ML19030A372

From kanterella
Jump to navigation Jump to search
Submit Monthly Operating Report for the Month of November 1976 for Salem No. 1
ML19030A372
Person / Time
Site: Salem  PSEG icon.png
Issue date: 12/01/1976
From: Heller H
Public Service Electric & Gas Co
To:
NRC/IE, Office of Nuclear Reactor Regulation
References
Download: ML19030A372 (4)


Text

,,_

Public Service Electric and Gas Company Salem Nuclear Generating Station P.O. Box 168 Hancocks Bridge, N.J. 08038 December 1, 1976 Director, Office of Inspection and Enforceme U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

MONTHLY OPERATING REPORT SALEM NO. 1 DOCKET NO. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, and USNRC Regulatory Guide 1.16, 10 copies of the following monthly operating reports for the month of November 1976 are hereby submitted:

Appendix B - Average Daily Unit Power Level Appendix C - Operating Data Report Appendix D - Unit Shutdowns and Power Reductions Sincerely yours, CC: Mr. James P. O'Reilly Director of U.S. NRC Office of Inspection Region I 631 Park Avenue King of Prussia, Pa. 19406 Director, Office of Management (2 Information and Program Control U.S. Nuclear Regulatory Commission Washington, D.C. 20555 New Jersey - 200 Years of Energy Leadership!

95-2189 (2M) 11-75

!ff-.'~.-.-: ...:_ .. ----*----------* **-***-------*----*---*-***--- - * * **--***-----

APPENDIX B AVERAGE DAILY UNIT POWER LEVEL 50- 2 7 2 .

. DOCKET NO.

' UNIT Salem No. l DATE _1_2...;.../_l~/~7_6_

COMPLETED BY J

  • M. Zupko, Jr.

TELEPHONE609-~65-700~

Ext. 50 I :-'j MONTH _____N_O_V_E_M_B_E_R__l_9_7_6__

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Nct) (l\fWe-Nct) 1 NLA - See Below* 17 N/A 2 N/A 18 NLA.

3 N/A 19 N/A 4 N/A 20 N/A

)

.../

5 21 N/A 6 N/A 22 N/A 7 23 N/A 8 N/A 24 N/A 9 NL'.A 25 N/A 10 N/A 26 N/A 11 NLA 27 NL'.A 12 NL'.A 28 N/A 13 NL'.A 29 N/A 14 NL'.A 30 N/A 15 N/A 31 N/A 16 NL'.A

  • Salem No. 1 Unit limited to 1% of core thermal power by operating license No. DPR-70.

INSTRUCTIONS 011 this ftirm, list the average daily unit power lcwl in MWe-Nc:t for c:id1 d:1) in the l"l!porting 111011th. C\nnputc to iii~

1 ncnrcst whole 1m~gawat t.

  • 111csc figures will be used lo plot a graph for each rt*po1ling1mmlh. Nl>tc that when maxinllllll dc11~'11d:1hlL* l :1pal'ity is 0

used for the m*t elct*trh::d r:1li11!?, of the unit, there m:1y be ol'casions when the daily avcr:q~e power kwl L'xn*..:ds the I 00% line (or tht! n*striclcd. ptnwr level line). 111 sud1 t~ases. the awragt* daily unit power oulpul ~ht*t*I shuidd b~*

footnoted to explain !he app:.iri:nt anomaly.

l.16-8

APPENDIX C *

,,.f ' OPERATING DATA REPORT .\

DOCKET NO. ~5~0~-~2~7~2..___~-~

UNIT Salem No. 1

.. DATE 12/1/76' COMPLETED BY J

  • M
  • Zupko, Jr.

TELEPHONE 609-365-7000 Ext. 507 OPERATING STATUS

1. REPORTING PERIOD: NOVEMBER 1976 GROSS HOURS IN REPORT.ING f'ERIOD:_,.~7.....2-.,01"------

to be .

2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3 3. 3 8 MAX. DEPEND. CAPACITY (MWe-Nctl: determined DESIGN ELECTRICAL RATING (MWe-Net): 1090
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Nat): See i tern 4 below I
4. REASONS FOR RESTRICTION {IF ANY):

Operating license restriction to l~

THIS MONTH YR TO DATE CUMULATIVE of core thermal power.

5. NUMBER OF HOURS REACTOR WAS CRITICAL ************.** N/A .N/A N/A

. . N/A N/A

6. REACTOR RESERVE SHUTDOWN HOURS .****************** N/A 7~ HOURS GENERATOR ON LINE *.. , *******.*** ***. , ****.*. NiA. Ni A Ni A
8. UNIT RESERVE SHUTDOWN HOURS , ** , , * , ******* , * , * , * , , NL'.A NL'.A N[A --, .

~ __,/

9. GROSS THERMAL ENERGY GENERATED. {MWH) *****.*****.** N/A N/A N/A
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) , ************ N/A N/A N/A
11. NET ELECTRICAL ENERGY GENERATED (MWH) ********.***** NL'.A N/A N[A
12. REACTOR SERVICE FACTOR **************..****.****.***
  • N/A N/A N/A
13. REACTOR AVAILABILITY FACTOR **********************.* NL'.A NL'.A NLA
14. UNIT SERVICE FACTOR *********.***************.****** N/A N/A NL'.A
15. UNIT AVAILABILITY FACTOR , ** , *.******************** N/A N/A NL'.A
16. 'UNIT CAF'ACITY FACTOR (Using MDC) ** " ****************** N/A N/A NL'.A
17. UNIT CAPACITY FACTOR {Using Design MWc) *.********* , ***** N/A N/A N/A
18. UNIT FORCED OUTAGE RATE ******************** , ***** N/A N/A Ni A
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
20. IF SHUT DOWN AT"END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: _ _ _ _ _ __
21. UNITS IN TEST STATUS (PRIOR TO COMMr::RCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 9L'.30L'.76 INITIAL ELECTRICITY 11/01/76 COMMERCIAL OPERATION 12/20/76 1.16-9

\

APPENDIX D 5*0-272 DOCKETNO. __________ "'7 __

UNIT SHUTDOWNS AND POWER .REDUCTIONS UNIT NAME Sal.em No. 1 QATE 12/1/76 GOMPLETED BY J.M. Zupko, Jr.

REPORT MONTH NOVEMBER 1976 TELEPHONE 609-:-365-7000 Ext. 507 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REAC.TOR OR NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER (2) CORRECTIVE ACTIONS/COMMENTS (1) REASON A: EQUIPMENT FAILURE (EXPLAIN)

D: MAINT. OR TEST C: REPUELING D: REGULATORY RESTRICTION E: OPERATOR.TRAINING AND LICENSE EXAMINATION F: AD~llNISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)

H: OTHER (EXPLAIN)

(2) METHOD I: MANUAL 2: MANUAL SCRAM.

3: AUTOMATIC SCRAM 4: OTHER (EXPLAIN)

Information for thLs report not applicable - Salem No. 1 initial startup testing.

SUMMARY

"'--)