ML19030A371

From kanterella
Jump to navigation Jump to search
Submit Monthly Operating Report for the Month of November 1976 for Salem No. 1
ML19030A371
Person / Time
Site: Salem  PSEG icon.png
Issue date: 12/01/1976
From: Heller H
Public Service Electric & Gas Co
To:
NRC/IE, Office of Nuclear Reactor Regulation
References
Download: ML19030A371 (4)


Text

OPS~G

  • e R.E~Ut~r~~w ~~C~(fF flt[

Public Service Electric and Gas Company Salem Nuclear Generating Station P. 0. Box 168 Hancocks Bridge, N.J. 08038 December 1, 1976

Dear Sir:

MONTHLY OPERATING REPORT SALEM NO. 1 DOCKET NO. 50-272 In compliance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, and USNRC Regulatory Guide 1.16, 10 copies of the following monthly operating reports for the month of November 1976 are hereby submitted:

Appendix B - Average Daily Unit Power Level Appendix C - Operating Data Report Appendix D - Unit Shutdowns and Power Reduc_tions Sincerely yours,

-* ,/o/J 1/1/7 /

r;:;:JJ,.1<-/~.e:,~

H. J. Heller Manager - Salem Generating Station CC: Mr. James P. O'Reilly ( 1 Copy)

Director of U.S. NRC Off ice of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pa. 19406 t,..Bi'rector, Office of Management ( 2 Copies)

Information and Program Control U.S. Nuclear Regulatory Commission Washington, D.C. 20555 New Jersey - 200 Years of Energy Leadership!

95-2189 (2M) 11-75

APPENDIX B AVERAGE DAILY UNIT- POWER LEVEL 50- 272 .

DOCKET NO.

UNIT Salem No. 1 DATE _1_2~/_l__/~7_6_

COMPLETED BY J.M. Zupko, Jr.

TELEPHONE 6 o 9 -~Gs- 7 oo~

. Ext. 50/

MONTH NOVEMBER 1976 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Nct) (MWe-Nct) 1 NLA - See Below* 17 N/A 2 N/A 18 NL'.A 3 N/A 19 N/A 4 N/A 20 N/A

)

. ./

5 21 N/A 6 *N/A 22 N/A 7 23 N/A 8 N/A 24 N/A 9 NL'.A 25 N/A 10 N/A 26 N/A

,, NLA 27 NL'.A 12 NL'.A 28 N/A 13 NLA 29 N/A 14 NL'.A 30 N/A 15 N/A 31 N/A 16 NL'.A

  • Salem No. 1 Unit limited to 1% of core thermal power by operating license No. DPR-70.

INSTRUCTIONS Ou thi:; form, list the average daily unit power ll!vd in MWe*Nd for c:id1 d:1) in thl! rcplirting month. (\impute to iii~

1 nc:ircsl whole 1m~gawall.

111esc figures will be used lo plot a g.rnph for c:1d1 rl'pm ling 11wn1h. Note !lt;1t wl11:n 111:1xim11m dc11~'11d:1bl~* 1.*:1padty is Used fm the 111.*( clel*trh:ai r:1ti11~ llr the llllil, there lll:1y be tll. 1.":1sirn1s when the daily aver:1t~e power kwl l'Xn*cds lht:

0 I 00 1,~:. line (or the n~stril.:ted. pOWl~r lc\'el line). lu sud1 i::m:s. the av1:rag.l~ uaily 1111it power \lUlput ~h1.*~*t should b1:

footnoted lo cxplaiu. !hi: app:.1rc11t anom:tly.

l. l 6°8

APPENDIX C OPERATING DATA REPORT DOCKET NO. _s~o~-~2~7-2..___ _~

UNIT Salem No. l

. DATE 12/1/76' COMPLETED BY J

  • M* Zupko, Jr.

TELEPHONE 609-365-7000 Ext. 507 OPERATING STATUS

1. REPORTING PERIOD: NOVEMBER 1976 GROSS HOURS IN REPORT.ING PERIOD: _ _.7_.2,...0..___ _ _ __

to be

2. CURRENTLY AUTHORIZED POWER LEVEL {MWtl: 3 3.

DESIGN ELECTRICAL RATING (MWe-Net): 10 90 38 MAX. DEPEND. CAPACITY (MWe-Notl: determin'ed I

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Nctl: See i tern 4 below
4. REASONS FOR RESTRICTION (IF ANY):
  • Operating license restriction to 1%

of core thermal___ E.QWe-r-.-----* THIS MONTH YR TO DATE CUMULATIVE

5. NUMBER OF HOURS REACTOR WAS CRITICAL .***** , , * , , ** ,
  • _ _N_./._A __ N/A N/A G. REACTOR RESERVE SHUTDOWN HOURS ***.**.************ - - - -

N/A N/A N/A

7. HOURS GENERATOR ON LINE *.*.* , *.***** , ****** , ****.

N/A.

_....=..;..j_;....:..=_ N/A N/A

8. UNIT RESERVE SHUTDOWN HOURS ** , *. , , ** , ****.* , **** , _ _N_./ ......A;,.;..__ N/A _ _,N"""/__A -,

_,/

9. GROSS THERMAL ENERGY GENERATED {MWH) *. , **.* , ***.** _...;:N ...../...;A~- N/A N/A
10. GROSS ELECTRICAL ENERGY GENERATED (MWHl , .*.** , ****** _ _N...../_A __ N/A N/A
11. NET ELECTRICAL ENERGY GENERATED (MWHl , ******* , ****. _ _N_,,/_A __ N/A N/A
12. REACTOR SERVICE FACTOR ... , ******** , *. _****.****** , * - - - -
  • N/A N/A N/A
13. REACTOR AVAILABILITY FACTOR . . . . , ****** , * , * , ** , ***.* _...;:,N~/....::A.:_._ N/A N/A
14. UNIT SERVICE FACTOR * , .* , * , .*.* , ***** , * , * , , , *.** , , ** __N..:./_A __ N/A N/A
15. UNIT AVAILABILITY FACTOR .** , , ** , *** , , * , , ** , ***, **** _ _N..:./....;;A.;;......_ N/A N/A
16. 'UNIT CAPACITY FACTOR (Using MDC) **..*.**************** _ _N..:./_A __ N/A N/A
17. UNIT CAPACITY FACTOR (Using Design MWcl ******* , **** , , *** __N..;./_*A __ N/A N/A
18. UNIT FORCED OUTAGE RATE .** , ************* , ****** , , _ _ N....../_A__ N/A N/A
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACn):
20. IF SHUT DOWN AT'END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 9/30/76 INITIAL ELECTRICITY 11/01/76 COMMERCIAL OPERATION 12/20/76 1.16*9

s*o-21~

APPENDIX D DOCKET NO.

UNIT SHUTDOWNS AND POWER .REDUCTIONS UNIT NAME *Sal.em ~o. 1 I;>ATE 12/1/76

<;:OMPLETED BY J.M. Zupko, Jr.

TELEPHONE 609-:-365-7000 REPORT MONTH NOVEMBER 1976 Ext

  • 507 METHOD OF TYPE SHUTTING DOWN F; FORCED DURATION THE REAC.TOR OR NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER (2) CORRECTIVE ACTIONS/COMMENTS (1) REASON A: EQUIPMENT FAILURE (EXPLAIN)

B: MAINT. OR TEST C: REFUELING D: REGULATORY RESTRICTION E: OPERATOR.TRAINING AND LICENSE EXAMINATION f; ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)

II: OTHER (EXPLAIN)

(2) METHOD l: MANUAL 2: MANUAL SCRAM.

3: AUTOMATIC SCRAM

. 4: OTHER (EXPLAIN)

Information for this report not applicable - Salem No. 1 initial startup testing.

SUMMAHY:

\.___ )