PS~G e Public Service Electric and Gas Company 80 Park Place Newark, N.J. 0.7101 Phone 201/622-7000 September 14, 1976 Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. c.

20555

Dear Sir,

MONTHLY OPERATING REPORT SALEM NO. 1 DOCKET NO. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, and USNRC Regulatory Guide 1.16, 10 copies of the following monthly operating reports for the month of August 1976 are hereby submitted:

Appendix B - Average Daily Unit Power Level Appendix C - Operating Data Report Appendix D - Unit Shutdowns and Power Reductions The Energy People Sincerely yours,

')~

F. P. Librizz~

General Manager -

Electric Production RE&UU\\10.RY DOCKET f~lt COPY 9613 95-2001 300M 8*75

..... Ii

  • .~_.... :.___'. ___ ------------* -- _..-:..... ------*---****-*-'-* ------***_,._.:......_ __ -:-*-*- **-*-.. --~----*. ---*..

,r...~_/t; APPENDIX B AVERAGE DAILY UNIT-POWER LEVEL DOCKET NO. 50-272 Salem No. 1 UNIT DATE 9/_7/_76.

COMPLETED BY J.M.Zupko,Jr.

TELEPHONE 609-.365-700p Ext~ 507 MONTH AUGUST 1976 DAY AVERAGE DAILY POY/ERLEVEL DAY AVERAGE DAILY PO\\VER LEVEL

(.M\\Ve-Nct)

(MWe-Nct) 1 NLA -

See Belo:'d*

17 NLA 2

N/A 18 NA 3

NLA 19 NLA 4

N/A 20 NLA i

NLA N/A 5

21 6

Nl_A 22 NA 7

N/A 23 N/A 8

N/A 24 N/A 9

N/A 25 N/A 10 Nl_A 26 N/A 11 27 NLA 12 N/A 28 N/A 13 N/A 29 Nf_A 14 N/A 30 N/A 15 N/_A 31 N/_A 16 N/A

  • Salem No. 1 Unit limited to 1% of core thermal power by operating license No. DPR-70.

INSTRUCTIONS On this form, list the average daily u11it power level in ~1\\\\'c-Nrt for each da)' in the repurting mo11th. C'ompule to tlie-nearcst whole 11wgawat t.

These fit~llfcs will be used to plot a ~raph for r:1cl1rrpo1ti11g11wnth. Nute lhal whl'll 111:1xi11111111 dcpl'11d:1hk l';1pal'ity is used for the nt*I ckt*trk:d rating lll' the unit, there 111:1)' lw 1wc:1siu11s when the daily avcr;q~c pl>\\n:r kwl _t'Xt't*cds the 100'};, line (or the rcstrii:tcd. pmwr lc\\'cl line). 111 such t~:iscs. tlie awr:igt* daily unit pnwcr output ~ht't't ~huiild lw foutnotcd lo r:q1lai11 lilt* :qip;_Hl'lll :111rn11a!y.

l.J(,.g

  • LJ.-....

APPENDIX C OPERATING DATA REPORT DOCKET NO. -~~5_0_-_2......:7_2_* ~

\\

UNIT ___

s_a_l_e_m_N_o_. _l __

DATE -~9~/_7~/_7_6~--~

COMPLETED BY ___

J_._M_.-=Z=-u.:.:.p~k-=o_.:,_:J_:r::....;;__.

TELEPHONE __

6_0_9_-_3_6_5_-......:7......:0_0_0_

Ext. 507 OPERATING STATUS

1. R EPO RTI NG PER IO D: _Ao..::.o:U;...;:,Go:..:Uo:..:S:::..T=-...:::1:..:9:....7,_6><----

GROSS HOURS IN REPORTJNG PERIOD:_~7_4_4~,,.-=---

.to be

2. CURRENTLY AUTHORIZED POl-\\'ER LEVEL (MWt):
33. 38 MAX. DEPEND. CAPACITY (rY.We-Nct): determined DESIGNELECTRICALRATING(MWe-Net):

1090 I

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): _....:.S:::..e=e'---=i:;..;t:::..e::::.m:.!!.-...:4~b:::..e=l~o'-"w'-----
4. REASONS FOR RESTRICTION (IF ANY):

Operating license restriction to 1%

THIS MONTH of core thermal power.

5. NUMBER OF !lOURS REACTOR WAS CRITICAL.*************. __

N,,_/_A_

G. REACTOR RESERVE SHUTDOWN HOURS ******************* __

N_./'-A __

7'. HOURS GENERATOR ON LINE.*****************.*.**... __

N_./'-A'-'--

8. UNIT RESERVE SHUTDOWN HOURS *****.***************. __

N,_/_A_

9. GROSS THERMAL ENERGY GENERATED (MWH) ***..*******.* _ _..;;;N""'/;....;A;;.;o__
10. GROSS ELECTRICAL ENERGY GENERATED (MWHJ....***.***.. _ __::N_,_./c..:A=--
11. NET ELECTRICAL ENERGY GENERATED (MWHJ.*******.*..** _

__::_:.N,,_/.::.::A;__

. 12. REACTOR SERVICE FACTOR.***********..*.***...*.***** _

__::_:.N,,_/.::.::A'--

13. REACTOR AVAILABILITY FACTOR **..**********
  • ~ **..*.*.* ---=N:.J.../..:..A,,__
14. UNIT SERVICE FACTOR *********.*******, **, ****..***** _

_.:...;N,,_/.::.::A:-..

15. UNIT AVAILABILITY FACTOR.***, **.*********, ******** __

N,,_/_A_

16. 'UNIT CAPACITY FACTOR (Using MDC).******************** __

N_!._/_A_

17. UNIT CAPACITY FACTOR (Using Design MWe) ***************** _

__,_,N..L../~A~

18. UNIT FORCED OUTAGE RATE *************, **********,
  • _

__.;:;..;N_,_/""'A'--

YRTO DATE N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
20. IF SHUT DOWN AT'END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ______
21. UNITS IN TEST STATUS (PRIOR TO COMMrnCIAL OPERATION):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION*

l.J 6-9 FORECAST ACHIEVED 9/30/76 __

11/01/76. __ ~

12/20/76 ----

CUMULATIVE N/A I'J/A N/A N~/A~;

_/

N/A N/A N/A N/A NIA N/A N/A N/A N/A N/A

i.

I TYPE F: FORCED NO.

DATE S: SCHEDULED

~

  • 1 I,.\\
  • ~

Sl}MMARY:

APPENDIX D DOCKET NO.

50-272 UNIT SHUTDOWNS AND POWER.REDUCTIONS UNIT NAME Salem No. 1 I)ATE 9/7/76 DURATION (HOURS)

REPORT MONTH _A_U_G_u_s_T_1_9_7_6_"_

<;:OMPLETED BY TELEPHONE J.M.Zupko,Jr.

609-365-7000 I Ext. 507 REASON (1)

METHOD OF SHUTTING DOWN THE REACTOR OR REDUCING POWER (2)

)

\\__,

(1)

(2)

CORRECTIVE ACTIONS/COMMENTS REASON A: EQUIPi\\lENT FAILURE (EXPLAIN)

B: MAINT. OR TEST C: REl'UELING D: REGULATORY RESTRICTION E: OPERATOR.TRAINING AND LICENSE EXJ\\rnNATION f": AD;\\!INISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)

II: OTHER (EXPLAIN).

METHOD 1: MANUAL 2: MANUAL SCRAM.

3: AUTOMATIC SCRAM 4: OTHER (EXPLAIN)

Information for this report not applicable -

Salem No. 1 initial startup testing.

. l k