ML19030A347

From kanterella
Jump to navigation Jump to search
Submit Monthly Operating Report for the Month of November 1977 for Salem No. 1
ML19030A347
Person / Time
Site: Salem  PSEG icon.png
Issue date: 11/04/1977
From: Heller H
Public Service Electric & Gas Co
To:
NRC/IE, Office of Nuclear Reactor Regulation
References
Download: ML19030A347 (4)


Text

~-*.

._ . PS~G

  • Public Service Electric and Gas Company Salem Generating Station P. 0. Box #168 Hancocks Bridge, New Jersey 08038 November Director, Office of Inspection and Enforcement u.s. Nuclear Regulatory Commission Washington, D.C. 20555

Dear Sir:

MONTHLY OPERATING REPORT SALEM NO. l DOCKET NO. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, 10 copies of the following monthly operating reports for the month of November, 1977 are being sent to you.

  • Appendix B Average Daily Unit Power Level Appendix C Operating Data Report Appendix D - Unit Shutdowns and Power Reductions Sincerely yours, Jp~~

H. J. Heller Manager - Salem Generating Station NOTE: Salem No. 1 has been connnercial since June 30, 1977, The net generation for the one day's commercial operation in June was 20,074 MwH.

JMZ:jcm cc: Mr. Boyce H. Grier (1 Copy)

Director of U.S. NRC Off ice of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, PA 19406 Director, Office of management (2 Copies)

Information and Program Control U.S. Nuclear Regulatory Commission Washington, DC 20555 The Energy People 95-2189 (2M) 10*76

  • APPENDIX B

~GE DAILY UNIT POWER LEVEL e

..:I. \ ,_r '

DOCKET NO. 50-272 UNIT , Salem #1 DATE 11-4-77 COMPLETED BY J.M. Zupko, Jr.

TELEPHONE 609-365-7000 X507 MONTH *.October, 1977 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NET) (MWE-NET) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 .0 0 0 6 22 0 0 7 23 0 0 8 24 0 0 9 25 10 0 26 0 11 0 27 0 12 0 28 0 13* 0 29 0 0 30 0 14

15. 0 0 31 16 . 0 Pg. 2-4 8.1-7.Rl:~

APPENDIX C OPERAT:ING DATA REPORI' - *

. oocmr NO. ____5_0_-_21_2_ _ _ __

....... ~ " ... J UNIT Salem #1 DATE 11-4-77 COOLE'I'ED BY J.M. Zupko, Jr, OPERATING STA'liJS 1.

TELEPHONE

  • REPORI'ING PERIOD: October, 1977 GROSS HOURS IN REPORTING PEUOD:

609-365-7000 X507

____745 .,;....____

2. CURRENTLY All'IEORIZED POWER LEVEL (MWt): 3338MAX.DEPEND.CAPACITY(MWe-NEl'): 1079 DP.SIGN ELECTRICAL RATINGtM'fe-Net): 1090
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net) :_N_o_n_e_ _ _ _ __
4. RF.ASONS FOR RESTRICI'ION (IF ANY) : .

THIS MJN1'H YR TO DATE CUMULATIVE S. NmrfBER OF BJURS REACTOR WAS CRITICAL * * . .----

0.0 1738.6 1738.6

6. REACI'OR RESERVE SHIJTOOWN HOURS * * * * * *
  • O* O o.o 0.0 o.o*_;
  • 1. HOURS GENERATOR ON LINE * * * ....... ---- 1709.3 1709.3 UNIT RESERVE SHtJTOOWN HOURS * . . . * * *
  • 0.0 0.0 0.0 8.
9. GROSS 'lliERMAL ENERGY GENERATED (MJ'IH) * * * *

0 *0 4,810,903 4,810,903 1 10. GROSS ELECIRICAL ENERGY' GENERATED(MWh). *

  • O.o 1,558,940 1,558,940
11. NET ELECTRICAL ENERG'l GENERATED(.Ml'iH). * -3706 1,471,871 1,471,871
12. REACTOR SERVICE FACTOR * * * * * * * * *
  • 0 .o 58.4 58.4 0 .o 58.4 58.4
13. REACTOR AVAILABILITY FACTOR * * * * * * * .*

0.0 57.4 57.4

14. UNIT SERVICE FACTOR * * * *
  • II e e ** - - - -

o*, 5'7.4 57.4

15. UNIT AVAILABILITf FACl'OR * * * *
  • O O* o o 0

0 UNIT CAPAC!IY FACIOR(Using MDC). * . . . . .

o*.o 45.8 45.8 16.


o.o 45.4 45.4

17. T.lNIT CAPACITl FACTOR(Using Design MWe)
  • 0.0 8.79 8.79
18. UNIT FORCED OUTAGE RATE * * * * * , * , , ,
19. SHUTIXJWNS SCHEDULED OVER NrXI' 6 MJNrn.S(TYPE,DATE,.AND DURATlON OF EAal):
20. IF SHUr OOlffl AT END OF REFORI' PERIOD, ESTIMATED DATE OF sr.~: Nov. 18r 1977
21. UNITS IN TESl" ST.ATOS (PRIOR TO CC?vMERCIAL OPERATION) : FORECAST . AC-IIEVED mrrIAL CRITICALI'lY 9-30-76 12-11-76 INITIAL ELECilUCITY 11-01-76 12-25-76 Pg, :3-4 CCMteRCIAL OPERATION 12-20-76 *6-30-77 8-1-7.Rf I_

APPENDIX D DOCKET NO. 50-272 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAfllli Salem #1 DATE J.M. Zupko, Jr.

COMPLETED BY 609-365-7000 X507 TELEPHONE - - - - - - - - -

REPORT MONTH October, 1977 METHOD OF TYPE OUTAGE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS/COMMEN'I'S77-118 9-16-77 s 745. B 1 Planned OUtage.

SUMMARY

*LOAD REDUCTION.

Pg.4-4 8.1-7.R 1

'------------------ -