ML19030A353

From kanterella
Jump to navigation Jump to search
Submit Monthly Operating Report for the Month of July 1977 for Salem No. 1
ML19030A353
Person / Time
Site: Salem  PSEG icon.png
Issue date: 08/10/1977
From:
Public Service Electric & Gas Co
To:
NRC/IE, Office of Nuclear Reactor Regulation
References
Download: ML19030A353 (5)


Text

.. PSE~

Public Service Electric and Gas Company Salem Nuclear Generating Station P.O. Box #168 Hancocks Bridge, New Jersey 08038 August lO, Director Off ice of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555

\, MONTHLY OPERATING REPORT

\ SALEM GENERl>~TING STATION In compliance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, the following Monthly Operating Reports for the month of July 1977 are being sent to you.

(Original plus 10 copies)

Appendix B - Average Daily Unit Power Level Appendix C - op*erating Data Report Appendix D - Unit Shutdowns and Power Reductions Additional copies of the Monthly Operating Reports are being sent to:

1. Mr. James P. O'Reilly (1 COPY)

Director of US NRC Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, PA 19406

2. Director, Office of Management Information (2 COPIES) and Program Control US Nuclear Regulatory Commission Washington, D.C. 20555 Manager - Salem Generating Station Enc.

Pg. 1-4 8-1-7. Rl The Energy People 95-2189 (5M) 10-72

APPENDIX B e

- AVERAGE DAILY UNIT POWER LEVEL

~

- 50-272 DOCKET NO. - -

~

UNIT , SALEM # 1 J

~

DATE Augast 8, 1977

- COMPLETED BY - - J. M. Zupko, J:i::.

~ TELEPHONE 309-365-7000 X50 7

~

MONTH JULY 1977 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NET) (MWE-:NET) 1 1048 17 897 2 1058 18 338 3 1076 19 1030 4 1052 -- 20 858 5 581 21 982 6 261 22 545 7 677 23 501 8 299 24 511 9 0 25 . 426 10 0 -26 578 11 Q 27 661

  • 12 0 28 544

. 13 461 29 769 14 822 30 364

.. 15 1070 31 762 16 1037 Pg. 2-4 8.1-7.Rl

APPF.NDIX C OPER.i\UNG DATA mo19 .

  • OOCKET NO. ____5_0_-_21_2_ _ _ __

UNIT Salem #1 DA'IE 8/9/77

1. CCMPLETED BY J.M. Zupko, Jr.

OPERATING S'l'AnIS TELEPHONE *309-365-7000 X507

1. REPORTING PERIOD: July 19 7 7 GROSS HOURS IN REPORTING PERIOD: __7_4_4_ ___..._
2. CURREN!!.Y AUl'HORIZED POWER LEVEL (MWt)3338 *MAX.DEPEND.CAPACITf(MWe-NET): lo 9 o DFSIGN ELECTRICAL RATING(MNe-Net): 1090
3. PCWER. LEVEL TO WHICi RESTRICTED (IF ANf) (MW'e-Net) :._N_o_n_e_ _ _ _ __
4. REASONS FOR RESTRICTION (IF .ANY) : .

'lmS MJN'lH YR TO DATE ctMJLATIVE 604.5 3,761 4,062.6 S. Nm4BER OP BllRS REACTOR WAS CRITICAL * * *

  • o.o

o.o.

6. REACTOR RF.SERVE SHTII'OOWN HOURS * * * * * * *

0*0

  • 1. HOURS GENERATOR ON LINE * * * ....... 583.3 3,371.9 3' 412. 2 .

UNIT RESERVE SHtl'I'OOWN HOURS * * * * .... ---- o.o o.o o.o

8. ---- ------

GROSS mERMAL ENERGY GENERATED(}m). * * .1 , 5 31 , 6 7 3 7,162,860 7,211,557 9.

10. GROSS ELECTRICAL ENERG'l GENERATED (MWH) * *
  • 489 , 330 2,282,940

2,286,170

\ 11. NET ELECl'RICAL ENERGY' GENERATED(M1'1H) **** 459,115 2,093,598 2,093,598 I 12. REA~ SERVICE FACTOR * * * * * * * * *

  • 81
  • 3 81.8 81.8 l 13. REACTOR AVAILABILIT! FACTOR * * * * * * * .* __0_1_._3_ _ _ _0_1_.0_ _ _ _ _0_1_.....0_

lI j 14.

  • UNIT SERVICE FACI'OR * * * * * . . . * * *
  • __7_8_._4_ 79.1 79.1 l lS. UNIT AVAILABILITY FACTOR * * * * * . ** . . .---- 78.4 79.1 79.1 UNIT CAPACITY FACI'OR(Using MDC). * . . . . .

I 56.6 57.2 16.

tlN1T *OOACm FACTOR(Using Design MNe) * * *__5_6_._6_ _ _ _5_7.;...2_ _ _ _ _s_1_._2_

, 17.

18. UNIT FORCED our.AGE RATE * * * * * * * * *
  • 22
  • 7 22.l 22.1
19. SHU"TOO'NNS SOiEDULED OVER Nm 6 MJNI'HS (TYPE ,DATE ,AND DURATJ;ON OF EA.01) : 9-17-7 7 Modif +/-cation of Low Pressure Turbine ZO. IF SHUT :OOWN AT END OF REFORI' PERIOD, ESTIMATED DATE OF sr.~: __.;.

N/A _______

Zl. UNITS IN TEST STATUS (PRIOR TO ca.MERCIAL OPERATION) : FO~CASr . * .ACHIEVED INITIAL CRITICALIT! 9 ..-3 O,... 7 6 12 7 6 INITIAL ELEC!RICITf 11..-01-76 12-25-76 Pg. ,:3-4 CCMt!ERCIAL OPERATION 12-20-76 6-30-77 8-1-7 .Rl~

APPENDIX D DOCKET NO. 50-272 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME SJ\.LE:M NO. l DATE 8/9/77 COMPLETED BY J. M. Zupko, Jr.

TELEPHONE 609-365-7000 X507 REPORT MONTH July 1977 METHOD OF TYPE OUTAGE SHUTTING DOWN F: FORCED DURATION TIIB REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS/COMMENTS 77',70 7-23-77 F 0.0 H 4 Clean #13 Condensate Pump Strainers 77-71 7-24-77 F o.o H 4 Cleari #12 Feed Pump Strainers 77-72 7-25-77 F 1.9 A 1 Partial Loss of Vacuum -

12 Vacuum Pump Seals 77-75 7-25-77 F o.o H 4 Clean #13 Condensate Strainer3 77-76 7-28-77 F o.o H 4 Clean S.G.Feedwater Pump Strainers 77-77 7-28-77 F 0.0 H 4 C*lean #12 Condensate Pump Strainers 77-78 7-29~77 F 0.0 H 4 Clean #11 Condensate Pump Strainers 77..-81 7-30-77 s 11.1 B 3 Elect.Trip Test from 100%

77-82 7-31-77 F 0.0 H 4 Clean Condensate Pump Straine rs l

SUMMARY

*LOAD REDUCTION.

Pg.4-4 I 8.1-7.R 1

APPENDIX D DOCKET NO. 5a-272 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME SALEM NO. 1 DATE 8/9/77 COMPLETED BY J. M. Zupko, Jr.

TELEPHONE 6a9-365-7aaa x5a 7 REPORT MONI'H Jl.llY 1977 METHOD OF TYPE OUTAGE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTJONS/CO:MMENI'S 77-47 7- 4-7 F a.a H 4 lean Condensate ~Pump Straine s 77-49 7- 5-7 F 13.7 A 1 enerator Voltag~ Regulator ailure,...4 KV under: voltage tr' p 77-5a 7- 6-7 F a.a H 4 lean #12 Condensate Pump strainers 77-51 7- 6-7 F a.a H 4 lean S.G.Feed Pump Strainers 77-52 7- 6-7 F 6.9 A 3 2 S~G.Low Level Trip-12 S.G.Feed Pump Control 77-53 7- 7-7 F a.a H 4 lean Condensate Pump Straine s 77-54 7- 8-7 F 112.6 D 2 xcessive R.C.S.Leakage -

Valve 1 CV-75 77-59 7-17-7 F a.a H 4 lean Condensers 77-6a 7-17-7 s 14.5 B 3 lectrical trip test from laa%

77-65 7-2a-7 F a.a D 4 Insufficient Bit Tank Boron Concentration 77-68 7-22-7 F a.a H 4 lean 12 S.G.Feed Pump Strain rs 77-69 7-23-7 F a.a H 4 lean 13 Condensate Pump Strainer

SUMMARY

*LOAD REDUCTION.

Pg. 4-4 8.1-7.R 1