PSEG Nuclear LLC Richard DeSanctis, Jr.
Plant Manager - Salem P. 0. Box 236, Hancocks Bridge, NJ 08038 - 0236 Tel: 856-339-1060, Fax: 856-339-2956
- LR-N24-0009 February 05, 2024 email: Richard.DeSanctisJr@pseg.com U.S. Nuclear Regulatory Commission
- ATTN: Document Control Desk Washington DC 20555-0001 Salem Generating Station Unit 1 o PSEG I NUCLEAR ASME Code Case N-532-5 Renewed Facility Operating License DPR-70 NRC Docket No. 50-272
Subject:
In-Service Inspection Activities This letter submits the Owner's Activity Report for In-Service Inspection (ISi) activities conducted at the Salem Generating Station Unit 1 during the twenty-ninth refueling outage. This report is submitted in accordance with Code Case N-532-5 "Repair/Replacement Activity Documentation Requirements and In-Service Summary Report Preparation and Submission Section XI, Division 1." to this letter contains the required Salem Unit 1 Owner's Activity Report.
There are no commitments contained in this letter.
Should you have any questions regarding this submittal, please contact Ms. Bernadette
. Humphrey at 856-339-1308.
Sincerely, Richard J. Desanctis Plant Manager - Salem - Salem Unit 1 Owner's Activity Report-S1 R29
+-
- February 05, 2024 LR-N24-0009 Page 2 cc:
USN RC - Administrator - Region 1 USNRC - Licensing Project Manager-Salem USNRC Senior Resident Inspector NJDEP, Bureau of Nuclear Engineering Corporate Commitment Coordinator - PSEG
- LR-N24-0009 Salem Unit 1 Owner's Activity Report-S1 R29
FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number.,,,S,..1....,R..,2=9 ___________ ___________________
Plant Salem Generating station Unit No. __
__,_ ____ Commercial Service Date July 1, 1977 Refueling Outage no. ---=2=9 ___ _
(If 11ppllcahle)
Current Inspection Interval ISi Fifth ffilh), CISI - Third (3rd)
(Ill, :bid, 3nl, 411, othtT)
Current Inspection Period ISi First (16~. CISI - First (161)
(ht.:lnd. 3111)
Edition and Addenda of Section XI Applicable to the Inspection Plans 2013 Edition, No Addenda Date and Revision of Inspection Plans ISl(CISI) Revision 5, October 2023 Edition and Addenda of Section XI Applicable to Repair/Replacement Actlvltles, If differerrt than the Inspection Plans __ _
Same as ISi (CISI) Plan Code Cases used for Inspection and evaluation: N-532-5, N-716-1, N-722-1 CERTIFICATE OF CONFORMANCE I certify that (a) lhe statements made in this report are correct; (b) Iha examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repairheplacement activities and evaluations supporting the completion of S1R29 Conform to the requirements of Section XI.
(Rct\Jdlng outage number>
Slgoed ~MT..
Edley T GIies / ISi Program Owner Dale 1-&'/zo.2.r CERTIFICATE OF INSERVICEINSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boller and Pressure Venel Inspectors and employed by Hartford steam Boiler Inspection and Insurance Company of Hartford, Connecticut have Inspected the items descflbed In this Owner's Activity Report, and state that, to the best of my knowledge and belief, the ONner has perfonned ell activities represented by this report in accordance v.ith the requirements of Section XI.
By signing thl$ certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the repair/replacement activities and evaluelion described In this report Furthermore, nollhor the Inspector nor his employor shall be liable In any manner for any personal injury or propaftY. damaga or a loss of any kind arising from or connected with this inspection.
/
/2
~
Daniel Ca erton r 1 ~
commission NB16247,N, I, R / NJ1238 (Nllllonal llowNumbu a,d End"'""'anl)
Exam Cale&orv A-E FORM OAR-1 OWNER'S ACTIVITY REPORT TABLE1 ITEMS WITH FLAWSOR RELEVANTCONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Item Item Description Evaluation Dascriptlon Number MRP-227A Ultrasonic Examination of Evaluation was performed under order Thermal Shield Support Block 70231970 operation 20 and 80135312 for Bolts revealed both bolts both l>Z.. 292° Thermal Shield Support located at the AZ.. 292° Block Bolts failed and subsequently support block exhibited removed without replacement indications at the head to shank interface consistent with a failed boll TABLE2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Item Description of Work Date Repair/Replacement Code Class Description Complete Plen Number none none none none none