ML19030A341

From kanterella
Jump to navigation Jump to search
Submit Monthly Operating Report for the Month of December 1977 for Salem No. 1
ML19030A341
Person / Time
Site: Salem  PSEG icon.png
Issue date: 01/09/1978
From: Heller H
Public Service Electric & Gas Co
To:
NRC/IE, Office of Nuclear Reactor Regulation
References
Download: ML19030A341 (6)


Text

'*

PS~G Public Service Electric and Gas Company Salem Generating Station P. 0. Box #168 Hancocks Bridge, New Jersey 08038 January 9, 1978 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

MONTHLY OPERATING REPORT SALEM NO. 1 DOCKET NO. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, 10 copies of the following monthly operating reports for the month of December, 1977 are being sent to you.

Appendix B -

Average Daily Unit Power Level Appendix C Operating Data Report Appendix D Unit Shutdowns and Power Reductions Sincerely yours, H. J. Heller Manager -

Salem Generating Station JMZ :jcm cc:

Mr. Boyce H. Grier Director of u. S. NRC Enc.

Off ice of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, PA 19406 Director, Office of Management Information and Program Control U.S. Nuclear Regulatory Corr.mission Washington, DC 20555 Pg. 1-4 8-1-7.R2 The Energy People (1 Copy)

(2 Copies) 95-2189 (2M) 10-76

l e

APPENDIX B AVERAGE DAILY UNIT POWER LEVEL MONTH December, 1977 DAY AVERAGE DAILY POWER LEVEL 1

2 3

4 5*

6 7

8 9

10 11 12 13 14 15 16 Pg. 2-4 8.1-7.RL.

(MWe-NET) 0 0

0 432 616 184 519 730 977 1045 624 961 984 975 1095 983 DOCKET NO.

50-272 UNIT' Salem #1 DATE January 9, 1978 COMPLETED BY J.M. Zupko, Jr*.

TELEPHONE 609-365-7000 X507 DAY AVERAGE DAILY POWER LEVEL (MWE-NET)

~

17 1071 18 755 19 1054 20 505 21

,1041 22 1066 23 1014 24 1117 25 1082 26 694 27 948 28 1017 29 549 30 848 31 1050

L Pg. 4 8-1-7.Rf

.APPF.NDIX C OPERAT.ING DAIA P.EFORT 50-272 IX:CKET UNIT Salem #1 DATE January 9, 1978 CG1PLE!El) '?:{

J.M. Zupko, Jr.

OPERATING S'IA'ITJS TEI.EPHJNE*

609-365-7000 X507

1. REPORI'ING PEUOD: December. 1 g 7 ]GROSS HOURS IN REPORTING PERIOD:_7_4_4 _______ _
2.

CtlRRENrl.Y AlJ'IHORIZED FOWER WJEL ()Mt) i3338 MAX.DEPEND.CAPACITI(.MWe-NEl') :_1_0_79 __

DESIGN ELECTRICAL RATING(MWe-Net) :_1_0_90 __

3.

PCWER. LEVEL TO WHICli RESTRICTED (IF mi) ()!We-Net) :_N_o_n_e ________ _

4.

REASONS FOR RESl'RICI'ION (IF ANY) :.

ms MJNI'H YR TO DATE S.

NUMBER OF mJRS REACTOR WAS CRITICAL *

  • 653.9 o.o
6.

REACTOR RESERVE SHin'OOWN HOURS * * * * * * * ----

1. HOURS GENERATOR ON LINE * * * * *..... 640.5
8.

tJNIT RESERVE SEIJ'I'IXn'u~ HOURS * * * * * * *

  • O
  • O
9.

GROSS ~

ENERGY GENEOO'ED (}n'IH) * * *

  • 177 7 5 9 4 2543.2 o.o 2430.6 0.0 6695220
10.

G?.OSS EI.ECIRICAL F.NERG'f GENERATED (}1?IHJ

  • 6 o 2 9 J. o 218 6 31 o
11. NET ELECTRICAL ENERG"l GENERATED (MMi) * * *
  • 5 7 4 5 8 5.*

2 o 5 51 7 5

12.

REACI'OR SERVICE F.ACl'OR * * * * * * * * *

  • 87.9 57.3
13.

REAcrOR AVAII.ABILIT! FACI'OR ***

14. UNIT SERVICE F.ACI'OR * * * * * * *
15. OOT AVAILABII.ITf FACTOR * * * **
16. tJNlT CAPACIT'f FACIOR(Using MOC)* *
87. 9 8_6_.1_

57.3 54.7

  • * * *.__.._8_6 -* l_ ___;,5_4_. 7._

1 __

0..... 9,___

---=4-=-2~. 5;;;.,

17. UNIT CKPN::r!'f FACTOR(Using Design MNe) *** _

_..7...,.1...,.. 6.__ _

__...4=2....,. 9....

is. UNIT FORCED OtJTAGa RATE * * * * * * *, *

  • __

4 _. 1_ __1_2_. 8_

aMJLATIVE 2543.2 0.0 2430.6 0.0 6695220 2186310 2055175 57.3 57.3 54.7 54.7 42.5 42.9 12.8

19.

SEUI'!O'.VNS SCHEDULED OVER NEcr 6 MJNI'HS(m'E,~""E,.AND DURATJ;ON OF EAOl):

ZO.

IF SHUT ~NAT END.OF ?.Er-OR! PERIOD, ESTIMATED DATE OF sr..um.JP: --------

Zl.

.TJNI'I'S IN T5t sr.A.TUS (PRIOR TO CCMERCI.4.L OPERATION) :

FORECAST IN!TIAL CRITIC..4.LIT!

9-3 o - 7 6 INITIAL ELEC!'RIC!Tl 11-o 1-7 6 12-20-76

. AC:fiEVED 12-11-76 12:-25-76 6-30-77

APPENDIX D DOCKET NO.

50-272 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Salem #1

~-

DATE January 9, 1978 COMPLETED BY J.M. Zupko, Jr.

TELEPHONE 609-365-7000 X507 REPORT MONTH December METHOD OF TYPE OUTAGE SHUTTING DOWN F: FORCED DURATION TIIE REACTOR OR NO.

DATE S: SCHEDULED (HOURS)

REASON REDUCING POWER CORRECTIVE ACTIONS/COMMFtITS

  • 77-123 11-29-77 F

0 B

l Cleaned #12 S.G. Feed Pump Suction Strainer.77-124 11-30-77 F

71.5 B

l Repair #12 S.G. Feed Pump Suction Suction Valve.77-125 12-5-77 F

10.8 A

3 Loss of Suction on #13 Condensate Pump Due to Plugged Strainer.77-126 12-6-77 F

3.7 A

3 Loss of 12A, 12B, 13A and 13B Circulators due to High Screen 61'.

  • 77-127 12-9-77 s

0 B

l Clean #11,12 & 13 Condensate Pump Suction Strainers.

  • 77-128 12-10-77 s

0 B

l Cycling Heater Drain Purrps to Clean Condensate System.

  • 77-129 12-11-77 s

0 B

l Clean 11, 12, 13 Condensate Pump Suction Strainers.

  • 77-130 12-11-77 s

0 B

l Clean 11, 12 S.G. Feed Purrp Suction Strainers.

SUMMARY

Pg.4-4 8.1-7.Rl

  • LOAD REDUCTION.

TYPE F: FORCED NO.

DATE S: SCHEDULED

  • 77-131 12-13-77 F
  • 77-132
  • 77-133
  • 77-134
  • 77-135
  • 77-136
  • 77-137
  • 77-138 77-139

SUMMARY

Pg.4-4 8.1-7.R 1 2-14-77 F

2-16-77 F

2-17-77 s

2-18-77 s

2-18-77 s

2-18-77 s

2-18-77 s

12-20-77 F

  • LOAD REDUCTION.

DOCKET NO.

50-272

\\'

APPENDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Salem #1 DATE January 9, 1978 COMPLETED BY J.M. Zupko, Jr.

TELEPHONE 609-365-7000 X507 REPORT MONTH December, 1977

'METHOD OF OUTAGE SHUTTING DOWN DURATION TilE REACTOR OR (HOURS)

REASON REDUCING POWER CORRECTIVE ACTIONS/COMMENTS 0

B 1

Clean #12 Condensate Pump Suction Strainer.

0 B

1 Clean No.#11 Condensate Pump Suction Strainer.

0 B

1 Clean #11,12,& 13 Condensate Pump Suction Strainers.

0 B

1 cle Heater Drain Pumps to Clean ondensate System.

0 B

1 cle Heater Drain Pumps to Clean ondensate System.

0 B

1 cle Heater Drain Pumps to Clean ondensate System.

0 B

1 lean 11, 12, 13 Condensate Pump uction Strainers.

0 B

1 lean 11 and 12 S.G. Feed Pump uction Strainers.

7.3 A

3 12 S.G *. Feed Pump Tripped.

TYPE F: FORCED NO.

DATE S: SCHEDULED

  • 77-140 tl2-23-77 s
  • 77-141 112-26-77 s
  • 77-142 112-27-77 F
  • 77-143 0..2-28-77 F

77-144 0..2-29-77 F

SUMMARY

  • LOAD REDUCTION.

Pg.4-4 8.1-7.R 1 APPENDIX D UNIT smITDOWNS AND POWER REDUCTIONS REPORT MJNTH December, 19 77 METHOD OF OUTAGE SHUTTING DOWN DURATION Tiffi REACTOR OR (HOURS)

REASON REDUCING POWER 0

B 1

0 B

1 0

B 1

0 B

1 10.2 A

3 DOCKET NO.

50-272 Salem #1

~

UNIT NAME

'1 DATE January 9, 1978 COMPLETED BY J.M. Zupko, Jr.

TELEPHONE 609-365-7000 X507 CORRECTIVE ACTIONS/COMMENTS Clean 11, 12 & 13 Condensat~ Pump Suction Strainers.

Repair S. G ~ Feed Pump Turning Gear.

Clean 11, 12 & 13 Condensate Pump Suction Strainers.

Clean 11, 12 & 13 Condensate Pump Pump Suction Strainers.

  1. 11 S.G. Feed Pump Trip.