LR-N04-0013, December 2003 Monthly Operating Report Salem Generating Station Unit 2
| ML040280411 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 01/15/2004 |
| From: | Fricker C Public Service Enterprise Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| LR-N04-0013 | |
| Download: ML040280411 (3) | |
Text
Nuclear Training Center I.
PSEG Nuclear LLC 244 Chestnut Street, Salem, NJ 08079 JAN 1 5 2004 LR-N04-001 3 o PSEG A Tnlem-LLC U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 MONTHLY OPERATING REPORT SALEM GENERATING STATION UNIT 2 DOCKET NO. 50-311 In compliance with Section 6.9, Reporting Requirements for the Salem Unit 2 Technical Specifications, the operating statistics for December 2003 are being forwarded.
Sincerely, C rl ricker Sale Plant Manager Attachments C Distribution NATIONAL III ACADEMY III FOR NUCLEAR I TRAINING I>a'L
DOCKET NO.:
50-311 UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
Salem 2 1/9/04 F. Todd (856) 339-1316 Reporting Period December 2003 OPERATING DATA REPORT Design Electrical Rating (MWe-Net)
Maximum Dependable Capacity (MWe-Net)
No. of hours reactor was critical No. of hours generator was on line (service hours)
Unit reserve shutdown hours Net Electrical Energy (MWH) 1131 6_-_4____
1116 Month Year-to-date Cumulative 744 7418 127834 744 7355 124313 0
o 0
851243 8095612 127284587 UNIT SHUTDOWNS NO.
DATE TYPE DURATION REASON METHOD OF CORRECTIVE ACTION/
F=FORCED (HOURS)
(1)
SHUTTING COMMENT S=SCHEDULED DOWN THE
_ _ I _
_ I R EA C TO R (2)
(1) Reason (2) Method A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)
H - Other 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)
DOCKET NO.: 50-311 UNIT: Salem 2 DATE: 1/9/04 COMPLETED BY: R. Ritzman TELEPHONE: (856) 339-1445 Summary Of Monthly Operating Experience Salem 2 entered the month at a reduced power level and reached 99% power on December 1. Salem 2 operated at 99% power for the remainder of the month.
At the end of the month, Salem 2 completed 34 days of continuous on-line operation.