ML19030A374

From kanterella
Jump to navigation Jump to search
Submit Monthly Operating Report for the Month of October 1976 for Salem No. 1
ML19030A374
Person / Time
Site: Salem  PSEG icon.png
Issue date: 11/01/1976
From: Heller H
Public Service Electric & Gas Co
To:
NRC/IE, Office of Nuclear Reactor Regulation
References
Download: ML19030A374 (4)


Text

~,~.\\

.. \\

~.rs-~,

\\

... ~.\\.

~/

Public Service Electric and Gas Company Salem Nuclear Generating Station P. 0. Box 168 Hancocks Bridge, N.J, 08038 Director, Office of Inspection and' U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

MONTHLY OPERATING REPORT SALEM NO. 1 DOCKET NO. 50-272 November 1, In compliance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, and USNRC Regulatory Guide 1.16, 10 copies of the following monthly operating reports for the month of October 1976 are hereby submitted:

Appendix B - Average Daily Unit Power Level Appendix C - Operating Data Report Appendix D - Unit Shutdowns and Power Reductions Sincerely yours, H. J. Heller Manager -

Salem Generating Station CC:

Mr. James P. O'Reilly Director of U.S. NRC Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pa.

19406 Director, Office of Management Information and Program Control U.S. Nuclear Regulatory Commission Washington, D.C.

20555 New Jersey -

200 Years of Energy Leadership!

( 1 Copy)

( 2 Copies) tt.25Jl 95-2189 (2M) 11-75

J-*.....,~"'""" -*--""*------.. -- --*-**-***----... ***--------*--***-** --- -**--. **----**-----

e

  • e APPENDIX B AVERAGE DAILY UNIT-POWER LEVEL MONTH OCTOBER 1976 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

NLA -

See Below*

2 N/A 3

N/A 4

N/A 5

6 N/A 7

8 N/A 9

NLA 10 N/A 11 NLA 12 NL'.A 13 NL'.A 14 NL'.A 15 N/A 16 NL'.A DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 DOCKET NO.

S0- 272.

UNIT Salem No. 1 DA TE _l_l.._/ l_,_/~7~6-COMPLETED BY J

  • M. Zupko, Jr.

TELEPHONE 609 -~ 6 s-7 oorJ Ext. 50 I :'j AVERAGE DAILY POWER LEVEL (MWe-Nct)

N/A NL'.'.A

  • N/A N/A N/A

... /

N/A N/A N/A N/A N/A NLA N/A N/A N/A" N/A

  • Salem No. 1 Unit limited to 1% of core thermal power by operating license No. DPR-70.

INSTRUCTIONS On this fmm, list the average d:iily unit power lcwl in MWc-Nl:I for c:11.:b d:1)1 in the rcpt1rti11g, 111011th. Compute lo tli~

nearest wh olc llll~gawall.

These flgurcs will be used lo plot a f.raph for c;a;h rl*po1ti11g 111011th. Nntc that wlwn maximum dcpl'11d:1hll' c:1p:1dty is used for the m*t clcl*trkal rating nf the unit. thl'rc 111:1y be lll'L':1sio11s wlien the daily avcr:1gc power kwl l'xn*cds the I 00% line (or lhL~ n~slrkted. (lll\\Wr kvcl line). In such cases. the awragl~ daily unit pllwcr output ~ill'l'I shu11ld lw fout1mtcd tu explain the app;!r~nt a11om:tly.

I.I 6-8

APPENDIX C OPERATING DATA REPORT DOCKET NO. ~5~0_-~2~7~2~--

UNIT Salem No.

1

~

DATE _l_l..;..../_l.._/_7_6_* -----

COMPLETED BY J

  • M
  • Zupko, Jr.

TELEPHONE 609-365-7000

  • I Ext. 507 OPERATING STATUS
1. REPORTING PERIOD:

OCTOBER 19 7 6 GROSS HOURS IN REPORTJNG PERIOD:__,._..... 7_4_4 ____

to be

2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3 3. 3 8 DESIGN ELECTRICAL RATING (MWe-Net):_=l,,.,0-""9_,,,_0'----

MAX. DEPEND. CAPACITY (MWe-Nctl: determined

3. POWER LEVEL TO WHICH RESTRICTED {IF ANY) (MWe-Nct): See i tern 4 below
4. REASONS FOR RESTRICTION (IF ANY):

Operating license restriction to 1%

of core thermal power.

5. NUMBER OF HOURS REACTOR WAS CRITICAL *.**..*...*..**
6. REACTOR RESERVE SHUTDOWN HOURS.*.**..*....*.. : *..

1: HOURS GENERATOR ON LINE.....** : *.*.***.***..**.*.

8. UNIT RESERVE SHUTDOWN HOURS.**...***.*......*....
9. GROSS THERMAL ENERGY GENERATED (MWH) *........*....
10. GROSS ELECTRICAL ENERGY GENERATED (MWH)....*....*...
11. NET ELECTRICAL ENERGY GENERATED {MWH).******.**....
12. RE~CTOR SERVICE FACTOR.*..**.***...*.. * ***...**.*..
13. REACTOR AVAILABILITY FACTOR......******..***.**...
14. UNIT SERVICE FACTOR.*****.**.**********.**.*.*****.
15. UNIT AVAILABILITY FACTOR..******.****************,
16. 'UNIT CMACITY FACTOR {Using MDC).*..******.***..*, *..,
17. UNIT CAPACITY FACTOR (Using Design MWcl, *****,,.*, *,, *,.
18. UNIT FORCED OUTAGE RATE.,, *., **, *,, *****, : **,.,..

THIS MONTH YRTO DATE N/A N/A N/A N/A NL'.A.

NL'.A NLA NLA NLA Ni A N/A N/A NLA N/A

  • N/A N/A NLA NL'.A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
19. SHUTDOWNS SCHEDULED OVER NEXT6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
20. IF SHUT DOWN ATEND OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: ______
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.l 6-9 FORECAST ACHIEVED 9/30/76 11/01/76 12/20/76 I

CUMULATIVE N/A N/A NL'.A NL'.A

./

N/A N/A NL'.A N/A N/A NLA l 1

NL'.A NL'.A N/A NL'.A

APPENDIX D DOCKET NO.

5*0-212 UNIT SHUTDOWNS AND POWER.REDUCTIONS UNIT NAME Sal.em No. l*;,

l)ATE 11/1/76

~OMPLETED BY J.M. Zupko, Jr.

REPORT MONTH

_o;:;.;c::;..:T:;,..;O:;,,;;;B;;..;:E~R;;....=:1.:..9..;..7.:..6 -

TELEPHONE 609-:-365-7000 Ext. 507 METHOD OF e

TYPE SHUTTING DOWN F: FORCED DURATION THE REAC.TOR OR NO.

DATE S: SCHEDULED (HOURS)

REASON (1)

REDUCING POWER (2)

CORRECTIVE ACTIONS/COMMENTS (1)

REASON A: EQUIPMENT FAILURE (EXPLAIN)

B: MAINT. OR TEST C: REf-UELlNG D: REGULATORY RESTRICTION E: OPERATOR.TRAINING AND LICENSE EXAMINATION F: AD~llNI~TRATIVE G: OPERATIONAL ERROR (EXPLAIN)

H: OTHER (EXPLAIN)

/

I (2)

METHOD 1: MANUAL 2: MANUAL SCRAM.

3: AUTOMATIC SCRAM 4: OTHER (EXPLAIN)

Information for this report not applicable -.Salem No. 1 initial startup testing.

SUMMARY

\\.___ __ )