Submit Monthly Operating Report for the Month of December 1976 for Salem No. 1
ML19030A368
Person / Time
Site: Salem  PSEG icon.png
Issue date: 01/28/1977
From: Heller H
Public Service Electric & Gas Co
To: O'Reilly J
NRC/IE, Office of Nuclear Reactor Regulation
References
Download: ML19030A368 (3)


Text

Public Service Electric and Gas Company Salem Nuclear Generating Station P.O. Box #168 Hancocks Bridge, New Jersey 08038

  • January

~iegulatory Docket File To the General Manager - Electric Production MONTHLY OPERATING REPORT SALEM GENERATING STATION.

In compliance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, the following monthly operating reports for the month of December 1976, are sent to you for sub-mittal to the Nuclear Regulatory Commission:

Appendix C - Operating Data Report Appendix D - Unit Shutdowns and Power Reductions The completed forms should be submitted as follows:

Primary Recipient l'. Director, Office of Inspection and Enforcement, US Nuclear Regulatory Commission, Washington, D.c. 20555 (10 Copies)

Secondary Addressees

1. Mr. James P. O'Reilly (1 _Copy)

Director of US NRC Off ice of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, PA 19406

2. *Director, Office of Management Information (.2 Copies) and Program Control US Nuclear Regulatory Commission Washington, D.C. 20555 GJ/j;~' v H. J. Heller Manager - Salem Generating Station 1130 Pg.1-4 CORRECTED COPY9s,21s9 csMJ io-12 0_1_'7 "01

OPERATING DATA REPORT *

)

a- *

  • 4
    • m *..--...*_s_o_-_2_1_2_ _ _ __

UNIT DATE Salem No. 1 1-28-77

. l CCMPLEl'ED BY .J. M. Zµpko Jr.

OPERATING 5rA'IUS TELEPIDNE

  • 609-365-7000 X507.
1. REPORl'rnG PEUOD:necember 1976 GROSS HOURS IN REPORTING PERIOD: 154. 3
  • TQ Be
2. CURRENI'LY AUThlJRIZED POWER LEVEL (}Mt) :3338 MAX.DEPEND.CAPACITY(MWe-NErJ :Petennined DESIGN ELECl'RICAL RATING(MW'e-Net): 1090 .
3. ro1lER. LEVEL TO WHICli RESTRICTED (IF .ANY) (MWe-Net): SEE ITEM #4
4. REASONS FOR RESI'RICI'ION (IF ANY): .20% of rated core power 1.llltil the ECCS Performance is reevaluated by modeling the upper head temperature as the .

hot leg temperature.

  • Gross hours taken from initial electric generated.

THIS J.ni"IH YR TO DATE S. Nmt!BER. OF aJURS REACTOR WAS CRITICAL *

6. REACIOR RESERVE SHirn:OWN HOURS * * * *

~. *HOURS GENERATOR ON LINE * * *

9. GROSS THERM.AL ENERGY GENERATED~. * * * . 48697
10. G?JJSS ELECTRICAL ENERGY' GENERATED(.M'lH) *** _3_2_30_ _

11.

12.

NET ELECTRICAL ENERGY GENEP.ATED(Ml'iH) ** * *

  • REACTOR SERVICE FACTOR. * * * * * * * * * *

0 N/A

13. REACTOR AVAILABILITY' FACTOR * * * * * * * .*

N/A

/_A__

14. tlNIT SERVICE FACTOR * * * * * * * * * * *
  • _N....

lS. tlNIT AVAII.ABILITl FACTOR * * * * . . ** . *

16. UNIT CAPACITY' F.ACl'OR(Using MDC). * * * * * *_N....f_A__
17. UNIT OOACm FACI'OR(Using Design MWe) * *
  • N/A
18. UNIT FORCED curAGE RATE * * * * * * * * *
  • N/A

.19. SHIITOOWNS SCHEDULED OVER NEcr 6 MJNIHS(TYPE,DATE,.AND DURATJ;ON OF EAOl): 3-18-77, Modification. of low pressure turbine blading, 8 weeks.

20. . IF smrr OOl'iN AT END OF REPORI' PERIOD' ESTIMATED DATE OF sr.ARTOP: 1- 7:. 77
21. UNITS IN TEST STATUS (PRIOR TO COf.iERCLfU. OPERATION) : FORECASr

*_ACHIEVED INITIAL CRITICALIT! 9-30-76 12-11-76 INIT!.AL ELECTRICITY 11-01:--76 12-25-76 i

~Pg~ 3-4 CO~CIAL OPERATION 12-20-76 8-1-7.Rl


~__: _____ ;_~-: ..

CORRECTED .COPY

APPENDIX D * *DOCKET NO. 50-272 .

UNIT smITOOWNS AND POWER REDUCTIONS UNIT NJ\tim Salem No. 1 DATE 1-28-77 COMPLID'ED BY J. M. Zupko Jr.

TELEPHONE 609-365-7000 Ext. 507 REPORT f\{)NfH DECEMBER 1976 METHOD OF TYPE SHUITING. OOWN F:. FORCED DURATION THE REACTOR OR NO. DATE S: SCHEDULED (HOURS) . REASON REDUCING POWER CORRECTIVE ACTIONS/COMMENTS 76-1 761225 F . 33. 7 G 3 Feedwater Flow in Manual -

12 Steam Generator Low, Low Level

- Trip.

76-2 761227 F 7.4 H 3 11 Steam Generator Feed Pump Trip on Low Suction Pressure

- 13 Steam Generator Low, Low Level Trip.

76-3 761227 F 11.6 H 3

- 11 Steam Generator High Level

e. 76-4. 761229 F 61.3 A 3 Trip.

12 Steam Generator Feedwater Regulating Valve - 12 Steam Generator High Level Trip.

      • ~Y: *, "

CORRECTED COPY Pg. 4-4 .

R_l-7_1?1 *