ML19030A359

From kanterella
Jump to navigation Jump to search
Submit Monthly Operating Report for the Month of May 1977 for Salem No. 1
ML19030A359
Person / Time
Site: Salem  PSEG icon.png
Issue date: 06/06/1977
From: Heller H
Public Service Electric & Gas Co
To:
NRC/IE, Office of Nuclear Reactor Regulation
References
Download: ML19030A359 (4)


Text

PS~G*

Public Service Electric and Gas Company Salem Nuclear Generating Station P.O. Box #168 Hancocks Bridge, New Jersey 08038 June 6, 1977 Director Off ice of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 MONTHLY OPERATING REPORT SALEM GENERATING STATION In compliance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, the following Monthly Operating Reports for the month of May, 1977 are being sent to you.

(original plus 10 copies}

Appendix B - Average Daily Unit Power Level Appendix C - Operating Data Report Appendix D - Unit Shutdowns and Power Reductions Additional copies of the Monthly Operating Reports are being sent to:

1. Mr. James P. O'Reilly (1 Copy}

Director of us NRC Off ice of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, PA 19406

2. Director, Office of Management Information (2 Copies}

and Program C.ontrol US Nuclear Regulatory Commission Washington, D.C. 20555 H. J. Heller Manager - Salem Generating Station Enc.

Pg. 1-4 8-1-7. Rl The Energy People

...--* APPENDIX B AVERAGE DAILY UNIT POWER LEVEL OOCKET NO. 50-272 UNIT , Salem # 1 DATE June 6, 1977 COMPLETED BY J.M. Zupko, Jr.

TELEPHONE 609-365-7000 X507 MONrn May, 1977 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-NET) (MWE-NET) 1 228 17 983 2 222 18 795 3 203 19 95 4 64 20 961 5 0 21 1087 6 0 22 1045 7 44 23 1072 8 547 24 1027 9 827 25 705 10 987 26 538 920 531 11 27 12 977 28 544 13 975 29 544 568 30 543 14 15 723 31 533 16 935 Pg. 2-4 8.1-7 .Rl.,

APPENDIX C

...._~-* .

-- O~G DATA REPO:.*

  • 50~272
r.o. -------------

UNIT DA:rE Salem #1 June 6, 1977 CCl4PLE1'ED p;f J.M. Zupko, Jr.

OPERATING STAlUS TELEmJNE. 609-362-7000 X507


~

l. REPORTING PERIOD: May, 1977 GROSS HOURS IN REPORTING PERIOD:

744 To Be

2. CURRENTLY AinmRIZED POWER LEVEL (}Mt): 3338 MAX.DEPEND.CAPACITY(MWe-NET) :Detennine::i DESIGN ELECTRICAL RATING(MWe-Net): 1090 3.. PCWER LEVEL TO WHiai RESTRICTED (IF ANY) (MWe-Net) :.___ No_n_e_ _ _ __
4. .l\EASONS FOR RESI'R.tCT!ON (IF AN'i).:

'!HIS MJNTH YR TO DATE CT.MJLATIVE

s.
  • NUMBER OF mt.JRS REACTOR WAS CRITICAL
  • D *
  • 650. a 2,763.1. 3,064.7 6-. REACI'OR RESERVE SHUTOOWN mtmS * * * * ***__o__ 0 0
'/. HOURS GENERftl'OR ON tnm * *
  • 647.0 2,462.5 2,502.8 0 0 <!I 9 * °' * - - - - - - - - - - -

...... ---- ---- ------~

0 0 0

9. _GROSS 1HERMAL ENERGY GENERATED(}1Ml). * *
  • 1,500,554 4,677,542 4,726,239
10. GROSS ELECI'R.ICAL ENERGY' GENERATED(.'MMl) ** o 490,070 1,477,140 1,480,370

. 11. NET *mCI'RICAL amRGY GENERATED(MlliH) **

.. . . ---- 458,636 N/A 1,33~,344

---~

N/A 1,339,344


N/A 12 *. REACI'OR SERVICE F.ACTOR * *. * .. * * * * * *

13. REACTOR AVAJ.WnJ:r'! FACTOR
  • 0 0
  • N/A N/A N/A
  • * .-*-:o - - - -
14. llNIT SERVICE F.ACI'OR * * * * * * * * *
  • 0
  • __ N_/A_ N/A . N/A lS. UNIT AVIJ.l>>Jnm FACTOR . . . . . . . . e * *_ _ N..;../_A_ N/A N/A
16. UNIT CAPN:IT'! FACTOR(Using MDC). * .. * * " *_ _N_/A_ __N_/_A_ N/A
17. tIN1T CKPJ.O:r'! FAC'l'OR(Us:ing Design MWe)
  • 0 *. _ _ N....

/A_ __N_/_A__ _ __N_/A _ __

18. tlNIT FORCED cur.AGE RATE * * * * * * * ** * *

N/A 19*. SEI.ll'WllNS SCHEDULED OVER NEXT 6 IDNIES(T'fPE,DAT.E,AND DURATJ;ON OF EAQi): 9-17-77 N/A N/A Modification of Il::M Pressure Tul:bine Blading, Eight Weeks.

  • ZO.

Zl.

IF SIDI' IXJl~N AT END OF RE?ORI' PERIOD, ESTIMA'l.r.u DA!:E OF S!..WUP:

tJNITS IN TEST. STA'.11JS (PRIOR TO CCM-1ERCIAL OPERATION) : FO~CAST N/A

. AC-ilEVED INlTIAL CRlTICALITl 9-30-76 12-11-76 INITIAL ELECTRIClTf 11-01-76 12-25-76 Pg. 4.

8-1~7.Rl- <DMERCIAL OPERATION 12-20-76 .

APPENDIX D DOCKET NO. 50-272 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Salem #1 < '~

DATE June 6, 1977 {

COMPLETED BY J.M. Zupko, Jr.

TELEPHONE 609-365-7000 X507 REPORT MONTH May, 1977 METHOD OF TYPE OUTAGE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO. DATE S: SCHEDULED (HOURS) REASON REDUCING POWER CORRECTIVE ACTIONS/COMMENTS 77-34 770504 F 79.6 'B 3 Turbine Generator taken off line manually to repair valves 1CV132, 1CV68. Reactor later tripped due to 14 Sbn. Gen. I.Dw Level/High Strn. Flow.

77-35 770513 F 0.0 B 4 Clean 11 and 12 Steam Gen. Feed Pump Strainers.

77-36 770516 F o.o B 4 Clean 11, 12 and 13 Condensate Pump Strainers.

77-37 770518 F 17.4 B 4 Venting of Pressurizer Level Transmitter. Turbine Generator taken off line manually - Reactor kept critical.

,/

I

SUMMARY

*LOAD REDUCTION.

Pg.4-4 8.1-7.R 1