ML19030A364
| ML19030A364 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 03/03/1977 |
| From: | Heller H Public Service Electric & Gas Co |
| To: | NRC/IE, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML19030A364 (4) | |
Text
--:-.-
PS~G Public S.ervice Electric.and Gas Company Salem Nuclear Generating Station P.O. Box #168 Hancocks Bridge, New Jersey 08038 Director Off ice of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 MONTHLY OPERATING REPORT SALEM GENERATING STATION March 3, 197 Appendix B -
Average Daily Unit Power Level Appendix C -
Operating Data Report Appendix D -
Unit Shutdowns and Power Reductions Additional copies of the Monthly Operating Reports are being sent to:
- 1.
Mr. James P. O'Reilly Director of US NRC Off ice of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, PA 19406
- 2.
Director, Office of Management Information and Program Control US Nuclear Regulatory Commission Washington, D.C.
20555 H. J. Heller (1 Copy)
- (2 Copies)
Manager -
Salem Generating Station Enc.
Pg. 1-4 8-1-7. Rl The Energy People 95-2189 (SM) 10-72 l
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL MONTH February DAY AVERAGE DAILY POWER LEVEL 1
2 3
4 5
6 7
8 9
10 11
.12 13 14 15 16.
_ Pg. 2-4 8.1-7.RL, (MWe-NET) 117 49 81 107 110 119 190 260 231 115 131 289 299 346 484 464 DOCKET NO.
50-272 UNIT, Salem No. 1 DATE 3-3-77 COMPLETED BY J.M. Zupko Jr.
TELEPHONE 609-365-7000 X507 DAY AVERAGE DAILY POWER LEVEL (MWE-NET) 17 462.
18 456 19 484 20 440 21 380 22 468 23 459 24 259 25 0
26 0
27 0
28 0
29 30 31
-4~:->*,,
\\......
Pg. 4 8-1-7.Rf e
.APPP.NDIX C OPERA'I'.ING DATA REPORT.*
tccXET ro.
so-2 72
~~~~----
UNIT Sal em No. 1 DATE 3-7-77 CCMPLEl'ED El J. M. Zupko Jr.
OPERATING STA'IUS TELEPHONE
- 609-365-7000 Ext. 507
- l. REPORTING PERIOD:
February GROSS HOURS IN REPORTING PERIOD:
6 72
---=-~----
To Be
- 2.
CURRF.Nl'LY AUTHORIZED FOWER LEVEL (MWt): 3338 MAX.DEPEND.CAPACI'I'Y(.MWe-NEr) :Determined DESIGN ELECTRICAL RATING(MWe-Net): 1090-
- 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (.M'te-Net):
None
~--~~~~~~
- 4.
REASONS FOR RESTRICTION (IF.ANY):.
T'.dIS MJNl11 YR TO DATE Ct.JMDLATIVE
- s.
NtMBER OF BJtmS REACTOR WAS CRITICAL * * *
- 54 5.1.
1026.6 1328.2
- 6.
REACI'OR RESERVE SHUTOOWN HOURS * * * * * *
- 0.0 0.0 0.0
- 1.
HOURS GENERATOR ON LINE * * * * * * * * *
- 528. 5 784.6 824.9
- 8.
UNIT RESERVE SHUTOOWN HOURS * * * * * * *
- 0.0 0.0 0.0
- 9.
GROSS mERMAL ENERGY GENERATED Qrn'IH) * * *
- 658284 904298 952995
- 10.
GROSS ELECI'RICAL ENERG'1' GENERATED (MWH) * *
- 185830 239120 242350
- 11.
NET ELECTRICAL ENERGY GENERATED {Ml'iH) * * *
- 161500 189375 189375
- 12.
REACl'OR SERVICE FACTOR * * * * * * * * *
- N/A N/A N/A
- 13.
REACTOR AVAILABILIT'f FACTOR *******.*
N/A N/A
_NIA
- 14.
UNIT SERVICE F ACI'OR * * ** * * * * * * * *
- N/A N/A N/A lS *. UNIT AVAIWILIT'f FACTOR * * * * ******
- 16.
UNIT CAPACITY' FACI'OR(Us:ing MOC). * * * * *
- N/A N/A N/A
- 17. UNIT OOACIT'f FACTOR(Us:ing Design MWe) * *
- N/A N/A N/A
- 18.
UNIT FORCED CUfAGE RATE * * * * *, *, *
- N/A N/A
- m/A
- 19.
SHUTDOWNS SCliEDULED OVER NEcr 6 MJNIHS (TYPE,DATE,.AND DURAT~ON.OF EAOl) :
NONE
- 20.
IF SHU!' OOWN AT END OF REFORI' PERIOD, ESTIMATED DATE OF ST.~: March 3, 1977
- 21.
UNITS IN TEST STATOs (PRIOR TO CC>>iERCIAL OPERATION) :
FORECAST INITIAL CRITICALITI 9-30-7 6 INITIAL ELEC'IRICl'I'Y CCliWERCIAL OPERATION 11-01-76 12-20-76
.. AaIIEVED 12-11-76 12-25-76'
I NO.
77-13 77-14 77-15 77-16 77-17 77-18 77-19
SUMMARY
Pg.4-4 8.1-7.R 1 TYPE F: FORCED DATE S: SCHEDULED 770201 F
770202 F
770202 F
770206 F
770210 F
770211 F
770224 s
APPENDIX D UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH February 19 77 METHOD OF SHtrITING DOWN DURATION TIIE REACTOR OR (HOURS)
REASON REDUCING POWER 14.8 H
3 2.7 H
3 2.9 A
3 2.0 H
1 10.2 H
3 5.4 G
3 105.5 B
3 DOCKET NO.
50-272 UNIT NAME Salem No. 1 DATE 3-3-77
(
COMPLETED BY J. M. Zupko Jr.
TELEPHONE 609-365-7000 EXT. 507 CORRECTIVE ACTIONS/COMMENTS 12 Stln. Gen. Feed Pump Trip 11 Stm. Gen. Feed Pump Trip 11 Stln. Gen. Feed Pump Trip 12A/12B Circulator Trip Main Steam Stop Valve Closure Main Steam Stop Valve Closure Rod Drop Test