* Replaced burnt *transfonrer. _

Pump backwash~ _ .and.solenoid valve.

OD-7902 Valve 12SJ20 Packing *leak. *

  • Tightened* packing.

OD-7909 15 s.w. Pump Repack punp. Repacked pump~

oi:>-7929 #12, 14, 16 Shear Pin broken. Replaced shear pin~

S. W.Purno *.strainers

  • OD-7938 Valve 12SW17 Will not open from oontrol Adjusted torque sWitch.

console.

OD-7943 12 s.w. Purrp Runs ooritinuous in auto. Recalibrate inst;runentation.

Strainer.

OD-7977 Aux. Bldg. Replace 11 & 12 Exhaust Ventilation Fan Roughing Filters. Replaced filters *. * "

OD-7989 #13-service Hand hole cover leaking Replaced gasket.

Water Strainer.

OD-8011 #14 s.w. Punp Shear Pin broken. Replaced shear pin~

Pump.Strainer.

'*~

  • Page
  • 9 of 16 8-1-7. Rl

DOCKET NO * : 50-,272

SUMMARY

. OF SAFETY -LATED MAINTENANCE r --~-------...--..--------

IT. NAME: _ __..S,_a=lern=-'U=Ill=*=t_#,;;..;l;;;___ _ __

. DATE :

  • Februai:y 151 .1978
  • DEPARTMENT.* MAINTENANCE
  • coMP LETED BY:

J.M. Zupko, Jr.

REPORT MONTH January, 1978 ----------------------

TELEPHONE: . 609-365-7000. X507 WORK ORDER EQUIPMENT FAILURE DESCRIPTION

  • CORRECTIVE . ACTION NO.

OD-8027 lA-:-125 VDC Bus Voltage is higher Bus. than normal. Adjusted voltage.

OD-8034 Elev. 130' Interior door has. a air lock. cracked upper roller. Replaced bearing.

OD-8043

OD-8044. Valve 13RC16 Packing leak *.

  • Repacked valve.

.MD-2078 Valve 11CA681 Renove and test, reinstall'.* Perfonred as directed.*

.MD-2406. #1 Errerg *

.*. Control Air .Camp. OVerllaul Corrpressor. Overhauled carrpressor *.

MD-2419 Valve*l2MS130 Packing gland leak *. Repacked: valve.

.MD-2437 #16 s.w.

Purrp Backwash. Disassenble and repair. Changed.or{fice plate.

.MD-2441 Valve 11SW24 Diaphragm ruptured *.. .Replace diaphragm.

MD-2447 Valve llCVl.55 Diaphragm ruptured. Replaced *diaphragm.

.MD-2471 Valve 16SW24 Diaphragm ruptured. Replaced diaphragm.

.MD-2472 Valve 1CV56 Packing.leaking

  • Repacked valve.

OP-159 'Main. Stin. Supports Hanger supports.* not Reset.main steam supports.

loaded properly. * *

.Page 10 . of 16

DOCKET NO.: 50-272

SUMMARY

OF SAFETY ~TED MAINTENANCE .NIT. NAME:

  • Salem Unit #1 DA~E: February 15, 1978
  • DEPARTMENT PERFORMANCE REPORT MONTH January, 1978 COMPLETED BY: *J.M. Zupko, Jr.

TELEPHONE: *

  • 609-365-7000 X507 WORK ORDER. EQUIPMENT FAILURE DESCRIPTION CORRECTIVE ACTION , '

NO.

PD-4324 Service Water Timers not operating.* Replace .limit switch on 11SW49

  • Bypass.Valve Timers.

PD-4359 Valve 12MS18 Valve leaking at :the diaphragm bolts. Replaced* diaphragm.

PD-4428 Protection System Erroneous indication. Replaced shorted diode. .

status panel.

OD-7689 Service Water* /:y,P inStrurcent has Installed. new bourdon tube*

PA-8707-Z. *tubing bloWn off~ ..

OD-7780 13 A.F.W. Pump No indication of Strn.

  • Press. in the Control Replaced*force.notoiin Room. pressure transmitter.

OD-7923 Valve 13SW58 Will not close in tine Reworked limit switch.

aliCMed *.

OD-7996 N-43 Power Fange Instrurcent spiking. Cleaned potentioneter.

OD-8004 Service Water

  1. 11 Screen. Runs continuously. Blew down bubbler tubes.

PD-4336 Heat .Trace. Heat trace thenrostats and Replaced and calibrated thenrooouples '."'" 701P, thernostats and thernooouples.

701$, 702P, 702S heat damaged.

PD-4363 . Safety Injection *

  • Level indication Heated*lines and calibrated
  • RWST level.* ind *. frozen.

PD-4365 RMS 1Rl6 I.oss of indication. * ~laced G.M. tur.e and c ibrated.

  • R.C.S.

PD-4388 CH'."'"l Press. Indication High. Replaced signal isolator~

Indicator.

  • Page 11 of 16 R--1 -7 _J:U__

DOCKET NO * : 50-272

.NIT NAME: ____s_ai_em ___u_ni_*~t_#_l_________

SU?1MARY *OF SAFETY *~TED MAINTENANCE .

. * . DATE : February 15, 1978 *

  • DEPARTMENT . PERFDRMANCE COMP LETED BY: -----------------------

J.M. Zupko, Jr.

REPORT MONTH January, 1978

  • . TELEPHONE: -----------------------

609-365-7000 .X507 WORK ORDER .* EQUIPMENT . *FAILURE DESCRIPTION CORRECTIVE ACTION NO.

PD-4391 Safety Injection Erroneous readings. Vented level transmitter.

  1. 11* Accum. level* '

OD-7731 *eves Flow indicator reading low. Reset square root extractor.

OD-7927 Valve & l.PR2 Stroke tine too long. Replaced solenoid valve and tightened diaphragm bolts.

OD-7937 .Valve 1CV79

  • No open indication. Adjusted limit ~itch.

PD-4355 6.T Protection Setpoint dropped. *Replaced two capacitors, I.cop 13. and calibrated.

  • RE-117 Excore Detector Reading incorredtly.
  • Recalibrated recorders.

Voltage Recorder.

OD-7540 13 and 14 Steam .Channel 2 reads higher Recalibrated recorders

  • Flow and Feed than others. *.

Flow Recorders.

OD-7852 Vital Heat Trace-Recorder *Bank advance malfunction. .Replace two transistors and repaired broken wire.

PD-4340 Valve 14AF21 Demand indication reads Resoldered loose wire.

zero.

PD-4343 14 Steam Flow, Functional test out of .

CH-II. FT-543 spec. .,

Recalibrated loop.

  • OD-6812 Stack Flow FA8605 reading 100, 000- . Ice in feed lines *.

cfm. (steady reading) '

OD-6820 RWST level B *Reads Lower th.an Recalibrated Transmitter level D. *I OD-6825 eves Valves 1CV185, lCV-181 Replaced* controller* for ..*

lCV-179, do not open on valve lCVl 79 *.

at1+:omatic.

R-l-7_'R1 Pac fe 1? Of J.b

DOCKET N0.:_~...,;_~5~0-~2~7~2~~~~~

.NIT NAME: _ _s_al_em __u_m_*t__,#_l_ _ __

.A Li.

SUMMARY

OF SAFETY ~TED MAINTENANCE

. ~ DEPARTMENT PERFORMANCE . DATE: _ _F_eb_ruazy ___~_l_5_,_1_97_8_ __

. REPORT MONTH*. January, 1978 COMPLETED BY: _ _J_.M_._z_up~~-o~,_J_r_._ _~

TELEPHONE : _ __;:6;.;::.0.=. 9--=3;.:6:.:;5_-.70:.::0;..:0;....:.:XS:;;,.0::.,:7:...._--

WORK ORDER EQUIPMENT FAILURE DESCRIPTI.ON CORRECTIVE ACTION NO. ..

OD-6875 N-43 IDwer Erroneous reading. Replaced signal isolator.

Page 13 of 16

  • 8-1-7.Rl
  • ~*

.. OPERATING SU~Y*

SALEM UNIT #1

.January,* 1978. *.

i-1 *With the plant operating at -88% of. capacity, .the heater drain pumps were cycled as. pa'rt of .a program to clean the Feed . and ...

Condensate System.. Power was t;:hen reduced to *.70% *to cleari all condensate pump suction strainers.

At 0825 unit output *was returned to full load of 1140 Mwe gross. The unit operated at full load until 1-4.

1-4 With the unit at full power, .Circulating-Water System problems forced a load reduction to 50% power. Several minutes after the load reduction, #12 Steam Generator Feed* Pump tripped; followed by -a trip of #11 Steam Generator Feed.* Pump. A Reactor Turbine Trip occurred from_50% power caused by low condenser*

vacuum.

At 0350 the reactor was taken critical and the unit was syn-chronized at 0625.

1-5 At 0449 the unit output was.returned *to full load.

At 2128 load was reduced to 70% to clean *condensate pump strainers.

1-6 At 1210.unit output was returned to full load.

1-7 At 2145 load was.reduceq to cycle heater drain PumPS and clean condensate pump suction strainers.

  • 1-8 .At 0827 unit output was returned to full load .

.1-9 .The unit remained at full load esse~tially all.day". except for

.a short period at 70% due to circulating water problems.

Page 14 of.16

1-11 *At 0146 the* turbine. was manually tripped from 30% power.due to problems with the Circulating Water System.

repair anon-isolable valve in the Safety Injection.System.

The.outage lasted*until 1-16.

1-16 The reactor was*taken critical at 0828 and the unit was synchronized at 2206.

? 1-17 At 0713 the unit tripped from 150 MWe gross due to high-high level in #13 *Steam Generator...

  • This stemmed from frozen feeler lines on a feedwater heater drainage valve that operated .a

.bypass valve which caused.an unstable feedwater condition. *The operator attempted to manually control_feedwater to avoid a low.;..low level.. trip. The transient led to a .high-high level trip.

The reactor was taken critical at 0852 and the unit was synchronized at 1331.

1-18. At 0630the unit-output was returned to full load:

At 1145 the. load was reduced to 70% to clean condensate pump suction strainers and was* returned to full load at 2200. *The unit remained at full power until 1-23.

1-23 At 0915 a Reactor Turbine Trip occurred caused by a malfunction of the E-H Control System.

At 1330 A Reactor Coolant System cooldown*was started to repair leaking #12 and #13.Steam Generatoz;, steam* side *manways.

At 1759 a Safety*Injection occurred during cooldown at-about 200,psigsteam generator pressure on.a high *differential pres-sure between steam generators. (Ref.* L.E.R. No. 78-04)

The outage lasted till .1-29.

Page 15 of 16

.,__,., * ~. ~, d ***

' j.;;:2 8 e The reactor. was taken critical at *0530. *

  • 1-29 The unit was synch,ronized at 2256. :A delay in synchronizing the: generator-was due.to' losi bf bondenser circul~~ing ~ater caused by*.* ici.rig. ove"r. of. t:he, trash racks *

.1-30 . At 1610 the unit output was returned to_ full. lqad *.

At 2203

. .a load. reduction to :70% was started to clean *

  • condensate pump.strainers.

1-31* At.0928 .the unit .output was returned to full load.

Page 16 of 16