Similar Documents at Salem |
---|
Category:Letter
MONTHYEARIR 05000272/20240032024-10-30030 October 2024 Integrated Inspection Report 05000272/2024003 and 05000311/2024003 ML24296B1932024-10-23023 October 2024 Project Manager Assignment LR-N24-0068, Core Operating Limits Report - Cycle 282024-10-21021 October 2024 Core Operating Limits Report - Cycle 28 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) ML24267A1082024-09-23023 September 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report IR 05000272/20240052024-08-29029 August 2024 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2024005 and 05000311/2024005) IR 05000272/20240022024-07-30030 July 2024 Integrated Inspection Report 05000272/2024002 and 05000311/2024002 LR-N24-0012, Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding2024-07-24024 July 2024 Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding ML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24099A1572024-05-29029 May 2024 Issuance of Amendment Nos. 348 and 330 Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response IR 05000272/20240102024-05-16016 May 2024 Fire Protection Team Inspection Report 05000272/2024010 and 05000311/2024010 05000272/LER-2024-001, Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger2024-05-0909 May 2024 Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger IR 05000272/20240012024-05-0707 May 2024 Integrated Inspection Report 05000272/2024001 and 05000311/2024001 LR-N24-0039, Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage2024-05-0606 May 2024 Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal LR-N24-0021, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 ML24071A2132024-03-12012 March 2024 Senior Reactor and Reactor Operator Initial License Examinations LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report LR-N24-0022, Spent Fuel Cask Registration2024-02-29029 February 2024 Spent Fuel Cask Registration IR 05000272/20230062024-02-28028 February 2024 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023006 and 05000311/2023006 IR 05000272/20244012024-02-26026 February 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) LR-N24-0009, In-Service Inspection Activities2024-02-0505 February 2024 In-Service Inspection Activities IR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24250A0582023-11-14014 November 2023 PSEG to Marine Mammal Stranding Center, Salem Sea Turtle Stranding Response Services IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 LR-N23-0072, Core Operating Limits Report – Cycle 302023-11-0101 November 2023 Core Operating Limits Report – Cycle 30 IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20234022023-10-12012 October 2023 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0045, And Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 And Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) ML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23192A8212023-08-14014 August 2023 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location 2024-09-23
[Table view] Category:Operating Report
MONTHYEARLR-N23-0016, And Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 And Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N21-0055, Corrected Report of Changes, Tests, and Experiments2021-07-20020 July 2021 Corrected Report of Changes, Tests, and Experiments LR-N18-0136, Report of 10 CFR 72.48 Changes, Tests, and Experiments2018-12-0505 December 2018 Report of 10 CFR 72.48 Changes, Tests, and Experiments LR-N06-0046, PSEG Metrics for Improving Work Environment, Salem and Hope Creek, Quarterly Report2006-01-31031 January 2006 PSEG Metrics for Improving Work Environment, Salem and Hope Creek, Quarterly Report LR-N05-0196, Report of Changes, Tests and Experiments2005-03-31031 March 2005 Report of Changes, Tests and Experiments ML0402908812004-01-22022 January 2004 New Jersey Pollutant Discharge Elimination System Discharge Monitoring Reports Salem Generating Station Permit No. NJ0005622 LR-N04-0013, December 2003 Monthly Operating Report Salem Generating Station Unit 22004-01-15015 January 2004 December 2003 Monthly Operating Report Salem Generating Station Unit 2 ML19031A3521978-10-10010 October 1978 Submit Operating Report for Month of September 1978 ML19030A3241978-09-12012 September 1978 Submit Monthly Operating Report for the Month of August 1978 for Salem No. 1 ML19030A3261978-08-10010 August 1978 Submit Monthly Operating Report for the Month of July 1978 for Salem No. 1 ML19030A3291978-07-12012 July 1978 Submit Monthly Operating Report for the Month of June 1978 for Salem No. 1 ML19030A3281978-07-10010 July 1978 Attached Monthly Operating Report of Industrial Waste Treatment Plant for the Month of June 1978 ML19030A3311978-06-0909 June 1978 Submit Monthly Operating Report for the Month of May 1978 for Salem No. 1 ML19030A3321978-06-0909 June 1978 Submit Monthly Operating Report for the Month of May 1978 for Salem No. 1 ML19030A3341978-05-10010 May 1978 Submit Monthly Operating Report for the Month of April 1978 for Salem No. 1 ML19030A3351978-04-10010 April 1978 Submit Monthly Operating Report for the Month of March 1978 for Salem No. 1 ML19030A3371978-04-10010 April 1978 Submit Monthly Operating Report for the Month of March 1978 for Salem No. 1 ML19030A3381978-03-0707 March 1978 Submit Monthly Operating Report for the Month of February 1978 for Salem No. 1 ML19030A3401978-02-15015 February 1978 Submit Monthly Operating Report for the Month of January 1978 for Salem No. 1 ML19030A3411978-01-0909 January 1978 Submit Monthly Operating Report for the Month of December 1977 for Salem No. 1 ML19030A3431977-12-0909 December 1977 Submit Monthly Operating Report for the Month of November 1977 for Salem No. 1 ML19030A3471977-11-0404 November 1977 Submit Monthly Operating Report for the Month of November 1977 for Salem No. 1 ML19030A3491977-10-0505 October 1977 Submit Monthly Operating Report for the Month of September 1977 for Salem No. 1 ML19030A3511977-09-0909 September 1977 Submit Monthly Operating Report for the Month of August 1977 for Salem No. 1 ML19030A3531977-08-10010 August 1977 Submit Monthly Operating Report for the Month of July 1977 for Salem No. 1 ML19030A3561977-07-0808 July 1977 Submit Monthly Operating Report for the Month of June 1977 for Salem No. 1 ML19030A3591977-06-0606 June 1977 Submit Monthly Operating Report for the Month of May 1977 for Salem No. 1 ML19030A3601977-05-0909 May 1977 Submit Monthly Operating Report for the Month of April 1977 for Salem No. 1 ML19030A3611977-05-0909 May 1977 Submit Monthly Operating Report for the Month of April 1977 for Salem No. 1 ML19030A3621977-04-0606 April 1977 Submit Monthly Operating Report for the Month of March 1977 for Salem No. 1 ML19030A3641977-03-0303 March 1977 Submit Monthly Operating Report for the Month of February 1977 for Salem No. 1 ML19030A3661977-02-0707 February 1977 Submit Monthly Operating Report for the Month of January 1977 for Salem No. 1 ML19030A3681977-01-28028 January 1977 Submit Monthly Operating Report for the Month of December 1976 for Salem No. 1 ML19030A3691977-01-12012 January 1977 Submit Monthly Operating Report for the Month of December 1976 for Salem No. 1 ML19030A3711976-12-0101 December 1976 Submit Monthly Operating Report for the Month of November 1976 for Salem No. 1 ML19030A3721976-12-0101 December 1976 Submit Monthly Operating Report for the Month of November 1976 for Salem No. 1 ML19030A3741976-11-0101 November 1976 Submit Monthly Operating Report for the Month of October 1976 for Salem No. 1 ML19030A3761976-10-18018 October 1976 Submit Monthly Operating Report for the Month of September 1976 for Salem No. 1 ML19030A3771976-09-14014 September 1976 Submit Monthly Operating Report for the Month of August 1976 for Salem No. 1 2023-02-28
[Table view] Category:Monthly
MONTHYEARLR-N04-0013, December 2003 Monthly Operating Report Salem Generating Station Unit 22004-01-15015 January 2004 December 2003 Monthly Operating Report Salem Generating Station Unit 2 ML19031A3521978-10-10010 October 1978 Submit Operating Report for Month of September 1978 ML19030A3241978-09-12012 September 1978 Submit Monthly Operating Report for the Month of August 1978 for Salem No. 1 ML19030A3261978-08-10010 August 1978 Submit Monthly Operating Report for the Month of July 1978 for Salem No. 1 ML19030A3291978-07-12012 July 1978 Submit Monthly Operating Report for the Month of June 1978 for Salem No. 1 ML19030A3281978-07-10010 July 1978 Attached Monthly Operating Report of Industrial Waste Treatment Plant for the Month of June 1978 ML19030A3311978-06-0909 June 1978 Submit Monthly Operating Report for the Month of May 1978 for Salem No. 1 ML19030A3321978-06-0909 June 1978 Submit Monthly Operating Report for the Month of May 1978 for Salem No. 1 ML19030A3341978-05-10010 May 1978 Submit Monthly Operating Report for the Month of April 1978 for Salem No. 1 ML19030A3351978-04-10010 April 1978 Submit Monthly Operating Report for the Month of March 1978 for Salem No. 1 ML19030A3371978-04-10010 April 1978 Submit Monthly Operating Report for the Month of March 1978 for Salem No. 1 ML19030A3381978-03-0707 March 1978 Submit Monthly Operating Report for the Month of February 1978 for Salem No. 1 ML19030A3401978-02-15015 February 1978 Submit Monthly Operating Report for the Month of January 1978 for Salem No. 1 ML19030A3411978-01-0909 January 1978 Submit Monthly Operating Report for the Month of December 1977 for Salem No. 1 ML19030A3431977-12-0909 December 1977 Submit Monthly Operating Report for the Month of November 1977 for Salem No. 1 ML19030A3471977-11-0404 November 1977 Submit Monthly Operating Report for the Month of November 1977 for Salem No. 1 ML19030A3491977-10-0505 October 1977 Submit Monthly Operating Report for the Month of September 1977 for Salem No. 1 ML19030A3511977-09-0909 September 1977 Submit Monthly Operating Report for the Month of August 1977 for Salem No. 1 ML19030A3531977-08-10010 August 1977 Submit Monthly Operating Report for the Month of July 1977 for Salem No. 1 ML19030A3561977-07-0808 July 1977 Submit Monthly Operating Report for the Month of June 1977 for Salem No. 1 ML19030A3591977-06-0606 June 1977 Submit Monthly Operating Report for the Month of May 1977 for Salem No. 1 ML19030A3601977-05-0909 May 1977 Submit Monthly Operating Report for the Month of April 1977 for Salem No. 1 ML19030A3611977-05-0909 May 1977 Submit Monthly Operating Report for the Month of April 1977 for Salem No. 1 ML19030A3621977-04-0606 April 1977 Submit Monthly Operating Report for the Month of March 1977 for Salem No. 1 ML19030A3641977-03-0303 March 1977 Submit Monthly Operating Report for the Month of February 1977 for Salem No. 1 ML19030A3661977-02-0707 February 1977 Submit Monthly Operating Report for the Month of January 1977 for Salem No. 1 ML19030A3681977-01-28028 January 1977 Submit Monthly Operating Report for the Month of December 1976 for Salem No. 1 ML19030A3691977-01-12012 January 1977 Submit Monthly Operating Report for the Month of December 1976 for Salem No. 1 ML19030A3711976-12-0101 December 1976 Submit Monthly Operating Report for the Month of November 1976 for Salem No. 1 ML19030A3721976-12-0101 December 1976 Submit Monthly Operating Report for the Month of November 1976 for Salem No. 1 ML19030A3741976-11-0101 November 1976 Submit Monthly Operating Report for the Month of October 1976 for Salem No. 1 ML19030A3761976-10-18018 October 1976 Submit Monthly Operating Report for the Month of September 1976 for Salem No. 1 ML19030A3771976-09-14014 September 1976 Submit Monthly Operating Report for the Month of August 1976 for Salem No. 1 2004-01-15
[Table view] |
Text
'
PS~G e Public Service Electric and Gas Company 80 Park Place Newark, N.J. 0.7101 Phone 201/622-7000 September 14, 1976 Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. c. 20555
Dear Sir,
MONTHLY OPERATING REPORT SALEM NO. 1 DOCKET NO. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, and USNRC Regulatory Guide 1.16, 10 copies of the following monthly operating reports for the month of August 1976 are hereby submitted:
Appendix B - Average Daily Unit Power Level Appendix C - Operating Data Report Appendix D - Unit Shutdowns and Power Reductions Sincerely yours,
')~
F. P. Librizz~
General Manager -
Electric Production RE&UU\10.RY DOCKET f~lt COPY 9613 The Energy People 95-2001 300M 8*75
.....Ii
.. *.~_.... : .___'.___ ------------* -- _..-:.....------*---****-*-'-*------***_,._.:......_ __ .. --~----*. ---* ..
.., ,r...~_/t;
- APPENDIX B AVERAGE DAILY UNIT- POWER LEVEL
.. DOCKET NO . 50-272 UNIT Salem No. 1 DATE 9/_7/_76.
COMPLETED BY J.M.Zupko,Jr.
TELEPHONE 609-.365-700p Ext~ 507 MONTH AUGUST 1976 DAY AVERAGE DAILY POY/ERLEVEL DAY AVERAGE DAILY PO\VER LEVEL
(.M\Ve-Nct) (MWe-Nct) 1 NLA - See Belo:'d* 17 NLA 2 N/A 18 NA 3 NLA 19 NLA 4 N/A 20 NLA 5 NLA 21 N/A . -- i 6 Nl_A 22 NA 7 N/A 23 N/A 8 N/A 24 N/A 9 N/A 25 N/A 10 Nl_A 26 N/A 11 27 NLA 12 N/A 28 N/A 13 N/A 29 Nf_A 14 N/A 30 N/A 15 N/_A 31 N/_A 16 N/A
- Salem No. 1 Unit limited to 1% of core thermal power by operating license No. DPR-70.
INSTRUCTIONS .
On this form, list the average daily u11it power level in ~1\\'c-Nrt for each da)' in the repurting mo11th. C'ompule to tlie-nearcst whole 11wgawat t.
These fit~llfcs will be used to plot a ~raph for r:1cl1rrpo1ti11g11wnth. Nute lhal whl'll 111:1xi11111111 dcpl'11d:1hk l';1pal'ity is used for the nt*I ckt*trk:d rating lll' the unit, there 111:1)' lw 1wc:1siu11s when the daily avcr;q~c pl>\n:r kwl _t'Xt't*cds the 100'};, line (or the rcstrii:tcd. pmwr lc\'cl line). 111 such t~:iscs. tlie awr:igt* daily unit pnwcr output ~ht't't ~huiild lw foutnotcd lo r:q1lai11 lilt* :qip;_Hl'lll :111rn11a!y.
l.J(,.g
- OPERATING DATA REPORT APPENDIX C
- DOCKET NO. -~~5_0_-_2......:7_2_*~
\
UNIT ___s_a_l_e_m_N_o_._ l_ _
.. DATE -~9~/_7~/_7_6~--~
COMPLETED BY ___ J_._M_.-=Z=-u.:.:.p~k-=o_.:,_:J_:r::....;;__.
TELEPHONE _ _6_0_9_-_3_6_5_-......:7......:0_0_0_
Ext. 507 OPERATING STATUS
- 1. R EPO RTI NG PER IO D: _Ao..::.o:U;...;:,Go:..:Uo:..:S:::..T=-...:::1:..:9:....7,_6><---- GROSS HOURS IN REPORTJNG PERIOD:_~7_4_4~,,.-=---
.to be .
- 2. CURRENTLY AUTHORIZED POl-\'ER LEVEL (MWt): 33. 38 MAX. DEPEND. CAPACITY (rY.We-Nct): determined DESIGNELECTRICALRATING(MWe-Net): 1090 . I
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): _....:.S:::..e=e'---=i:;..;t:::..e::::.m:.!!.-...:4~b:::..e=l~o'-"w'-----
- 4. REASONS FOR RESTRICTION (IF ANY):
Operating license r e s t r i c t i o n to 1% THIS MONTH YRTO DATE CUMULATIVE of core thermal power.
- 5. NUMBER OF !lOURS REACTOR WAS CRITICAL .*************. _ _ N,,_/_A_ N/A N/A G. REACTOR RESERVE SHUTDOWN HOURS ******************* _ _N_./'-A __ N/A I'J/A 7'. HOURS GENERATOR ON LINE . * * * * * * * * * * * * * * * * * . * . * * . . . _ _N_./'-A'-'-- N/A N/A
- 8. UNIT RESERVE SHUTDOWN HOURS *****.***************. _ _ N,_/_A_ N/A __ N~/A~;
_/
- 9. GROSS THERMAL ENERGY GENERATED (MWH) ***..*******.* _ _..;;;N""'/;....;A;;.;o__ N/A N/A
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWHJ . . . . * * * . * * * . . _ __::N_,_./c..:A=-- N/A N/A
- 11. NET ELECTRICAL ENERGY GENERATED (MWHJ .*******.*..** _ __::_:.N,,_/.::.::A;__ N/A N/A
. 12. REACTOR SERVICE FACTOR .***********..*.***...*.***** _ __::_:.N,,_/.::.::A'-- N/A N/A
- 13. REACTOR AVAILABILITY FACTOR **..********** *~ **..*.*.* ---=N:.J.../..:..A,,__ N/A NIA
- 14. UNIT SERVICE FACTOR *********.******* , ** , ****..***** _ _.:...;N,,_/.::.::A:-.. N/A N/A
- 15. UNIT AVAILABILITY FACTOR .*** , **.********* , ******** _ _ N,,_/_A_ N/A N/A
- 16. 'UNIT CAPACITY FACTOR (Using MDC) .******************** _ _ N_!._/_A_ N/A N/A
- 17. UNIT CAPACITY FACTOR (Using Design MWe) ***************** _ __,_,N..L../~A~ N/A N/A
- 18. UNIT FORCED OUTAGE RATE ************* , ********** ,
- _ __.;:;..;N_,_/""'A'-- N/A N/A
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
- 20. IF SHUT DOWN AT'END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: _ _ _ _ _ __
- 21. UNITS IN TEST STATUS (PRIOR TO COMMrnCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 9/30/76_ __
INITIAL ELECTRICITY 11/01/76._ _~
12/20/76 COMMERCIAL OPERATION*
l.J 6-9
APPENDIX D DOCKET NO. 50-272 UNIT SHUTDOWNS AND POWER .REDUCTIONS UNIT NAME Salem No. 1 I)ATE 9/7/76
<;:OMPLETED BY J.M.Zupko,Jr.
REPORT MONTH _ 9_7_6_"_
_A_U_G_u_s_T_1 TELEPHONE 609-365-7000 I Ext. 507 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER (2) CORRECTIVE ACTIONS/COMMENTS (1) REASON A: EQUIPi\lENT FAILURE (EXPLAIN)
B: MAINT. OR TEST C: REl'UELING D: REGULATORY RESTRICTION E: OPERATOR.TRAINING AND LICENSE EXJ\rnNATION f": AD;\!INISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)
. II: OTHER (EXPLAIN) .
(2) METHOD 1: MANUAL 2: MANUAL SCRAM.
3: AUTOMATIC SCRAM
. 4: OTHER (EXPLAIN)
~
. Information for this report not applicable - Salem No. 1 initial startup testing.
,.\
Sl}MMARY:
.\__, )
. l k